OPERATING DATA REPORT Docket No.:
50-309 Date:
05/May/86 Completed By:
Steven L Jacobs Telephone:
207-882-6321 1.
Unit Name.......................................
Maine Yankee
- 2. Reporting Period................................
March 1986
- 3. Licensed Thermal Power (MWt)....................
2630
- 4. Nameplate Rating (Gross MWe)....................-
864 5.
Design Electrical Rating (Net MWe)..............
825 6.
Maximum Dependable Capacity (Gross MWe).........
850
- 7. Maximum Dependable Capacity (Net MWe)...........
810 8.
If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHANGES 9.
Power Level to Which Restricted, if Any (Net MWe)
NO RESTRICTIONS
- 10. Reasons for Restrictions, if Any:
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744.00 2.160.00
- 12. Number of Hours Reactor Was Critical...........
485.33 1.734.79 94.072.51
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00
- 14. Hours Generator On-line..
480.83 1.709.58 91.354.24
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH)........
1.173.279.00 4.211.231.00 206.211.912.00
- 17. Gross Electrical Energy Generated (MWH)........
396.680.00 1.416.700.00 67.656.420.00
- 18. Net Electrical Energy Generated (MWH)........
383.807.00 1.369.973.00 64.556.288.00
- 19. Unit Service Factor......
64.63 79.15 77.82
- 20. Unit Availabilty Factor..
64.63 79.15 78.61
- 21. Unit Capacity Factor (Using MDC Net)........
63.69 78.30 69.72
- 22. Unit Capacity Factor (Using DER Net)........
62.53 76.88 67.86
- 23. Unit Forced Outage Rate..
0.00 1.07 6.76
- 24. Shutdowns Scheduled Over Next 6 Months:
NONE
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
N/A h
O R
UNIT SHUTDOWNS AND POWER REDUCTIONS Docket No.:
50-309 FOR MARCH 1986 Unit:
Maine Yankee Date:
05/May/86 Completed By:
Steven L Jacobs Telephone:
207-882-6321 Page:
1 of 1 Number 8-86-9 Dnto 860221 Type (1)
S Durction (Hours) 263.2' R3aton (2)
B Method (3) 1 LER #
N/A System Cod 2 (4)
HA Component Coda (5)
GENERA-D Shutdown to repair hydrogen leakage from Main Generator.,
Cruze and Corrective This outage is Action carried over from last month.
9 1.
TYPE:
- 2. REASON: (cont) 4.
SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for
- 2. REASON Licensee Event Report A-Equipment Failure 3.
METHOD:
(LER) File (NUREG.0161)
B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5.
COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
License Examination
i AVERAGE DAILY UNIT POWER LEVEL FDR MARCH 1986 Docket No.:
50-309 Unit:
Maine Yankee Date:
05/May/86 Completed By:
Steven L Jacobs Telephone:
207-882-6321 Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)
(MWe-Net) 1 O
16 857 2
O 17 854 3
O 18 854 4
O 19 854 5
O 20 856 6
O 21 853 7
O 22 855 8
O 23 856 9
O 24 856 10 O
25 854 11 3
26 855 12 217 27 855 13 393 28 855 14 848 29 856 15 854 30 855 31 855 i
.C
J i
Docket No.:
50-309 i
Unit Name:
Maine Yankee Date:
01/Apr/86 Completed By:
J.
M.
Taylor 3
Telephone:
207-882-6321 l
Report Month:
March, 1986 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES a
1 At the beginning of the month, the plant was.in hot shutdown while a generator hydrogen leak was being repaired.
On March lith, the reactor was made critical, the unit was phased to the grid, and loading commenced.
On March 12th, 30% power was maintained for a baron soak.
On March 13th, loading commenced.
On March 14th, 98.8% power was reached and maintained while the feed flow i
calorimetric was evaluated.
A limit of 882 MWe was maintained pending generator capability evaluation.
On March 17th, 98.8% power (882 MWe) was maintained while the generator hydrogen gland seal ring rub test and vibrations in the exciter and
]
generator were evaluated.
For the remainder of the month, a limit of 882 MWe was maintained due to generator vibration concerns.