| Site: | Peach Bottom |
| Issue date: | 11/01/1988 |
| From: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20205P833 | List: |
| References | |
| NUDOCS 8811080323 | |
| Download: ML20205P830 (3) | |
See also: IR 05000277/1988034
Text
__ _
_ _ _ _ _ _ _
.__
. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ . _ _
.
1 NOV 1988
l
Docket Nos. 50-277/DPR-44
50-278/DPR-56
Philadelphia Electric Company
Correspondence Control Desk
P. O. Box 7520
Philadelphia, Pennsylvania 1910\\
Gentlemen:
Subject:
Combined Inspection 50-277/88-34; 50-278/88-34
This letter transmits the findings of the routine resident safety inspection
by Messet. L. E. Myers, R. J. Urban, 4
4, Williams and T. P. Johnson on
September 3 to October 14, 1988, at :,4 Peach Bottom Atomic Power Station,
Delta, Pennsylvania.
These fir #ngs were based on observation of activities,
interviews, meascrements and dowment reviews, and have been discussed with Mr.
J. F. Franz of your staf f.
Within the scope of this inspection, no violations were observed. However,
we are concerned with the implementation of your surveillance testing progrsm.
Specific concerns include the adequacy and useability of your surveillance test
procedures which implement the technical specification surveillance requirements.
These concerns are described in sections 7.1, 7.2, 6.2.7 and 11.2 of this
report and are also addressed in NRC Inspection 50-277/88-25; 50-278/88-25.
Please provide us with a response to these concerns about your surveillance
test procedures indicating your assessment of the extent of the problems and
your plans to correct them within 30 days of receipt of this letter.
The response requested by this letter is not subject to the clearance procedures
of the Off':e of Management and Budget as required by the Paperwork Reduction
Act of 1980, PL 96-511.
l
A copy of this letter and the enclosures are being placed in the NRC Public
Document Room,
Your cooperation with us is appreciated.
Sincerely,
CMGi n.a By
William F. Kane, Director,
Division of Reactor Projects
Enclosure:
I
'
NRC Region 1 Combined Inspection Report No. 50-277/88-34 and 50-278/88-34
i
?
.
OFFICIAL RECORD COPY
CIR PB 88-34/34 - 0001.0.0
10/26/88
f$kN$$$$ b!b
[
Q
.
__.
_ - _ _ _ _ - _ _ _ _ _ .
.-
'
,
, .
?
'p1
,
Philadelphia Electric Company
-:-
r
cc w/ enc 1:
.
John S. Kemper, Sr., Senior Vice President-Nuclear
Jack Urban, General Manager, Fuels Department, Delmarva Power
D. M. Smith, Vice President,. Peach Bottom Atomic Power Station-
J. W. Gallagher, Vice President, Nuclear Services
'
EJ C. Kistner, Chairman, Nuclear Review Board
W. 'H. Hirst, Director, Joint Generation Projects Department , Atlantic
'
,
Electric
'
- B. W. Gorman, Manager-External Af fairs, Public Service Electric & Gas
Company-
m
J. F. Franz, Plant Manager, Peach Co+-
'tomic Power Station
.
Troy 8. Conner, Jr. , Esquire (Wl'
.srt)
Eugene J. Bradle/, Esquire, A: sis.
seral Counsel (Without Report)
,
Raymond L. Hovis, Esquire (Without h a rt)
"
Thomas Hagette,' Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Public Document Room (POR)
Local Pub 11c Document Room (L20R)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ enc 1:
o
' Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o enc 1)
J. C. Linville Section Chief, DRP
PA0 (2) SALP Reports Only + All Inspection Reports
!
,
M. Shanbaky, Chief, FRPS, DRSS
SRI, Limerick I
Karl Abraham, Public Affairs Officer (2)
R. E. Martin. Project Engineer, NRR
J. Johnson. JP
!
,
- RI:0RP
- RI:0RP
- RI:DRP
- RI:DRP
- RI:0R'
- RI:0RP
-
Myers
Urban
Johnson
Williams
Linville
Wenzinger
'
10/ /88
10/ /88
10/ /88
10/ /88
10/ /88
10/ /88
l
Y
- SEL PREVIOUS CONCURRENCES
-
!
0FTICIAL RECOP.3 COPY
CIR PB 88-34/34 - 0002.0.0
11/29/80
9
l
1
--
. . _ . . - _ _ . _ . - _ , . - . _ - - _ - _ .
-
l
' ' .
.
.
O'
[
Philadelphia Electric Company
-2-
i g g jggg
cc w/ enc 1:
C/
John S. Kemper, Sr., Senior Vice President-Nuclear
-
Jack Urban,-Genera! Manager, Fuels Department, Delmarva Power
',
'D
M. Smith, Vice President, Peach Bettom Atomic Power Station
4
J. W. Gallagher, Vice President, Nuclear Services
E. C.. Kistner, Chairman, Nuclear Review Board
.
W. H. Hirst, Director, hint Generation Projects Department, Atlantic
Electric
B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas
Company
J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr., Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
> -
Dane Honan
Public Document Room (POR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o enc 1)
!
J. C. Linvfile Section Chief, DRP
PA0 (2) SALP Reports Only + All Inspection Reports
Robert J. Bores, DRSS
M. Shanbaky, Chief, FRPS, DRSS
SRI, Limerick I
Karl Abraham, Public Affairs Officer (2)
R. E. Martin, Project Engineer, NRR
7, 7&c%
b e.P
i
yI:DRP
-
u
Ig: n6\\W//.
.r
R ,t
L
P
BRI:0RP
I:DRP
R-
i
'
'
rHyers
prban
y chnson
Williams
,inville
enzinger
j
10/F/88
10///88' 10//f/88
10//f/88
10/8/88
10/7J/88
10/// /88
i
0FFICIAL RECORD COPY
CIR PB 88-34/34 - 0002.0.0
10/21/88
,
F
-
. _ .