y

.$18 CONFIRMATORY ACTION LETTER

~~~~~~

CAL-RIII-87-001 FEB 271997 Docket No. 50-237 Docket No. 50-249 Comonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

This letter refers to telephone conversations between yourself and other members of ycur staff and Mr. N. J. Chrissotimos and other members of my staff on February 27, 1987, concerning the performance of the Dresden_ Station licensed operators on NRC Requalification Examinations administered during the week of January 26, 1987.

The results of these examinations indicate that 6 of the 12 (50%) of the operators examined failed.

In accordance with the guidance contained in NUREG 1021 regarding requalification program evaluations, it is our determination that the Dresden Station requalification program is unsatisfactory.

Based on these conversations it is our understanding that Comonwealth Edison will:

A.

While in the cold shutdown condition, the Dresden Units 2 and 3 control room will be staffed with a licensed SR0 as an advisor who has passed either the NRC administered requalification exam or has passed an NRC

-license examination since January 1,1986.

B.

When in other than the cold shutdown condition, the Dresden Units 2 and 3 control room will be staffed by a licensed SRO and as a minimum, a licensed R0 at the controls of each operating unit who meets the criteria identified in Item A above.

C.

Remove from licensed duties those R0's and SR0's who failed the NRC administered requalification exams until such time that these individuals successfully complete an NRC approved accelerated upgrade training program or an NRC adniinistered examination.

D.

Meet with the NRC at the Region III office on March 3,1987 to present your upgrade program plans and implenentation schedule.

$$h37 h

O PDR ZE2V

',3 s

Comonwealth Edison Company 2

FEB 2 71987 If your understanding of our discussicn is different from that stated above, please inform this office promptly.

Sincerely, ORIGINAL SIGNED BY A. BERT DAVIS A. Bert Davis Acting Regional Administrator cc:

D. L. Farrar, Director of Nuclear Licensing J. Eenigenburg, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunten, Attorney General's Office, Environmental Control Division W. Russell, NRR J. Hannon, NRR f

]

RII RIII RI RIII Rill RIII RI a

$L BLyrscn j) 2 periello Davis l

rdick/jk 1

Chrissotimos Nor

,ius l

02/27/87 02/2787 02/q/87 02/4/87 02/p/8 2/j7,/87 02/F)/87

-