Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-III-87-006, on 870109,unit Achieved Initial Criticality. Actual Point of Criticality Consistent W/Point Predicted. Licensee Schedule Calls for Completion of Low Power Testing on 870121 + (01:06:05, 7 December 2024)
- ML20207P249 + (01:06:06, 7 December 2024)
- ML20207P250 + (01:06:06, 7 December 2024)
- ML20207P247 + (01:06:07, 7 December 2024)
- ML20207P244 + (01:06:08, 7 December 2024)
- ML20207P246 + (01:06:08, 7 December 2024)
- PNO-IV-87-002, on 870110,spill of Approx 1/2 Lb UF6 Occurred During Evacuation of Fill Line to Cold Trap.Caused by too- Quick Opening of Downstream valve.UF6 Cylinders Will Not Be Filled Until Necessary Revs & Repairs Made + (01:06:09, 7 December 2024)
- IR 05000348/1986027 + (01:06:11, 7 December 2024)
- 05000344/LER-1986-012, :on 861105 & 1211,both Trains of Control Room Emergency Ventilation Sys (CB-1) Declared Inoperable.Caused by Failed & Open Fire Dampers.Dampers Repaired & Closed. Procedures for Damper Insps Will Be Revised + (01:06:14, 7 December 2024)
- ML20207P236 + (01:06:15, 7 December 2024)
- ML20207P234 + (01:06:16, 7 December 2024)
- ML20207P230 + (01:06:22, 7 December 2024)
- 05000237/LER-1986-030-04, :on 861214,MSIV 2-203-2B Leaked in Excess of Tech Spec 3.7.A.2.b Limit.Caused by Packing Leak on 2-203-2B Valve.Valve Repacked & Local Leak Test Successfully Performed + (01:06:24, 7 December 2024)
- U-600805, Clarifies Listed Util 851018 Statement Re Request for Exemption from N-5 Certification of one-half Inch & Smaller ASME III Instrument Tubing Lines.Statement 2 Does Not Apply to Present Mods or Repairs of Instrument Lines + (01:06:25, 7 December 2024)
- ML20207P225 + (01:06:25, 7 December 2024)
- ML20207P222 + (01:06:26, 7 December 2024)
- ML20207P221 + (01:06:27, 7 December 2024)
- ML20207P220 + (01:06:27, 7 December 2024)
- ML20207P219 + (01:06:28, 7 December 2024)
- ML20207P216 + (01:06:29, 7 December 2024)
- ML20207P217 + (01:06:29, 7 December 2024)
- IR 05000282/1986011 + (01:06:33, 7 December 2024)
- ML20207P214 + (01:06:33, 7 December 2024)
- PLA-2776, Forwards 10CFR50.59 Rept Summarizing 1985 Approved Safety Evaluations for Determining Unreviewed Safety Question + (01:06:35, 7 December 2024)
- U-600815, Informs That Util Will Not Participate in EPRI in 1987.Util Nonparticipation Will Not Adversely Affect Special Cable Study Being Conducted by Univ of Connecticut Under EPRI Auspices + (01:06:35, 7 December 2024)
- ML20207P211 + (01:06:36, 7 December 2024)
- ML20207P209 + (01:06:37, 7 December 2024)
- ML20207P207 + (01:06:42, 7 December 2024)
- ML20207P204 + (01:06:43, 7 December 2024)
- ML20207P205 + (01:06:43, 7 December 2024)
- ML20207P203 + (01:06:45, 7 December 2024)
- ML20207P202 + (01:06:46, 7 December 2024)
- ML20207P200 + (01:06:46, 7 December 2024)
- U-600809, Notifies of Rev to Fsar.Leak Detection Sys Will Comply W/ Ansi/Isa Std S67.03-1982, Std for LWR RCPB Leak Detection, in Place of Technically out-of-date Reg Guide 1.45, RCPB Leakage Detection Sys + (01:06:47, 7 December 2024)
- ML20207P196 + (01:06:48, 7 December 2024)
- W3P87-0119, Submits New Address for Receipt of Invoices Re Facility + (01:06:48, 7 December 2024)
- BECO-87-003, Forwards Pilgrim Nuclear Power Station Recirculation Inlet Thermal Sleeve Mock-Up Fabrication and Evaluation, Per 830826 Order Re IGSCC Insp.Hydrogen Water Chemistry Chosen as Method of Mitigating Propagation of IGSCC + (01:06:49, 7 December 2024)
- ML20207P193 + (01:06:49, 7 December 2024)
- ML20207P190 + (01:06:50, 7 December 2024)
- ML20207P188 + (01:06:51, 7 December 2024)
- ML20207P187 + (01:06:51, 7 December 2024)
- ML20207P185 + (01:06:53, 7 December 2024)
- ML20207P183 + (01:06:53, 7 December 2024)
- ML20207P180 + (01:06:54, 7 December 2024)
- ML20207P182 + (01:06:54, 7 December 2024)
- ST-HL-AE-1874, Forwards Response to NRC 861219 Questions Re Fire Protection Sys.Repair Procedure No Longer Required to Enable Addl Charging Inventory in Event of Spurious Opening of Refueling Water Storage Tank Isolation Valves for Control Room Fire + (01:06:55, 7 December 2024)
- ML20207P178 + (01:06:56, 7 December 2024)
- ML20207P176 + (01:06:57, 7 December 2024)
- ML20207P175 + (01:07:01, 7 December 2024)
- PY-CEI-NRR-0576, Monthly Operating Rept for Dec 1986 + (01:07:01, 7 December 2024)
- ML20207P170 + (01:07:02, 7 December 2024)