Revised Monthly Operating Rept for Mar 1986
ML20205P333
Person / Time
Site: Maine Yankee
Issue date: 03/31/1986
From: Jacobs S, Taylor J
Maine Yankee
To:
Shared Package
ML20205P310 List:
References
NUDOCS 8605210343
Download: ML20205P333 (4)


Text

.-

OPERATING DATA REPORT Docket No.:

50-309 Date:

05/May/86 Completed By:

Steven L Jacobs Telephone:

207-882-6321 1.

Unit Name.......................................

Maine Yankee

2. Reporting Period................................

March 1986

3. Licensed Thermal Power (MWt)....................

2630

4. Nameplate Rating (Gross MWe)....................-

864 5.

Design Electrical Rating (Net MWe)..............

825 6.

Maximum Dependable Capacity (Gross MWe).........

850

7. Maximum Dependable Capacity (Net MWe)...........

810 8.

If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

NO CHANGES 9.

Power Level to Which Restricted, if Any (Net MWe)

NO RESTRICTIONS

10. Reasons for Restrictions, if Any:

THIS MONTH YEAR-TO-DATE CUMULATIVE

11. Hours In Reporting Period 744.00 2.160.00
12. Number of Hours Reactor Was Critical...........

485.33 1.734.79 94.072.51

13. Reactor Reserve Shutdown Hours..................

0.00 0.00 0.00

14. Hours Generator On-line..

480.83 1.709.58 91.354.24

15. Unit Reserve Shutdown Hours..................

0.00 0.00 0.00

16. Gross Thermal Energy Generated (MWH)........

1.173.279.00 4.211.231.00 206.211.912.00

17. Gross Electrical Energy Generated (MWH)........

396.680.00 1.416.700.00 67.656.420.00

18. Net Electrical Energy Generated (MWH)........

383.807.00 1.369.973.00 64.556.288.00

19. Unit Service Factor......

64.63 79.15 77.82

20. Unit Availabilty Factor..

64.63 79.15 78.61

21. Unit Capacity Factor (Using MDC Net)........

63.69 78.30 69.72

22. Unit Capacity Factor (Using DER Net)........

62.53 76.88 67.86

23. Unit Forced Outage Rate..

0.00 1.07 6.76

24. Shutdowns Scheduled Over Next 6 Months:

NONE

25. If Shutdown at End of Report Period, Estimated Date of Startup:

N/A h

O R

UNIT SHUTDOWNS AND POWER REDUCTIONS Docket No.:

50-309 FOR MARCH 1986 Unit:

Maine Yankee Date:

05/May/86 Completed By:

Steven L Jacobs Telephone:

207-882-6321 Page:

1 of 1 Number 8-86-9 Dnto 860221 Type (1)

S Durction (Hours) 263.2' R3aton (2)

B Method (3) 1 LER #

N/A System Cod 2 (4)

HA Component Coda (5)

GENERA-D Shutdown to repair hydrogen leakage from Main Generator.,

Cruze and Corrective This outage is Action carried over from last month.

9 1.

TYPE:

2. REASON: (cont) 4.

SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)

Entry Sheets for

2. REASON Licensee Event Report A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161)

B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5.

COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &

4-Other (Explain) as above.

License Examination

i AVERAGE DAILY UNIT POWER LEVEL FDR MARCH 1986 Docket No.:

50-309 Unit:

Maine Yankee Date:

05/May/86 Completed By:

Steven L Jacobs Telephone:

207-882-6321 Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)

(MWe-Net) 1 O

16 857 2

O 17 854 3

O 18 854 4

O 19 854 5

O 20 856 6

O 21 853 7

O 22 855 8

O 23 856 9

O 24 856 10 O

25 854 11 3

26 855 12 217 27 855 13 393 28 855 14 848 29 856 15 854 30 855 31 855 i

.C

J i

Docket No.:

50-309 i

Unit Name:

Maine Yankee Date:

01/Apr/86 Completed By:

J.

M.

Taylor 3

Telephone:

207-882-6321 l

Report Month:

March, 1986 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES a

1 At the beginning of the month, the plant was.in hot shutdown while a generator hydrogen leak was being repaired.

On March lith, the reactor was made critical, the unit was phased to the grid, and loading commenced.

On March 12th, 30% power was maintained for a baron soak.

On March 13th, loading commenced.

On March 14th, 98.8% power was reached and maintained while the feed flow i

calorimetric was evaluated.

A limit of 882 MWe was maintained pending generator capability evaluation.

On March 17th, 98.8% power (882 MWe) was maintained while the generator hydrogen gland seal ring rub test and vibrations in the exciter and

]

generator were evaluated.

For the remainder of the month, a limit of 882 MWe was maintained due to generator vibration concerns.