Forwards Safeguards Insp Repts 50-454/87-08 & 50-455/87-08 on 870209-13 & 17.Violations Noted.Notice of Violation & Rept Details Withheld (Ref 10CFR73.21)
ML20207Q800
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/26/1987
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20207Q801 List:
References
NUDOCS 8703100001
Download: ML20207Q800 (2)


See also: IR 05000454/1987008

Text

<- - .

-

OA of i n 7 W rn e r n c 2 n -- n e

M <-uun LJG liNFUE Vin j , Vi;

FEB 2 61987

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safeguards inspection conducted by

Messrs. J. L. Belanger and J. R. Kniceley of this office on February 9-13

and 17, 1987, of activities at Byron Nuclear Power Station, Units 1 and 2,

authorized by NRC Operating Licenses No. NPF-37 and No. NPF-66 and to the

discussion of our findings with Mr. R. Querto and other members of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice. The inspection

showed that action had been taken to correct the identified violation and

to prevent recurrence. Our understanding of your corrective actions are

described in Paragraph 7 of the enclosed inspection report. Consequently, no

reply to the violation is required and we have no further questions

regarding this matter at this time.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, the enclosure

to this letter and our report of this inspection will not be placed in the NRC

Public Document Room.

8

\

li

\

\

!

W h fN /II I' * F Enclosure contains

SAFE 90ARDS INFMMATI0t{

p W on separation this

0703100001 070226 P80e is Decentrolled

PDR ADOCK 05000454 p"

t. G PDR g

,. ,

n a r- -m A 3 W (TA3"^

a,VT'YN'MN

DM[EULnTJG

Commonwealth Edison Company 2

FEB 2 61987

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C

W. L. A 1 son, Chief

Nuclear Materials Safety

and Safeguards Branch

Enclosures:

1. Notice of Violation

2. Inspection Reports

No. 50-454/87008(DRSS);

No. 50-455/87008(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc enclosures:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/PWR-8/SSPB

ACRS

cc w/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, OGC

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

RIII RIII RIII RIII

(L W cJ,b RIII{f

ts RYldftf 4 fly Enclosure cetttefns

Be nger/nma KrRceley reed Forney AM son " SAFEGUARDS INFMyIg

e n r- n -m

UM 'MI

'n s

M 1 )d

1 V A. O_y

Pta this

,, ,. .

047e is 0*centrof fed