ML20205P334

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/87-18 on 870309-12.No Violations or Deviations Noted
ML20205P334
Person / Time
Site: Vogtle 
Issue date: 03/26/1987
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20205P337 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8704030242
Download: ML20205P334 (3)


See also: IR 05000424/1987018

Text

W IC &

y

,.

MM 2 61987

-

.

Docket Nos. 50-424

License Nos. NPF-61

"prgia Power Company

VATTN: Mr. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-424/87-18

This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by

W. T. Cooper on March 9-12, 1987.

The inspection included a review of

activities authorized for your Vogtle Electric Generating Plant.

At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are . identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report

cc w/ encl:

(See page 2)

8704030242 870326

PDR

ADOCK 05000424

G

PDR

'

1

Y

- --

_

__-

_

,

g

.

.

,

<

.

'

.

Georgia Power Company

2

ccfw/ encl:

g;Y.. E. Conway, Senior Vice President &

froject Director

g. Whitney, General Manager Project

Support

W. D. Rice, Vice President, Project

Engineering

d H. Pinson, Vice President, Project

Construction

M W. Hayes, Vogtle Quality

Assurance Manager

t&.# B. Bockhold, General Manager,

Nuclear Operations

12. Gucwa, Manager, Nuclear Safety

and Licensing

g A. Bailey, Project Licensing

d. Manager

W. Churchill, Esq., Shaw,

fittman, Potts and Trowbridge

(7. E. Joiner, Troutman, Sanders,

y ckerman and Ashmore

br. G. Ledbetter, Connissioner,

pepartment of Human Resources

W. H. Badger, Office of Planning

and Budget

g Kirkland, III, Counsel,

Office of the Consumer's Utility

jCouncil

(#. Feig, Georgians Against

Juclear Energy

(Y. B. Margulies, Esq. , Chairman,

Atomic Safety and Licensing Board

Panel

'

M 0. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

IV A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

bcc w/ encl:

(Seepage 3)

_

_ _ ,

,

__,

.~

.

.

.

.

  • .

g

.,

.

Georgia Power Company

3

i

c w/ encl:

. Reis, 0GC

.

(g.M. Hill,IE

Miller, NRR-

g.Brach,ED0

M. Sinkule, RII

J.Christnot,RII

VNRC Resident Inspector

Document Control Desk

State of Georgia

J

!

i

l

!

!,

.

l

RII

RII

R

RII

WT

per

CHos

DCgl, lins

MSinkule

3/N/87

3p/87

3/Ql/87

3/ /87

J

p

, . _. _ . . ._n.

_ . . . , . . . . . . . , ,

. _ _ .

_ . . , . , , , , . , -

_

_ . , ,

_

,

,

-..,,4-,.,

y,.,,

,,- ,

,