APR 3 0 986 1
Flo,rida Power and Light Company kTTN: Mr. C. O. Woody Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
CONFIRMATION OF E:lFORCEMENT MEETING ARRANGEMENTS - TURKEY POINT &
ST. LUCIE,-DOCKET NOS. 50-250, 50-251, 50-335 AND 50-389 This confirms the conversation between Mr. J. W. Dickey of your staff, and Mr. D. M. Verrelli of my staff, on April 25, 1986, concerning an enforcement conference to be held at the Florida Power and Light Company's Juno Beach office at 8:30 a.m., on May 9, 1986. We requested this meeting to discuss a number of j
significant issues at your Turkey Point and St. Lucie facilities, as described in the enclosed meeting agenda.
Should you have any questions regarding these' arrangements, we will be pleased to discuss them.
Sincerely,
\\s\\ q. A J. Nelson Grace j
Regional Administrator
Enclosure:
Proposed Meeting Agenda jc'w/enci:
J. W. Dickey, Vice President
, Nuclear Operations tC. M. Wethy, Vice President
, Turkey Point Nuclear Plant d N. Harris, Vice President St. Lucie Nuclear Plant
% J. Baker, Plant Manager Jurkey Point Nuclear Plant i.fT. A. Sager, Plant Manager St. Lucie Nuclear Plant j
.bc w/ encl:
nC Resident Inspectors Do ument Control Desk State of Florida RII RII RII RII RII I
RI R(
.a
~#
C, L
7f 9
$t'Reyes bWalker FGuenther:jd SElrod DVerrelli GJen ins AG son 4/q/86 4p/86 4/q/86 4/A/86 4/ vt/86 4/d /86 4/
'86 8605210362 860430 DR ADOCK 05000250 PDR g
+
-. _ _.. - _. -., - - _. - - -, - _.,,. - ~.,.. - - _,.... - -, -. -
Apg 3 01986 ENCLOSURE Proposed Meeting Agenda FLORIDA POWER AND LIGHT COMPANY MEETING WITH NRC May 9, 1986, 8:30 a.m.
I.
Introduction J. N. Grace II.
St. Lucie Issues a.
Vital Area Barrier Control b.
Radioactive Waste Shipping-Package Degradation c.
Radicactive Waste Shipping-Package Surface Radiation Levels III. Turkey Point Issues a.
Unit 3 Startup with a High Head Safety Injection (HHSI) Pump Out-of-Service b.
Component Cooling Water (CCW) System Flow Imbalance c.
CCW Piping to HHSI Pump Coolers Improperly Installed d.
Residual Heat Removal System Valve Settings e.
Intake Cooling Water System Design and Testing f.
Changing Emergency Diesel Generator Loads without Prior Evaluation IV. Closing Remarks J. N. Grace l