Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000298/LER-1986-011, :on 860510,closure of Stop Valve 2 Did Not Result in Turbine Stop Valve Closure Half Scram During Sp 6.1.7.Caused by Disconnected Linkage Between Valve Actuator & Reactor Protection Sys Limit Switches + (07:49:31, 7 December 2024)
- ML20205T010 + (07:49:32, 7 December 2024)
- ML20205T008 + (07:49:33, 7 December 2024)
- ML20205T009 + (07:49:33, 7 December 2024)
- ML20205T002 + (07:49:34, 7 December 2024)
- ML20205T001 + (07:49:35, 7 December 2024)
- ML20205T000 + (07:49:36, 7 December 2024)
- ML20205S997 + (07:49:36, 7 December 2024)
- ML20205S996 + (07:49:38, 7 December 2024)
- ML20205S995 + (07:49:39, 7 December 2024)
- ML20205S993 + (07:49:39, 7 December 2024)
- ML20205S992 + (07:49:40, 7 December 2024)
- 05000370/LER-1999-002-02, :on 990318,noted Failure to Comply with TS 3.4.12 Requirements Re Two Centifugal Charging Pumps.Caused by Use of Wrong Procedure.Licensee Will Review & Revise Procedures & Operator Training Program as Needed + (07:49:42, 7 December 2024)
- ML20205S989 + (07:49:43, 7 December 2024)
- ML20205S990 + (07:49:43, 7 December 2024)
- IR 05000317/1988022 + (07:49:51, 7 December 2024)
- ML20205S986 + (07:49:51, 7 December 2024)
- ML20205S984 + (07:49:53, 7 December 2024)
- ML20205S985 + (07:49:53, 7 December 2024)
- ML20205S981 + (07:49:54, 7 December 2024)
- 05000370/LER-1999-002, Forwards LER 99-002-00 Re Failure to Comply with Required Actions of TS 3.4.12, LTOP Sys, with Two Centrifugal Charging Pumps Capable of Injecting Into Rcs.Event Is Considered Nonsignificant to Health & Safety of Public + (07:49:55, 7 December 2024)
- ML20205S978 + (07:49:55, 7 December 2024)
- ML20205S977 + (07:49:56, 7 December 2024)
- VPN-031-99, Forwards Trojan Nuclear Plant,Radiological Environ Monitoring Rept for CY98. Rept Submitted in Accordance with Trojan Permanently Defueled TS 5.8.1.2 & Sections IV.B.2, IV.B.3 & Iv.C of App I to Title 10CFR50 + (07:49:57, 7 December 2024)
- ML20205S975 + (07:49:59, 7 December 2024)
- ML20205S974 + (07:50:00, 7 December 2024)
- ML20205S970 + (07:50:01, 7 December 2024)
- ML20205S973 + (07:50:01, 7 December 2024)
- ML20205S966 + (07:50:02, 7 December 2024)
- ML20205S965 + (07:50:03, 7 December 2024)
- ML20205S963 + (07:50:04, 7 December 2024)
- ML20205S964 + (07:50:04, 7 December 2024)
- ML20205S962 + (07:50:05, 7 December 2024)
- ML20205S961 + (07:50:05, 7 December 2024)
- ML20205S959 + (07:50:06, 7 December 2024)
- ML20205S957 + (07:50:07, 7 December 2024)
- ML20205S955 + (07:50:08, 7 December 2024)
- ML20205S956 + (07:50:08, 7 December 2024)
- ML20205S950 + (07:50:09, 7 December 2024)
- ML20205S949 + (07:50:11, 7 December 2024)
- ML20205S947 + (07:50:11, 7 December 2024)
- ML20205S943 + (07:50:12, 7 December 2024)
- ML20205S939 + (07:50:13, 7 December 2024)
- 05000354/LER-1986-013, :on 860506,during Surveillance Test of Main Steam Line D flow-high Isolation Actuation Trip Circuitry, Technician Inadvertently Interrupted Electrical Power Continuity.Caused by Procedural Error + (07:50:15, 7 December 2024)
- ML20205S937 + (07:50:16, 7 December 2024)
- ML20205S934 + (07:50:17, 7 December 2024)
- ML20205S933 + (07:50:18, 7 December 2024)
- ML20205S932 + (07:50:20, 7 December 2024)
- ML20205S931 + (07:50:21, 7 December 2024)
- ML20205S928 + (07:50:22, 7 December 2024)
- ML20205S927 + (07:50:23, 7 December 2024)
- ML20205S925 + (07:50:24, 7 December 2024)