Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P875 + (19:54:03, 7 December 2024)
- ML20205P873 + (19:54:03, 7 December 2024)
- ML20205P872 + (19:54:04, 7 December 2024)
- ML20205P871 + (19:54:14, 7 December 2024)
- ML20205P870 + (19:54:14, 7 December 2024)
- ML20205P869 + (19:54:15, 7 December 2024)
- 05000498/LER-1988-056, :on 880930,determined That Two Primary Penetration Protection Circuit Breakers Not Included in Surveillance Test Program as Required by Tech Spec.Caused by Use of Licensing Basis Document + (19:54:17, 7 December 2024)
- 05000269/LER-1999-002-01, :on 990317,identified Problem Associated with Ability to Establish Flow Pressure LPI Discharge Headers within 15 Minutes.Caused by Inadequate Validation Process. Engineering Analysis Performed.With + (19:54:19, 7 December 2024)
- ML20205P865 + (19:54:20, 7 December 2024)
- ML20205P864 + (19:54:22, 7 December 2024)
- ML20205P863 + (19:54:23, 7 December 2024)
- RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC + (19:54:24, 7 December 2024)
- ML20205P861 + (19:54:25, 7 December 2024)
- ML20205P859 + (19:54:26, 7 December 2024)
- SVP-99-065, Requests That License SOP-31516,for Jf Graham,Be Terminated, Per 10CFR50.74(b).Individual Was Removed from License Duty on 990319 & No Longer Requires Operator License + (19:54:26, 7 December 2024)
- ML20205P858 + (19:54:27, 7 December 2024)
- 05000295/LER-1987-005-03, :on 870227,reactor Trip Signal on Steam Generator 1D lo-lo Level Generated.Caused by Inadvertent Opening of Loop D MSIV Bypass Valve in failed-closed Position.Valve Reclosed Manually + (19:54:29, 7 December 2024)
- ML20205P854 + (19:54:30, 7 December 2024)
- ML20205P853 + (19:54:30, 7 December 2024)
- ML20205P851 + (19:54:32, 7 December 2024)
- ML20205P850 + (19:54:33, 7 December 2024)
- ML20205P848 + (19:54:33, 7 December 2024)
- ML20205P846 + (19:54:34, 7 December 2024)
- ML20205P841 + (19:54:34, 7 December 2024)
- ML20205P839 + (19:54:35, 7 December 2024)
- ML20205P840 + (19:54:35, 7 December 2024)
- NOC-AE-00509, Ack Receipt of NRC Insp Repts 50-498/99-04 & 50-499/99-04. STP Would Like to Confirm Commitments Made in Exit Meeting on 990225 Re Maint Rule + (19:54:36, 7 December 2024)
- ML20205P837 + (19:54:36, 7 December 2024)
- IR 05000277/1988034 + (19:55:33, 7 December 2024)
- PY-CEI-NRR-2387, Documents Telcon Held Between NRC Staff & Members of Perry Nuclear Power Plant Staff on 990406,re Safety Evaluation for License Amend 105 + (19:55:34, 7 December 2024)
- A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station + (19:55:35, 7 December 2024)
- ML20205P834 + (19:55:35, 7 December 2024)
- ML20205P831 + (19:55:36, 7 December 2024)
- ML20205P830 + (19:55:37, 7 December 2024)
- ML20205P829 + (19:55:37, 7 December 2024)
- ML20205P828 + (19:55:38, 7 December 2024)
- ML20205P824 + (19:55:39, 7 December 2024)
- ML20205P827 + (19:55:39, 7 December 2024)
- ML20205P823 + (19:55:40, 7 December 2024)
- ML20205P821 + (19:55:42, 7 December 2024)
- ML20205P820 + (19:55:42, 7 December 2024)
- B12067, Proposed Tech Specs Allowing Implementation of Measures Approved by NRC as One Element of Response to Previously Addressed Small Break LOCA Issue + (19:55:43, 7 December 2024)
- ML20205P819 + (19:55:43, 7 December 2024)
- ML20205P815 + (19:55:44, 7 December 2024)
- LD-88-113, Remits Fee for 881010 Application,Extending License SNM-33 from Dec 1988 to Dec 1989 + (19:55:45, 7 December 2024)
- W3P88-1823, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-382/88-23.Corrective Actions:Notice QA-88-001 Generated & Procedure NOP-019 Developed & Currently in Approval Cycle + (19:55:46, 7 December 2024)
- ML20205P810 + (19:55:47, 7 December 2024)
- ML20205P811 + (19:55:47, 7 December 2024)
- ML20205P809 + (19:55:48, 7 December 2024)
- AECM-87-0052, Responds to Concerns Noted in Insp During Jul & Aug 1986 Re Qa.Corrective Actions:Goal to Reduce Backlog of Open Matl Nonconformance Repts Not Met for 1986.Good Progress Made in First Quarter 1987 + (19:55:49, 7 December 2024)
- ML20205P807 + (19:55:49, 7 December 2024)
- ML20205P804 + (19:55:51, 7 December 2024)