Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML17354B1231998-09-30030 September 1998 Summary of 980914 Meeting with Licensee at Turkey Point Plant in Florida City,Fl to Discuss with Licensee Requests for Exemptions from Technical Requirements of App R to 10CFR50 for Certain Outdoor Fire Zones & Turbine Structure ML20136A8611996-11-27027 November 1996 Partially Withheld Summary Meeting W/Florida Power & Light Held on 961121 Re General Update on FPL Nuclear Plants ML17353A6451996-04-17017 April 1996 Summary of 960404 Meeting W/Util in Rockville,Md to Discuss Thermal Uprate Submittal ML17352A9461994-12-0808 December 1994 Summary of 941129 Meeting W/Util in Rockville,Md Re NRC Request for Addl Info Issued on 941012 Following Review of Util 940615 Exemption Request Re Thermo-Lag Fire Barriers. Attendees Listed in Encl 1 ML17309A5481994-06-21021 June 1994 Summary of 940519 Meeting W/B&W in Rockville,Md Re Reactor Vessel Integrity.Meeting Attendees Listed in Encl 1 ML17352A5571994-04-19019 April 1994 Summary of 940414 Meeting W/Util in Rockville,Md Re Approach to Resolving Proposed Resolution of Thermo-lag Issue for Plants.List of Attendees Encl ML17352A1911993-07-28028 July 1993 Summary of 930720 Meeting W/Util in Rockville,Md Re Proposed Resolution of Three Programmatic Issues Re GL 87-02 Noted During 930406 Meeting.List of Attendees Encl ML20138E1261993-06-0404 June 1993 Summary of 930602 Meeting W/Util Re Merits of Biometric Access Control Sys That Util Desires to Use at Plants.List of Attendees & Meeting Handouts Encl ML20138E0781993-04-12012 April 1993 Summary of 930406 Meeting W/Util in Rockville,Md Re Three Issues Involving Seismic Qualification of Electrical & Mechanical Equipment at Plant.List of Attendees Encl ML17349A3101992-07-21021 July 1992 Summary of 920707 Meeting W/Util in Rockville,Md Re Current Status & Plans for Plants.Handout Encl ML17349A2441992-05-29029 May 1992 Summary of 920520 Meeting W/Util in Juno Beach,Fl Re Technical & Mgt/Administrative Issues of Common Interest to Facilities.Agenda,Attendance List & Viewgraphs Encl ML17348B4711992-04-22022 April 1992 Summary of 920421 Meeting W/Util in Rockville,Md Re Status of Active Licensing Actions ML17348B4011992-02-21021 February 1992 Summary of 920218 Meeting W/Util in Rockville,Md Re Status of All Active Licensing Issues ML17348A5791990-09-26026 September 1990 Summary of 900830 Meeting W/Util Re Clarification of Sections of NRC Safety Evaluation on Station Blackout Rule ML17348A2101990-04-25025 April 1990 Summary of 900409-11 Meeting W/Util in Rockville,Md Re Emergency Power Sys Enhancement.Agenda & List of Attendees Encl ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20207J1611988-08-25025 August 1988 Summary of 880818 Meeting W/Util in Rockville,Md Re Tech Specs Conversion.List of Attendees & Agenda Encl ML17345A1971988-05-23023 May 1988 Summary of 880518 Meeting W/Licensee in Bethesda,Md Re Integrated Schedule for Plant.Attendance List Encl ML17342B1491988-02-0909 February 1988 Summary of 880128 Meeting W/Util in Bethesda,Md Re Tech Specs Rev Project.Meeting Attendees & Agenda Encl ML17342B0441987-12-22022 December 1987 Summary of 871215 Meeting W/Util at NRC Headquarters Re Recent & Past Problems,Root Causes & Intended Corrective Measures.Licensed Operators Exhibited Apparent Lack of Professionalism When Not Under Direct Scrutiny ML20236N6501987-11-10010 November 1987 Trip Rept of 871104 & 05 Site Visit Re Recent Operating Events Involving Intake Cooling Water Sys,Identification of Root Causes,Adequacy of Corrective Actions Implemented & Planned & Licensee Ongoing Efforts in Sys Mods ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20235Z5891987-10-0808 October 1987 Summary of 871006 Operating Reactor Events Meeting 87-34 Re Events Occurring Since 870929 Meeting.List of Attendees & Presentation Matl Encl ML17347A5901987-06-23023 June 1987 Summary of 870604 Meeting W/Util in Bethesda,Md Re Proposed Upgrade/Enhancement of Existing Onsite Ac Power Sys.List of Attendees & Licensee Presentation Encl ML20215C1851987-06-0808 June 1987 Summary of 870602 Operating Reactors Events Meeting Re Briefing Senior Managers from Nrr,Res.Aeod & Regional Ofcs on Events That Occurred Since 870526 Meeting,Attendees List, Meeting Viewgraphs & Summary of Reactor Scrams Encl ML17347A2011986-12-11011 December 1986 Summary of 861118 Meeting W/Util in Bethesda,Md Re Rev to Facility Tech Specs.List of Attendees,Licensee Presentation & Tech Spec Conversion Schedule Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20212N6801986-08-27027 August 1986 Summary of Operating Reactor Events Meeting 86-30 on 860825 to Discuss Events Which Occurred Since Last Meeting on 860818 ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20149C1001986-06-20020 June 1986 Discusses Attendance at 860528 & 29 INPO Accreditation Board Meetings.Board Attendees Listed & Major facility-specific Issues & Util Responses Discussed.Evaluation Method Appears Effective Overall.Nrc Involvement Should Be Maintained ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20202G4981986-05-22022 May 1986 Summary of ACRS Reactor Operations Subcommittee 860409 Meeting in Washington,Dc.Schedule of Items Covered, Attendance List & Meeting Handouts Encl ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20203M9431986-04-25025 April 1986 Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl ML20205J9221986-04-18018 April 1986 Summary of ACRS 312th Meeting on 860410-12 in Washington,Dc Re Proposed NRC Safety Goal Policy Statement & Need for Guidance in Environ & PRA for Quantification of Public Health Risks to Nearby Populations ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20141N6831986-03-0707 March 1986 Summary of Operating Reactors Events Meeting 86-05 on 860224.Lists of Attendees,Events & Significant Elements Discussed & Assignment of Followup Review Responsibility Encl ML20214E3351986-03-0606 March 1986 Summary of 851121-22 Site Visits Re Wrong Unit/Wrong Train Events as Part of short-term Effort to Determine Whether Simple Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Stated Events ML20205J7411986-02-28028 February 1986 Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 Core ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20205H8791986-01-22022 January 1986 Summary of Operating Reactor Events Meeting 86-02 on 860116 in Bethesda,Md Re Events Since 860106 Meeting.List of Attendees,List of Significant Elements of Events,Assignments & Status of Previous Assignments Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML17342A3121985-12-0404 December 1985 Summary of 851003 Meeting W/Util in Bethesda,Md Re Reactor Vessel Flux Reduction Fluence Calculations to Resolve Pressurized Thermal Shock Issue.Agenda & Viewgraphs Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 1998-09-30
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML17354B1231998-09-30030 September 1998 Summary of 980914 Meeting with Licensee at Turkey Point Plant in Florida City,Fl to Discuss with Licensee Requests for Exemptions from Technical Requirements of App R to 10CFR50 for Certain Outdoor Fire Zones & Turbine Structure ML20136A8611996-11-27027 November 1996 Partially Withheld Summary Meeting W/Florida Power & Light Held on 961121 Re General Update on FPL Nuclear Plants ML17353A6451996-04-17017 April 1996 Summary of 960404 Meeting W/Util in Rockville,Md to Discuss Thermal Uprate Submittal ML17352A9461994-12-0808 December 1994 Summary of 941129 Meeting W/Util in Rockville,Md Re NRC Request for Addl Info Issued on 941012 Following Review of Util 940615 Exemption Request Re Thermo-Lag Fire Barriers. Attendees Listed in Encl 1 ML17309A5481994-06-21021 June 1994 Summary of 940519 Meeting W/B&W in Rockville,Md Re Reactor Vessel Integrity.Meeting Attendees Listed in Encl 1 ML17352A5571994-04-19019 April 1994 Summary of 940414 Meeting W/Util in Rockville,Md Re Approach to Resolving Proposed Resolution of Thermo-lag Issue for Plants.List of Attendees Encl ML17352A1911993-07-28028 July 1993 Summary of 930720 Meeting W/Util in Rockville,Md Re Proposed Resolution of Three Programmatic Issues Re GL 87-02 Noted During 930406 Meeting.List of Attendees Encl ML20138E1261993-06-0404 June 1993 Summary of 930602 Meeting W/Util Re Merits of Biometric Access Control Sys That Util Desires to Use at Plants.List of Attendees & Meeting Handouts Encl ML20138E0781993-04-12012 April 1993 Summary of 930406 Meeting W/Util in Rockville,Md Re Three Issues Involving Seismic Qualification of Electrical & Mechanical Equipment at Plant.List of Attendees Encl ML17349A3101992-07-21021 July 1992 Summary of 920707 Meeting W/Util in Rockville,Md Re Current Status & Plans for Plants.Handout Encl ML17349A2441992-05-29029 May 1992 Summary of 920520 Meeting W/Util in Juno Beach,Fl Re Technical & Mgt/Administrative Issues of Common Interest to Facilities.Agenda,Attendance List & Viewgraphs Encl ML17348B4711992-04-22022 April 1992 Summary of 920421 Meeting W/Util in Rockville,Md Re Status of Active Licensing Actions ML17348B4011992-02-21021 February 1992 Summary of 920218 Meeting W/Util in Rockville,Md Re Status of All Active Licensing Issues ML17348A5791990-09-26026 September 1990 Summary of 900830 Meeting W/Util Re Clarification of Sections of NRC Safety Evaluation on Station Blackout Rule ML17348A2101990-04-25025 April 1990 Summary of 900409-11 Meeting W/Util in Rockville,Md Re Emergency Power Sys Enhancement.Agenda & List of Attendees Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20207J1611988-08-25025 August 1988 Summary of 880818 Meeting W/Util in Rockville,Md Re Tech Specs Conversion.List of Attendees & Agenda Encl ML17345A1971988-05-23023 May 1988 Summary of 880518 Meeting W/Licensee in Bethesda,Md Re Integrated Schedule for Plant.Attendance List Encl ML17342B1491988-02-0909 February 1988 Summary of 880128 Meeting W/Util in Bethesda,Md Re Tech Specs Rev Project.Meeting Attendees & Agenda Encl ML17342B0441987-12-22022 December 1987 Summary of 871215 Meeting W/Util at NRC Headquarters Re Recent & Past Problems,Root Causes & Intended Corrective Measures.Licensed Operators Exhibited Apparent Lack of Professionalism When Not Under Direct Scrutiny ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20235Z5891987-10-0808 October 1987 Summary of 871006 Operating Reactor Events Meeting 87-34 Re Events Occurring Since 870929 Meeting.List of Attendees & Presentation Matl Encl ML17347A5901987-06-23023 June 1987 Summary of 870604 Meeting W/Util in Bethesda,Md Re Proposed Upgrade/Enhancement of Existing Onsite Ac Power Sys.List of Attendees & Licensee Presentation Encl ML20215C1851987-06-0808 June 1987 Summary of 870602 Operating Reactors Events Meeting Re Briefing Senior Managers from Nrr,Res.Aeod & Regional Ofcs on Events That Occurred Since 870526 Meeting,Attendees List, Meeting Viewgraphs & Summary of Reactor Scrams Encl ML17347A2011986-12-11011 December 1986 Summary of 861118 Meeting W/Util in Bethesda,Md Re Rev to Facility Tech Specs.List of Attendees,Licensee Presentation & Tech Spec Conversion Schedule Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20212N6801986-08-27027 August 1986 Summary of Operating Reactor Events Meeting 86-30 on 860825 to Discuss Events Which Occurred Since Last Meeting on 860818 ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20149C1001986-06-20020 June 1986 Discusses Attendance at 860528 & 29 INPO Accreditation Board Meetings.Board Attendees Listed & Major facility-specific Issues & Util Responses Discussed.Evaluation Method Appears Effective Overall.Nrc Involvement Should Be Maintained ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20202G4981986-05-22022 May 1986 Summary of ACRS Reactor Operations Subcommittee 860409 Meeting in Washington,Dc.Schedule of Items Covered, Attendance List & Meeting Handouts Encl ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20203M9431986-04-25025 April 1986 Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl ML20205J9221986-04-18018 April 1986 Summary of ACRS 312th Meeting on 860410-12 in Washington,Dc Re Proposed NRC Safety Goal Policy Statement & Need for Guidance in Environ & PRA for Quantification of Public Health Risks to Nearby Populations ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20141N6831986-03-0707 March 1986 Summary of Operating Reactors Events Meeting 86-05 on 860224.Lists of Attendees,Events & Significant Elements Discussed & Assignment of Followup Review Responsibility Encl ML20205J7411986-02-28028 February 1986 Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 Core ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20205H8791986-01-22022 January 1986 Summary of Operating Reactor Events Meeting 86-02 on 860116 in Bethesda,Md Re Events Since 860106 Meeting.List of Attendees,List of Significant Elements of Events,Assignments & Status of Previous Assignments Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML17342A3121985-12-0404 December 1985 Summary of 851003 Meeting W/Util in Bethesda,Md Re Reactor Vessel Flux Reduction Fluence Calculations to Resolve Pressurized Thermal Shock Issue.Agenda & Viewgraphs Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20138L9751985-10-0808 October 1985 Summary of 850725 Meeting W/Licensee Re Integrated Living Schedules Requested by Generic Ltr 85-07.Attendance List, Agenda & Viewgraphs Encl IA-85-663, Summary of 850725 Meeting W/Licensee Re Integrated Living Schedules Requested by Generic Ltr 85-07.Attendance List, Agenda & Viewgraphs Encl1985-10-0808 October 1985 Summary of 850725 Meeting W/Licensee Re Integrated Living Schedules Requested by Generic Ltr 85-07.Attendance List, Agenda & Viewgraphs Encl ML20133F9941985-10-0707 October 1985 Summary of Operating Reactors Events Meeting 85-16 on 850916 Re Briefing of Director,Div Directors & Representatives on Events Occurring Since 850909 Meeting.List of Attendees & Viewgraphs Encl 1998-09-30
[Table view] |
Text
Docket Nos. 50-250 and 50-251 September 26, 1990 LICENSEE: Florida Power and Light Company FACILITY: Turkey Point Plant, Units 3 and 4
SUBJECT:
SUMMARY
OF AUGUST 30, 1990 MEETING WITH FLORIDA POWER AND LIGHT COMPANY A meeting was held with Florida Power and Light, the licensee for Turkey Point Units 3 and 4.
The licensee requested clarification of sections of the staff's Safety Evaluation on Florida Power and Light's proposed implement-ation of the Station Blackout Rule.
Specifically, the licensee wanted to know the staff's position on requiring the capability to cool the non-blacked out unit to cold shutdown conditions.
This question is still under consideration.
The licensee indicated they would document their concerns in a letter to the staff about the end of September, 1990.
An attendance list and the licensee's handout are enclosed.
Enclosures:
As stated cc w/enclosures:
See next page Original signed by Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects Office of Nuclear Reactor Regulation
>>><<><OO8 +OO>>+
~~R PXV OFC
- LA:PD I-2 NAME
- D '
~
WW DATE
- 9/U,/90
~ 9
/90
- PE: PDI I-2
- GJr
- D:PDI
~
i
- HBerk
/
~.-PM: P DII-2 GEdison:sl
~ W A
W&
~
W
- 9/ /90:9/) 5/90
~
~
~
~
~
~
~
~
Document Name:
MEETING
SUMMARY
t 0
t 4
P 1ll 4
I tt 0
t 4 '
I
Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire
,Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr.
K.
N. Harris, Vice President Tur key Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County ill NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S.
Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O
~
Box 029100 Miami, Florida 33102 Mr. J.
H, Goldberg Executive Vice President Florida Power and Light Company P.O.
Box 14000 Juno Beach, Florida 33408-0420
Enclosure I ATTENDANCE August 30, 1990 Name G. Wunder
. C. Fisher H. Berkow J. Williams F.
P. Schiffley II H. P. Horrell V. Pareto Paul Gill Roy Karimi Argi 1 Toa 1 ston Janak Raval Bob Helfrich David Powell Ed Weinkam Remo Gritz Dave Chancy Or anization NRR/PD22 FPL/JPN NRR/PD22 NRR/PD22 FPL/JPN-JB FPL (Ebasco)/Stuart FL Devonroe NRR/DST/SELB SAIC NRR/DST/SELB NRR/DST/SPLB Bishop Cook Parcell
& Reynolds FPL/Turkey Point FPL Nuclear Licensing FPL Nuclear Licensing FPL Nuclear Licensing
ENCLOSURE 2
AGGEADA PURPOSE OF MEETING TURKEY POINT PLANT COMPLIANCE CLARIFICATIONS TO NRC SBO SE ON PTN (JUNE 15, 1990)
SUMMARY
DISCUSSION
1.
PROVIDE ADDITIONAL CLARIFICATION OF FPL'S RESOLUTION TO SBO FOR TURKEY POINT PLANT (PTN) 2.
DOCUMENT FPL'S POSITIONS FOR PURPOSES OF FUTURE INSPECTIONS AND AUDITS
8 R LE MMARY FPL DEVfLOPED A METHODOLOGY TO MfET THE SBO RULE (10 CFR 50 63)
REQUIREMENTS.
THE MfTHODOLOGY AS PROVIDED TO THE NRC (1989 AUDIT),
DEMONSTRATED THAT THE FINAL ANALYSIS WILL:
1.
MEET THE REQUIREMENTS OF 10 CFR 50.63(a) 2.
MEET CRITERIA FOR AAC SOURCE PROVIDED IN 10 CFR 50.63(c) (2) 3.
MEET GUIDELINfS IN R.G. 1.155 AND NUMARC 87-00 APPLICABLE TO AN AAC
8 R
E MMARY
.OPED A METHODOLOGY TO MEET THE SBO RULE (10 CFR 50. 63)
'NTS.
THE METH D HODOLOGY AS PROVIDED TO THE NRC (1989 AUDIT),
ATED THAT THE FINAL ANALYSIS MELL:
=T THE REQUIREMENTS OF 10 CFR 50.63(a)
'.HS ET CRITERIA FOR AAC AAC SOURCE PROVIDED IN 10 CFR 50.63(c) (2)
.'ET GUIDELINES IN R.G.
1 155 AND NUMARC 87-00 APPLICABLE TO I AAC 4XTH
T RKE P I T PLA T (PT MPLIA E
NvzN eo)
AS PRESENTED IN 1989 AUDIT, FPL DEMONSTRATED COMPLIANCE WITH 10 CFR 50. 63 (c) (2)
BY:
A.
DESIGN OF A 10 MINUTE CROSS CONNECT (MAXIMUM SBO DURATION-10 MINUTES)
B.
CONFIRMING EDG HAS CAPABILITYAND CAPACITY TO PLACE 2 UNITS IN HOT STANDBY FOR EXTENDED DURATION (z.a, 8 moves)
P
/
r
/
~t C.
NO COPING ANALYSIS REQUIRED (COMMITTED TO DEMONSTRATED 10 MINUTE INTERTIE)
FPL PROPOSED COMMENTS REGARDING R
B E
PT 1.
APPENDIX A, 10 CFR 50, SINGLE FAILURE REFERENCE (SE 2.2. 1.2)
SHOULD BE DELETED 2.
8 HOUR DURATION IN HOT STANDBY (NO RHR REQUIRED) o REG GUIDE 1.155, PARA 3.3.5 3.
COPING ANALYSIS NOT REQUIRED PER 10 CFR 50,63(c) (2) o 8 HOUR DURATION BASED ON CAPACITY AND CAPABILITY OF ONE EDG "OPTIMUM, FULLY OR MINIMALLY"CRITERIA*
"FULL CONTINGENCY OF LOADS" CRITERIA*
r*UNDEFINED IN REG GUIDE 1.155 OR NUMARC 87-QQl 4.
NORMAL EQUIPMENT COMPLEMENT "-SAFE SHUTDOWN LOADS 5.
EDG RATING, AS PROVIDED IN FSAR, WILL BE UTILIZFO 6.
FOR AUDIT PURPOSES, NRC SBO SE IS REGULATORY BASIS DOCUMENT (NRC SBO TER CONSIDERED NON-BINDING)
Meetin Summar Memoranda for Tri Re orts or Site Visits DISTRIBUTION FOR MEETING
SUMMARY
DATED:
September 26, 1990 Facility:
Turkey Point Unit 3 and 4
i~Docket File NRC 8 Local PDRs F. Miraglia 12/G/18 J. Partlow 14/G/18 PDII-2 Reading S. Varga, 14/E/4 G. Lainas, 14/H/3 H. Berkow G. Edison G. Wunder D. Miller OGC E. Jordan, MNBB-3302 J. Williams P. Gill 7/E/4 A. Toalston 7/E/4 J.
Raval 8/D/1 ACRS (10)
R. Borchardt, 17/G/21 M. Sinkule, RII
I 4
IMI" I 'I II MM I
M M
MM
~
M MMMM nrem
~
M MM~
'I 4
4 ~
M I'
IMM 4 4 HMI M
IM M Il M M I I
I R
IMM 4
CMM NMM" M
~
4 M
M$
~
'I
'