Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P395 + (20:04:28, 7 December 2024)
- ML20205P393 + (20:04:29, 7 December 2024)
- ML20205P392 + (20:04:29, 7 December 2024)
- ML20205P391 + (20:04:30, 7 December 2024)
- 1CAN049901, Application for Amend to License DPR-51,revising Requirements Associated with ANO 1 Provisions for RB Testing & Insp + (20:04:31, 7 December 2024)
- ML20205P387 + (20:04:31, 7 December 2024)
- RBG-23566, Suppls 860227 Response to Violations Noted in Insp Rept 50-458/85-81.Departmental Review of All Station Operating Procedures in Main Control Room Controlled Copy 3 Conducted & Station Document Control Reassignment Made + (20:04:32, 7 December 2024)
- ML20205P382 + (20:04:34, 7 December 2024)
- IR 05000424/1987018 + (20:04:39, 7 December 2024)
- ML20205P378 + (20:04:39, 7 December 2024)
- ML20205P377 + (20:04:40, 7 December 2024)
- ML20205P376 + (20:04:40, 7 December 2024)
- ML20205P375 + (20:04:41, 7 December 2024)
- ML20205P373 + (20:04:41, 7 December 2024)
- ML20205P371 + (20:04:42, 7 December 2024)
- ML20205P370 + (20:04:43, 7 December 2024)
- ML20205P367 + (20:04:45, 7 December 2024)
- ML20205P368 + (20:04:45, 7 December 2024)
- ML20205P365 + (20:04:46, 7 December 2024)
- ML20205P364 + (20:04:47, 7 December 2024)
- 05000305/LER-1986-005, :on 860417,reactor Trip Occurred During Performance of Work Request on Intermediate-Range Nuclear Channel N35.Caused by Premature Removal of Control Power Fuse + (20:04:49, 7 December 2024)
- 2CAN049904, Informs That Based on Discussions with NRC Re 960823 Amend Request,Addl Info Was Added to TS 5.2.2 Re Control Element Assemblies (Ceas) Section of Proposed Change.Associated TS Page (5-1) Has Been Revised & Encl + (20:04:50, 7 December 2024)
- ML20205P359 + (20:04:51, 7 December 2024)
- ML20205P360 + (20:04:51, 7 December 2024)
- 05000412/LER-1999-004, :on 990312,inadequate Basis for Seismic Instrument Setpoints & Calibration Led to TS Noncompliance. Caused by Discrepancy in Tss.Noncompliances Were Corrected & Appropriate Procedures Were Revised.With + (20:04:55, 7 December 2024)
- TXX-4802, Part 21 & Final Deficiency Rept CP-86-29 Re Gibbs & Hill Acceptance Testing for air-operated Valves in Instrument Air Sys.Initially Reported on 860414.Item Not Reportable Per 10CFR50.55(e) + (20:04:56, 7 December 2024)
- ML20205P354 + (20:04:57, 7 December 2024)
- ML20205P355 + (20:04:57, 7 December 2024)
- ML20205P352 + (20:04:58, 7 December 2024)
- ML20205P353 + (20:04:58, 7 December 2024)
- ML20205P351 + (20:04:59, 7 December 2024)
- 05000346/LER-1986-018, :on 860407,during Stringing of Temporary Instrumentation Cables,Fire/Negative Pressure Breached. Caused by Inadequate Technical Supervision.Test Engineer Released & Test Leader Suspended W/O Pay + (20:05:01, 7 December 2024)
- ML20205P348 + (20:05:02, 7 December 2024)
- ML20205P349 + (20:05:02, 7 December 2024)
- ML20205P347 + (20:05:03, 7 December 2024)
- 05000412/LER-1999-003-01, :on 990311,containment Equipment Hatch Was Not Completely Closed During Refueling Operations.Caused by Failure to Understand Supporting Function of Chain Hoists. Revised Procedure.With + (20:05:05, 7 December 2024)
- ML20205P345 + (20:05:06, 7 December 2024)
- ML20205P342 + (20:05:09, 7 December 2024)
- ML20205P341 + (20:05:10, 7 December 2024)
- ML20205P340 + (20:05:10, 7 December 2024)
- ML20205P339 + (20:05:11, 7 December 2024)
- ML20205P338 + (20:05:12, 7 December 2024)
- ML20205P336 + (20:05:13, 7 December 2024)
- ML20205P334 + (20:05:13, 7 December 2024)
- ML20205P333 + (20:05:14, 7 December 2024)
- ML20205P332 + (20:05:15, 7 December 2024)
- ML20205P331 + (20:05:16, 7 December 2024)
- ML20205P330 + (20:05:16, 7 December 2024)
- ML20205P328 + (20:05:17, 7 December 2024)
- ML20205P329 + (20:05:17, 7 December 2024)
- ML20205P326 + (20:05:18, 7 December 2024)
- ML20205P324 + (20:05:19, 7 December 2024)