MONTHYEARML20087N9321984-03-30030 March 1984 Forwards Proposed Schedule of Written Responses to Outstanding Issues Presented in Table 1.2 of Draft Ser,Per NRC .Requests NRC Schedule for Issuing Remaining Draft SER Sections in Support of Meetings by 840430 ML20097A0531984-09-0707 September 1984 Forwards Responses to Issues Provided in 840608 Draft Ser. FSAR Changes Described in Responses Will Be Incorporated Upon Acceptance.W/O Encl Project stage: Draft Other ML20134E2721985-08-0707 August 1985 Forwards Status Summaries of Open Issues,Confirmatory Issues & Commitment Issues for Final Draft Ser.Schedule for Issuance of SER Requested Project stage: Draft Other ML20206J1841986-06-23023 June 1986 Informs That Installation of Shunt Trip Attachment on Breakers in Reactor Trip Switchgear Completed,Per SER Confirmatory Item 26 Project stage: Other ML20207R0681987-03-0505 March 1987 Forwards Request for Addl Info Re Util 831104,21,840510, 850318 & 0422 Responses to Generic Ltr 83-28,Item 2.2.1. Response Requested within 45 Days of Ltr Receipt Project stage: RAI ML20209J1901987-04-24024 April 1987 Advises That Installation of Shunt Trip Coil Trip Attachment Complete,Closing Out SER Confirmatory Item 26 Project stage: Other ML20213F2351987-05-0707 May 1987 Forwards Response to 860627 Request for Addl Info Re Generic Ltr 83-28,Items 2.2.1,2.2.2,4.3,4.5.2 & 4.5.3.W/3 Oversize Drawings Project stage: Request ML20235L9061987-06-30030 June 1987 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Beaver Valley Units 1 & 2, Final Informal Rept Project stage: Other ML20205S9951988-08-10010 August 1988 Forwards SER Accepting Licensee 831104 & 840330 & 870504 Responses to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification for All Other safety-related Components Project stage: Approval ML20206G0301988-11-17017 November 1988 Forwards Safety Evaluation Supporting Util 870424 Response to Generic Ltr 83-28,Item 4.3 Re Shunt Trip Design Project stage: Approval 1987-03-05
[Table View] |
Text
.
August 10, 1987 Docket Nos. 50-334 r]
and 50-412 Mr. J. J. Carey, Senior Vice President Duquesne Light Company Nuclear Group Post Office Box 4 Shippingport, PA 15077
Dear Mr. Sieber:
SUBJECT:
BEAVER VALLEY UNITS 1 AND 2 - GENERIC LETTER 83-28. ITEM 2.2.1 EQUIPMENT CLASSIFICATION FOR ALL OTHER SAFETY-RELATED COMPONENTS (TAC #S 53652 AND 62952) -
By letters dated November 4,1983 and May 4,1987, you responded to the subject ' tem for Unit 1; by letter dated March 30, 1984, you addressed the same item for Unit 2.
Our review of your responses is complete and is documented in the enclosed safety evaluation. We found your resolution of this issue acceptable for both units.
It i our understandirig, through your letter of July 29, 1986, that the requirements of the subject item have been implemented at Unit l'since March 1985. Through verbal comunication with Mr. Gary Beatty of your staff, we understand that the item has also been implemented at Unit 2.
On this basis, there is no need for us to track any future implementation.
This completes cur efforts on item 2.2.1 fur both units.
Sincerely, Peter S. Tam, Project Manager Project Directorate 1-4 Division of Reactor Projects I/II
Enclosure:
As stated cc w/ enclosure:
See next page Distribution: Docket File NRC & L PORs Branch Files Tam SNntr4 Edordan JPartlow JMauck 0 Lasher arge BBoger ACRS (10)
OGC-Beth j
S
(
Jt z 8llO/87
/f. ! 7
/jp/87 i
\\
8811140065 G80G10
/
1 ADOCK 0300{ 4 DR
,