ML20207P236
| ML20207P236 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/07/1987 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20207P237 | List: |
| References | |
| NUDOCS 8701150274 | |
| Download: ML20207P236 (2) | |
See also: IR 05000348/1986027
Text
_ - _ _ _ _
- _
f
A
l<2NI
'
,
JAN 0 71987
.
Docket Nos. 50-348, 50-364
abama Power Company
'
TTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
(
Birmingham, AL 35291
L
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-348/86-27 AND 50-364/86-27
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. H. Bradford on November 11 - December 10, 1986.
The inspection included a
review of activities authorized for your Farley facility. At the conclusion of
f
the inspection, the findings were discussed with those members of your staff
L
-
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any quest'ons concerning this letter, please contact us.
Sincerely,
ORIGINAt SIGNED BY
D M. W.E
m
8701150274 870107
ADOCK 05000348
Q
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ enc 1:
(See page 2)
L.Eo /
,
' '
'
O l l%l.
ll
,
f
.
Alabama Power Company
2
cc w/ enc 1:
R 0. Whitt, Executive Vice President
LJ' D. Woodard, General Manager -
Nuclear Plant
W G. Hairston, III, General Manager -
Nuclear Support
( W. McGowan, Manager-Safety Audit
and Engineering Review
p K. Osterholtz, Supervisor-Safety
Audit and Engineering Review
bec w/ enc 1:
lHtC Resident Inspector
E( Reeves, Project Manager, NRR
Document Control Desk
State of Alamaba
,
,
R
1(A
I .v
p
denos:cdg
ance
-
.
.
.
.
-
-
-
--
- -
.