'Af 2NRC-7-037 Beaver Valley No. 2 Unit Project Organization S.E.G. Building Telecopy 4 ) 64 5 Ext.160 P.O. Box 328 March 4, 1987 Shippinoport, PA 15077 United States Nuclear Regulatory Commission ATTENTION:
Document Control Desk Washington, DC 20555
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Certification of Distribution - FSAR Amendment 15 Gentlemen:
Attached is an affidavit certifying that distribution of Amendment 15 of the Final Safety Analysis Report has been made in accordance with 10CFR2.101 and Enclosure 1 to this letter.
DUQUESNE LIGHT COMPANY l
By Sr.VicePresi(dent J/ d/ Carey / )
RWR/ijr NR/FSAR/AM/15 Attachments AR/NAR cc: Mr. P. Tam, Project Manager
- w/ attachments Mr. J. Beall, NRC Sr. Resident inspector
- w/ attachments Ms. A. Asars, NRC Resident inspector
- w/ attachments Dr. T. E. Murley, NRC Region 1 Administrator
- w/ attachments INP0 Records Center
- w/ attachments B7031oojgo i
g D
4j ADOCKojjj PDR
United States' Nuclear R:gulatory Commission Mr. Harold R. Denton, Director Certification of Distribution - FSAR Amendment 15
_Page'2 COMMONWEALTH OF_ PENNSYLVANIA )
)
SS:
COUNTY OF BEAVER
)
On this I 8s day of (( b
/9((, befor e me, a Notary Public in and for said Commonwealth and County, personally appeared -
J. J. Carey, who being duly sworn, deposed and said that (1) he is Senior Vice President of Duquesne Light, (2) he is duly authorized to execute and file the-foregoing Submi ttal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.
hh 2
f Notary Public 3,.,, s, g, pagTy:,
+ :1s'MC Smtr =4 PORT 80W,48 Aus COUNTT gY COSMIS$10R HPlus DCT. 23,1980 Fcmber.Preseyfv*ah AssachAd of M t
ENCLOSURE l-CERTIFICATION OF SERVICES FSAR - AMENDMENT 15 A copy of Anendment 15 to the Final Safety Analysis Report for Beaver Valley Power Station Unit No. 2 has been served on the following Federal, State, and Local ~ officials by deposit in the United States mail, addressed as follows:
FINAL. SAFETY ANALYSIS REPORT - AMENDMENT 15 DISTRIBUTION LIST' Mayor of the Borough of Robert M. Quillin, CHP, Director-Shippingport (1)-
Ohio Department of Health (1)
Municipal Building, Route 483 Radiological Health Unit Shippingport, PA 15077 1224 Kinneer Road Columbus, OH 43212 Regional Radiation Representatives (1)
Chief, Office.of Planning US Environmental Protection-Agency Coordination (1)
. Region 111 361 East Broad Street Curtis Building, 6th Floor PO Box 1735 6th and Walnut Streets'
_ Columbus, OH 43215 Philadelphia, PA 19106 Mr. R. Gruel (1)
Office of the Governor (1)
Pacific Northwest Laboratories State of West Virginia Battelle Boulevard Capitol Building Richland, WA 99352 Charleston, WVA 25305 (FSAR Amendments only)
Mr. J. Yusko State Department of Health (1)
Department of Environmental ATTN:
State Director of Health
~
Resource (1)