Proposed Tech Specs Figures 6.2.1-1,6.2.2-1 & Page 6-8, Revising Facility Organization
ML20205P831
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/24/1987
From:
DAIRYLAND POWER COOPERATIVE
To:
Shared Package
ML20205P825 List:
References
NUDOCS 8704030385
Download: ML20205P831 (3)


Text

..

DAIRYLAND POWER COOPERATIVE OFFSITE MANAGEMENT l BOARD OF. DIRECTORS l l GENERAL MANAGER l l SECRETARY & l l ADMINISTRATIVE l l ASSISTANT l I l I u . n l DIRECTOR l l ASSISTANT l l ASSISTANT l l ASSISTANT l l ASSISTANT l l EXTERNAL l l GENERAL MANAGER l l GENERAL MANAGER l l GENERAL MANAGER l l GENERAL MANAGER l l RELATIONS l l FOR OPERATIONS l l FOR ENGINEERING l l FOR l l & CONTROLLER l l AND l l ADMINISTRATIVE j l TECHNICAL SERVICES l FIGURE 6.2.1-1 0FFSITE ORGANIZATION 40 [ h S p -

P

1 I r' -l GENERAL MANAGER b - - - - - -l SAFETY REVIEW CO I I l ASSISTANT GENERAL l l l MANAGER FOR OPERATIONS l l

l l l TECHNICAL SUPPORTj - -l LACBWR l --

l OPERATIONS l

PLANT SUPERINTENDENT l- - ~ -

l ll CONTRACTORS l IREVIEW COMMITTEE l l i i i i l QUALITY ASSURANCE l l ADMINISTRATIVE l l HEALTH & SAFETY l l0NSITE-TECHNICAL l SUPERVISOR ASSISTANT l l SUP_ERVISOR l l SUPPORT l l

l l l l l ENGINEERS

  • l l l AND -l l HEALTH l l TECHNICAL l l TRAINING l l PHYSICS l l SUPPORT l l QA/QC l lTECHNICIANSj l STENOGRAPHERS l l SPECIALIST l l TECHNICIANS l l SECURITY & SAFETY l l SUPERVISOR l t

i i

jMECHANICAL j l INSTRUMENT & l l MAINTENANCE l l ASSISTANT MECHANICAL l l0PERATIONS SUPERVISOR l l ELECTRICAL SUPERVISOR l l SUPERVISOR l l MAINTENANCE SUPERVISOR l l l l MECHANICAL l l ASSISTANT TO l l INSTRUMENT AND l lMAINTENANCEj i  ! OPERATIONS SUPERVISOR l l ELECTRICAL TECHNICIANS l l SHIFT l l AND TRAINING l l SUPERVISORS l l PLANT OPERATORS l l RELIEF SUPERVISOR l l FIRE PROTECTION l Note

  • Mechanical Engineer is Designated Engineer Responsible for Fire DAIRYLAND POWER COOPERATIVE Protection Program A LACBWR FACILITY ORGANIZATION Technical Support Engineer is designated Emergency FIGURE 6.2.2-1 Planning Coordinator

ADMINISTRATIVE CONTROLS COMPOSITION 6.5.2.2 The SRC shall be composed of the:

Chairman: Consultant-Members: Consultant-Plant Superintendent Director External Relations General Manager- }

ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the SRC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SRC activities-at any one time.

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRC Chairman to provide expert' advice to the SRC.

MEETING FREQUENCY 6.5.2.5 The SRC shall meet at least once per six months.

QUORUM 6.5.2.6 The minimum quoru. of the SRC necessary for the performance of the'SRC review and audit functions iif these Technical Specifications'shall consist of the Chairman, or his designated .t1 ternate, and at least 3 SRC members, including alternates. No more than a minority of the quorma shall have line responsibility for operation ot' the unit.

REVIEW 6.5.2.7 The Safety Review Committee shall review:

a. The safety evaluations for 1) changes to procedures, equipment or systems and.2) tests or experiments completed under the provisions of.

Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.

b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.

LACBWR 6-8 PCI-19 i