ML20207P225
| ML20207P225 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 01/08/1987 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20207P226 | List: |
| References | |
| NUDOCS 8701150265 | |
| Download: ML20207P225 (2) | |
See also: IR 05000254/1986019
Text
'.
4
P
,
t
aa ns%
UNITED STATES
- ,
NUCLEAR REGULATORY COMMisslON
,
g
S
REGION lli
5
f
799 ROOSEVELT ROAD
GLEN ELLYN ILLINOl$ 60137
0,
%,*****/'
3 03137
Docket No. 50-254
Docket No. 50-265
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
This refers to the special safety inspection conducted by Messrs. S. Hare,
D. Damon, and F. Clark of this office on November 10-21, 1986, of activities
at Quad Cities Nuclear Power Station, Units 1 and 2, authorized by NRC
Operating Licenses No. DPR-29 and No. DPR-30, and to the discussion of our
findings with N. Kalvianakis and R. Bax and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection. However, significant deficiencies were identified in your
Licensed Operator Requalification Training Program. These deficiencies, as
documented in this report require that significant upgrades be made to your
requalification program.
Subsequent to these program changes, the revised
Requalification Program Topical Report should be sent to the NRC for
approval.
In the interim period, the effectiveness of your short and long
term corrective action will be monitored by Region III Operator Licensing
personnel through their periodic administration of requalification
examinations.
In accordance with 10 CFR 2.790 of the Connission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
!
S0$$A$l@fgy
I
I
l
2r 6 /
9
- e
.
Commonwealth Edison Company
2
M08W
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
b)
'CU
-
Carl J Paperfello, Director
Divisi n of Abactor Safety
Enclosure:
Inspection Report
No. 50-254/86019(DRS); and
No. 50-265/86020(DRS)
"
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
R. L. Bax, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
_
.
General's Office, Environmental
Control Division
4
3
85r+
F
s
,.
P
allo
@ HehhPapder,n
fbick
Hare lms
Da o
Clar
B
a
. -
.
. . .
-
--