Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207Q913 + (00:48:38, 7 December 2024)
- ML20207Q911 + (00:48:39, 7 December 2024)
- ML20207Q908 + (00:48:39, 7 December 2024)
- A06384, Informs That Reactor Trip Sys Included in Westinghouse/Util Vendor Interface Program,Per NRC 870224 Request & Generic Ltr 86-38,Item 2.1.2 + (00:48:40, 7 December 2024)
- ML20207Q905 + (00:48:47, 7 December 2024)
- IR 05000344/1987002 + (00:48:48, 7 December 2024)
- ML20207Q904 + (00:48:48, 7 December 2024)
- ML20207Q887 + (00:48:49, 7 December 2024)
- 05000456/LER-1987-009, :on 870207,reactor Tripped When Control Power Fuses on Source Range N32 Pulled During Troubleshooting. Caused by Personnel Error.Operator Aid Sheet Re Trip Signals Generated by Pulling Fuses Will Be Created + (00:48:56, 7 December 2024)
- TXX-6317, Interim Deficiency Rept CP-85-19 Re Use of Nonrepresentative Sample in Determining Generic Values for Typical Conduit Span Calculations.Initially Reported on 861021.Engineering Evaluations Continuing.Next Rept Expected by 870430 + (00:48:56, 7 December 2024)
- ML20207Q880 + (00:48:57, 7 December 2024)
- 05000528/LER-1987-001, :on 870203,control Room Essential Filtration Actuation Signal Actuated on Channels a & B.Caused by Voltage Spike.Setpoints Readjusted to Be Consistent W/Tech Specs + (00:49:04, 7 December 2024)
- ML20207Q874 + (00:49:05, 7 December 2024)
- 05000413/LER-1987-004, :on 870124,10 Containment Air Release & Addition Sys Gaseous Waste Release Packages Improperly Prepared.Caused by Personnel Error.Health Physics Technician Retrained & Requalified on Procedures + (00:49:11, 7 December 2024)
- 05000304/LER-1987-001-08, :on 870203,while Operating at Full power,1-inch Hydraulic Seal on Trip Solenoid for Loop D MSIV Failed. Caused by Defective O-ring or Damage During Installation. Similar Seals Checked for Leakage + (00:49:18, 7 December 2024)
- 05000440/LER-1987-006, :on 870208,unexpected RCIC Sys Isolation Occurred Due to Indicated Min Differential Pressure from Leak Detection Sys.Caused by Steam Condensing in High Side Process Connection for Instrument Impulse Line + (00:49:25, 7 December 2024)
- 05000440/LER-1987-005, :on 870207,unexpected Reactor Protection Sys Actuation Occurred During Performance of APRM Surveillance Test Instruction (Svi).Caused by Deficient Svi.Svi Revised to Delete Step 5.1.61 + (00:49:32, 7 December 2024)
- ML20207Q854 + (00:49:33, 7 December 2024)
- ML20207Q856 + (00:49:33, 7 December 2024)
- ML20207Q851 + (00:49:34, 7 December 2024)
- 3F0387-01, Forwards Itemization of Various Insurance Policies Currently in Place for Facility,Per 10CFR50.54(w) + (00:49:35, 7 December 2024)
- PY-CEI-NRR-0604, Forwards LERs 87-005-00 & 87-006-00 + (00:49:35, 7 December 2024)
- ML20207Q845 + (00:49:36, 7 December 2024)
- IR 05000305/1987008 + (00:49:37, 7 December 2024)
- TXX-6324, Forwards Notice of 870312-14 Meetings Between Util,Case & S&W in Dallas,Tx to Discuss Large Bore Pipe Supports + (00:49:37, 7 December 2024)
- IR 05000155/1987006 + (00:49:38, 7 December 2024)
- ML20207Q832 + (00:49:39, 7 December 2024)
- ML20207Q828 + (00:49:39, 7 December 2024)
- ML20207Q827 + (00:49:40, 7 December 2024)
- ML20207Q823 + (00:49:40, 7 December 2024)
- ML20207Q822 + (00:49:41, 7 December 2024)
- ML20207Q821 + (00:49:42, 7 December 2024)
- 05000327/LER-1987-009, :on 870130,discovered That Method to Determine Ice Condenser Ice Bed Ph Not in Compliance W/Tech Spec Surveillance Requirements.Caused by Personnel Error. Technical Instructions Revised + (00:49:48, 7 December 2024)
- ML20207Q819 + (00:49:49, 7 December 2024)
- ML20207Q816 + (00:49:50, 7 December 2024)
- ML20207Q814 + (00:49:51, 7 December 2024)
- ML20207Q815 + (00:49:51, 7 December 2024)
- IR 05000344/1987004 + (00:49:52, 7 December 2024)
- PNO-III-87-032, on 870302,slow,steady Increase in Primary to Secondary Steam Generator Tube Leakage Monitored.On 870303, Leak Estimated at 0.2 Gpm & Unit Taken Out of Svc.Tube Will Be Repaired & Surveillance & Maint Program Implemented + (00:49:52, 7 December 2024)
- LD-87-012, Forwards Generic Design Info in Response to 10CFR50.62, Requirements for Reduction of Risk from ATWS Events for Light Water-Cooled Nuclear Power Plants. Requirements Will Be Met When Existing Supplementary Protection Sys Modified + (00:49:53, 7 December 2024)
- IR 05000362/1987003 + (00:49:54, 7 December 2024)
- PNO-III-87-031, on 870217,loosened Bolt Discovered on Diesel Generator Cooling Pump Flange.Caused by Deliberate Loosening of Bolts.Licensee Increased Security Coverage Pending Completion of Investigation + (00:49:54, 7 December 2024)
- PNO-III-87-030, on 870224,records Indicated Licensee Implanted Seven Pacemakers Between 1974 & 1977,contrary to 860116 Request to Terminate License.Four Pacemakers Removed & Returned to Vendor + (00:49:55, 7 December 2024)
- IR 05000454/1987008 + (00:49:56, 7 December 2024)
- ML20207Q800 + (00:49:56, 7 December 2024)
- ML20207Q794 + (00:49:57, 7 December 2024)
- ML20207Q793 + (00:49:58, 7 December 2024)
- ML20207Q792 + (00:49:58, 7 December 2024)
- ML20207Q785 + (00:50:05, 7 December 2024)
- ML20207Q777 + (00:50:11, 7 December 2024)
- ML20207Q782 + (00:50:11, 7 December 2024)
- ML20207Q774 + (00:50:17, 7 December 2024)