Summary of 900830 Meeting W/Util Re Clarification of Sections of NRC Safety Evaluation on Station Blackout Rule
ML17348A579
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/26/1990
From: Edison G
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9010090008
Download: ML17348A579 (14)


Text

Docket Nos. 50-250 and 50-251 September 26, 1990 LICENSEE: Florida Power and Light Company FACILITY: Turkey Point Plant, Units 3 and 4

SUBJECT:

SUMMARY

OF AUGUST 30, 1990 MEETING WITH FLORIDA POWER AND LIGHT COMPANY A meeting was held with Florida Power and Light, the licensee for Turkey Point Units 3 and 4.

The licensee requested clarification of sections of the staff's Safety Evaluation on Florida Power and Light's proposed implement-ation of the Station Blackout Rule.

Specifically, the licensee wanted to know the staff's position on requiring the capability to cool the non-blacked out unit to cold shutdown conditions.

This question is still under consideration.

The licensee indicated they would document their concerns in a letter to the staff about the end of September, 1990.

An attendance list and the licensee's handout are enclosed.

Enclosures:

As stated cc w/enclosures:

See next page Original signed by Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects Office of Nuclear Reactor Regulation

>>><<><OO8 +OO>>+

~~R PXV OFC

LA:PD I-2 NAME
D '

~

WW DATE

9/U,/90

~ 9

/90

PE: PDI I-2
GJr
D:PDI

~

i

HBerk

/

~.-PM: P DII-2 GEdison:sl

~ W A

W&

~

W

9/ /90:9/) 5/90

~

~

~

~

~

~

~

~

Document Name:

MEETING

SUMMARY

t 0

t 4

P 1ll 4

I tt 0

t 4 '

I

Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire

,Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr.

K.

N. Harris, Vice President Tur key Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County ill NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S.

Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O

~

Box 029100 Miami, Florida 33102 Mr. J.

H, Goldberg Executive Vice President Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420

Enclosure I ATTENDANCE August 30, 1990 Name G. Wunder

. C. Fisher H. Berkow J. Williams F.

P. Schiffley II H. P. Horrell V. Pareto Paul Gill Roy Karimi Argi 1 Toa 1 ston Janak Raval Bob Helfrich David Powell Ed Weinkam Remo Gritz Dave Chancy Or anization NRR/PD22 FPL/JPN NRR/PD22 NRR/PD22 FPL/JPN-JB FPL (Ebasco)/Stuart FL Devonroe NRR/DST/SELB SAIC NRR/DST/SELB NRR/DST/SPLB Bishop Cook Parcell

& Reynolds FPL/Turkey Point FPL Nuclear Licensing FPL Nuclear Licensing FPL Nuclear Licensing

ENCLOSURE 2

AGGEADA PURPOSE OF MEETING TURKEY POINT PLANT COMPLIANCE CLARIFICATIONS TO NRC SBO SE ON PTN (JUNE 15, 1990)

SUMMARY

DISCUSSION

1.

PROVIDE ADDITIONAL CLARIFICATION OF FPL'S RESOLUTION TO SBO FOR TURKEY POINT PLANT (PTN) 2.

DOCUMENT FPL'S POSITIONS FOR PURPOSES OF FUTURE INSPECTIONS AND AUDITS

8 R LE MMARY FPL DEVfLOPED A METHODOLOGY TO MfET THE SBO RULE (10 CFR 50 63)

REQUIREMENTS.

THE MfTHODOLOGY AS PROVIDED TO THE NRC (1989 AUDIT),

DEMONSTRATED THAT THE FINAL ANALYSIS WILL:

1.

MEET THE REQUIREMENTS OF 10 CFR 50.63(a) 2.

MEET CRITERIA FOR AAC SOURCE PROVIDED IN 10 CFR 50.63(c) (2) 3.

MEET GUIDELINfS IN R.G. 1.155 AND NUMARC 87-00 APPLICABLE TO AN AAC

8 R

E MMARY

.OPED A METHODOLOGY TO MEET THE SBO RULE (10 CFR 50. 63)

'NTS.

THE METH D HODOLOGY AS PROVIDED TO THE NRC (1989 AUDIT),

ATED THAT THE FINAL ANALYSIS MELL:

=T THE REQUIREMENTS OF 10 CFR 50.63(a)

'.HS ET CRITERIA FOR AAC AAC SOURCE PROVIDED IN 10 CFR 50.63(c) (2)

.'ET GUIDELINES IN R.G.

1 155 AND NUMARC 87-00 APPLICABLE TO I AAC 4XTH

T RKE P I T PLA T (PT MPLIA E

NvzN eo)

AS PRESENTED IN 1989 AUDIT, FPL DEMONSTRATED COMPLIANCE WITH 10 CFR 50. 63 (c) (2)

BY:

A.

DESIGN OF A 10 MINUTE CROSS CONNECT (MAXIMUM SBO DURATION-10 MINUTES)

B.

CONFIRMING EDG HAS CAPABILITYAND CAPACITY TO PLACE 2 UNITS IN HOT STANDBY FOR EXTENDED DURATION (z.a, 8 moves)

P

/

r

/

~t C.

NO COPING ANALYSIS REQUIRED (COMMITTED TO DEMONSTRATED 10 MINUTE INTERTIE)

FPL PROPOSED COMMENTS REGARDING R

B E

PT 1.

APPENDIX A, 10 CFR 50, SINGLE FAILURE REFERENCE (SE 2.2. 1.2)

SHOULD BE DELETED 2.

8 HOUR DURATION IN HOT STANDBY (NO RHR REQUIRED) o REG GUIDE 1.155, PARA 3.3.5 3.

COPING ANALYSIS NOT REQUIRED PER 10 CFR 50,63(c) (2) o 8 HOUR DURATION BASED ON CAPACITY AND CAPABILITY OF ONE EDG "OPTIMUM, FULLY OR MINIMALLY"CRITERIA*

"FULL CONTINGENCY OF LOADS" CRITERIA*

r*UNDEFINED IN REG GUIDE 1.155 OR NUMARC 87-QQl 4.

NORMAL EQUIPMENT COMPLEMENT "-SAFE SHUTDOWN LOADS 5.

EDG RATING, AS PROVIDED IN FSAR, WILL BE UTILIZFO 6.

FOR AUDIT PURPOSES, NRC SBO SE IS REGULATORY BASIS DOCUMENT (NRC SBO TER CONSIDERED NON-BINDING)

Meetin Summar Memoranda for Tri Re orts or Site Visits DISTRIBUTION FOR MEETING

SUMMARY

DATED:

September 26, 1990 Facility:

Turkey Point Unit 3 and 4

i~Docket File NRC 8 Local PDRs F. Miraglia 12/G/18 J. Partlow 14/G/18 PDII-2 Reading S. Varga, 14/E/4 G. Lainas, 14/H/3 H. Berkow G. Edison G. Wunder D. Miller OGC E. Jordan, MNBB-3302 J. Williams P. Gill 7/E/4 A. Toalston 7/E/4 J.

Raval 8/D/1 ACRS (10)

R. Borchardt, 17/G/21 M. Sinkule, RII

I 4

IMI" I 'I II MM I

M M

MM

~

M MMMM nrem

~

M MM~

'I 4

4 ~

M I'

IMM 4 4 HMI M

IM M Il M M I I

I R

IMM 4

CMM NMM" M

~

4 M

M$

~

'I

'