Forwards Safety Insp Repts 50-277/88-34 & 50-278/88-34 on 880903-1014.No Violations Noted
ML20205P830
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/01/1988
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20205P833 List:
References
NUDOCS 8811080323
Download: ML20205P830 (3)


See also: IR 05000277/1988034

Text

__ _

_ _ _ _ _ _ _

.__

. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ . _ _

.

1 NOV 1988

l

Docket Nos. 50-277/DPR-44

50-278/DPR-56

Philadelphia Electric Company

Correspondence Control Desk

P. O. Box 7520

Philadelphia, Pennsylvania 1910\\

Gentlemen:

Subject:

Combined Inspection 50-277/88-34; 50-278/88-34

This letter transmits the findings of the routine resident safety inspection

by Messet. L. E. Myers, R. J. Urban, 4

4, Williams and T. P. Johnson on

September 3 to October 14, 1988, at :,4 Peach Bottom Atomic Power Station,

Delta, Pennsylvania.

These fir #ngs were based on observation of activities,

interviews, meascrements and dowment reviews, and have been discussed with Mr.

J. F. Franz of your staf f.

Within the scope of this inspection, no violations were observed. However,

we are concerned with the implementation of your surveillance testing progrsm.

Specific concerns include the adequacy and useability of your surveillance test

procedures which implement the technical specification surveillance requirements.

These concerns are described in sections 7.1, 7.2, 6.2.7 and 11.2 of this

report and are also addressed in NRC Inspection 50-277/88-25; 50-278/88-25.

Please provide us with a response to these concerns about your surveillance

test procedures indicating your assessment of the extent of the problems and

your plans to correct them within 30 days of receipt of this letter.

The response requested by this letter is not subject to the clearance procedures

of the Off':e of Management and Budget as required by the Paperwork Reduction

Act of 1980, PL 96-511.

l

A copy of this letter and the enclosures are being placed in the NRC Public

Document Room,

Your cooperation with us is appreciated.

Sincerely,

CMGi n.a By

William F. Kane, Director,

Division of Reactor Projects

Enclosure:

I

'

NRC Region 1 Combined Inspection Report No. 50-277/88-34 and 50-278/88-34

i

?

.

OFFICIAL RECORD COPY

CIR PB 88-34/34 - 0001.0.0

10/26/88

f$kN$$$$ b!b

[

Q

.

__.

_ - _ _ _ _ - _ _ _ _ _ .

.-

'

,

, .

?

'p1

,

Philadelphia Electric Company

-:-

r

cc w/ enc 1:

.

John S. Kemper, Sr., Senior Vice President-Nuclear

Jack Urban, General Manager, Fuels Department, Delmarva Power

D. M. Smith, Vice President,. Peach Bottom Atomic Power Station-

J. W. Gallagher, Vice President, Nuclear Services

'

EJ C. Kistner, Chairman, Nuclear Review Board

W. 'H. Hirst, Director, Joint Generation Projects Department , Atlantic

'

,

Electric

'

B. W. Gorman, Manager-External Af fairs, Public Service Electric & Gas

Company-

m

J. F. Franz, Plant Manager, Peach Co+-

'tomic Power Station

.

Troy 8. Conner, Jr. , Esquire (Wl'

.srt)

Eugene J. Bradle/, Esquire, A: sis.

seral Counsel (Without Report)

,

Raymond L. Hovis, Esquire (Without h a rt)

"

Thomas Hagette,' Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

Public Document Room (POR)

Local Pub 11c Document Room (L20R)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

o

' Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o enc 1)

J. C. Linville Section Chief, DRP

PA0 (2) SALP Reports Only + All Inspection Reports

!

. Robert J. Bores, OP.SS

,

M. Shanbaky, Chief, FRPS, DRSS

SRI, Limerick I

Karl Abraham, Public Affairs Officer (2)

R. E. Martin. Project Engineer, NRR

J. Johnson. JP

!

,

    • RI:0RP
    • RI:0RP
    • RI:DRP
  • RI:DRP
  • RI:0R'
    • RI:0RP

-

Myers

Urban

Johnson

Williams

Linville

Wenzinger

'

10/ /88

10/ /88

10/ /88

10/ /88

10/ /88

10/ /88

l

Y

    • SEL PREVIOUS CONCURRENCES

-

!

0FTICIAL RECOP.3 COPY

CIR PB 88-34/34 - 0002.0.0

11/29/80

9

l

1

--

. . _ . . - _ _ . _ . - _ , . - . _ - - _ - _ .

-

l

' ' .

.

.

O'

[

Philadelphia Electric Company

-2-

i g g jggg

cc w/ enc 1:

C/

John S. Kemper, Sr., Senior Vice President-Nuclear

-

Jack Urban,-Genera! Manager, Fuels Department, Delmarva Power

',

'D

M. Smith, Vice President, Peach Bettom Atomic Power Station

4

J. W. Gallagher, Vice President, Nuclear Services

E. C.. Kistner, Chairman, Nuclear Review Board

.

W. H. Hirst, Director, hint Generation Projects Department, Atlantic

Electric

B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas

Company

J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

> -

Dane Honan

Public Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o enc 1)

!

J. C. Linvfile Section Chief, DRP

PA0 (2) SALP Reports Only + All Inspection Reports

Robert J. Bores, DRSS

M. Shanbaky, Chief, FRPS, DRSS

SRI, Limerick I

Karl Abraham, Public Affairs Officer (2)

R. E. Martin, Project Engineer, NRR

7, 7&c%

b e.P

i

yI:DRP

-

u

Ig: n6\\W//.

.r

R ,t

L

P

DRP

BRI:0RP

RP

I:DRP

R-

i

'

'

rHyers

prban

y chnson

Williams

,inville

enzinger

j

10/F/88

10///88' 10//f/88

10//f/88

10/8/88

10/7J/88

10/// /88

i

0FFICIAL RECORD COPY

CIR PB 88-34/34 - 0002.0.0

10/21/88

,

F

-

. _ .