ML20207Q880
| ML20207Q880 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/05/1987 |
| From: | Johnson B CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8703100139 | |
| Download: ML20207Q880 (4) | |
Text
6
-e i
i
@powmanus E
Consumers Power AMEMEAF5 PNSENE55 oeneral Offices: 1946 West Parnall Fload, Jackson, MI 49201 * (517) 788-0550 March 5, 1987 t
Nuclear Regulatory Commission i
Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
1987 PALISADES EMERGENCY EXERCISE SCOPE AND OBJECTIVES (75 DAY LETTER)
Attached is a description of the scope and objectives for the 1987 Palisades Plant emergency exercise. This utility-only exercise is scheduled for-May 19, 1987, and will involve no participation by Van Buren, Allegan or Berrien Counties or the State of Michigan. The Joint Public Information Center will not be activated.
Should you have questions on the exercise, the contact individual within Consumers Power Company is Anthony P Katarsky Emergency Planner 1945 W Parnall Road i
Jackson, MI 49201 (517) 788-2405 i
- _ :d Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector - Palisades Attachment O
5 t
p OC0387-0003-NLO4 l
v.
- -gg r.
;r q.
rj.A '
- 1.
O' g., '
4
- x
,,{'
&, ' g
,$d W'
']
n r}.-.-
f.
. =+ %
I
,_a. :.
.-.r i
u
- ./
+
_g e'
.~
.p,
.,,.,v.
r.
. ~...
c
' j f,,...
'a.
y
(
, v,
-j s
p*.
g y
??
+
7 f
4
[/
.. e y r
n 4.*-
t,-
} v? -
t 3s n
.t h.
'f
_. _ r
.J r
.'r.
Vj
.Ii
..,.f
'ya t
1,..
--g-
,n
,s, ATTACWENT r,f,.v e.'i n,
.,-,g
' 'g..
r-()'
- ,J. g
- 4..
'v-
/<v,onsumers Power Company a
r
", ~
Palisades Plant Y
'9 /
/
Docket 50-255
+
i r
m, a,
e 4
.)
y
%,c 3
r,i.-,
t
- u.,.,
.- w-j
,,'",3 x _,.
N
.>y.'
,, r 1987 EMERGENCY EXERCISE SCOPE AND OBJECTIVES-i e
m i,
f J
,Harch"5,1987 f
/
1 l -
4r
/
-/
r
.i '
s f
~ rf
.h;l;.
-b
.I
- v.
,i, r/
1,,,,
if I
r e,
t i,
/
t' i
i r
/
,l p.
i 4
l a s, w c, r
e.
L c
c 2 Pagss
'l
,/
je'i if' OC0387-0003-NL,04 et s
t
--o'..
e f
h
'I
,7 eI#[ he-L
.. _, ~-.
2
,m.
.u I
e g
i
.1.0 SCOPE AND OBJECTIVES a)
(
N.
1.1 SCOPE PALEX 87 is designed to meet exercise requirements specified in 10CFR50, Appendix E, Section IV.F.
It will postulate events which would require i,/
activation.of major portions'of the site emergency plan and response by
(
- offsite authorities. The exercise will-be' utility only. There will be no participation from state or local authorities. The Joint Public Information Center will not be activated. "
1.2 OBJECTIVES The exercise will demonstrate:
1.
Asser:sment 'and Classification n
n a.
Recognition of' emergency conditions b.
Timely classification of emergency conditions in accordance with emergency action levels 2.
Communication Initial notification within specified time constraints (state a.
andpocat-.15mie.utes,NRC-1 hour) x
.t b.
Subsequent! notification in accordance with procedure c.
Notification and coordination with other organizations, as re quired '(other utilities,. contractors,' fire or medical ~ services) d.* Provision of accurate and timely-information to support news release activity 3.
Radiological Assessment and Controi-Calculation of dose projection based on sample results of ^
a.
monitor readings e
b.
Performance of in-plant and offsite field surveys
- Collection and analysis of a post-accident primary coolant sample c.
d.
Trendibgofradiologicaldata
+ s Fo'rmulation of appropriate protective action recommendations e.
c f.
Contamination and exposure control OC0387-0003-NLO4 I-
f.#--$
i e
fe j;
4.
Emergency Response' Facilities a.
Activation, staffing and operation at appropriate
' classifications and within specified time constraints b.
Adequacy of emergency equipment'and supplies
[,
-c.
Adequacy of emergency communication systems-d.
Access control
- 5. ' Emergency Management
.a.
Command andLcontrol with transfer of responsibilities from
. Control Room'to Technical Support Center to Emergency Operations Facility 5p~ '-
b.
Assembly and accountability within 30 minutes
- c. ~ Coordination with State of Michigan emergency organization
- d. _ Mitigation of operational and' radiological conditions e.
Mobilization of emergency teams
..6.
Reentry and Recovery a.
Assessment of damage and formulation of recovery-plan b.
Identification of constraints, requirements and organization to imple ant-the plan 7.
Exercise Control a.
Provision for maximum free play b.
Accurate assessment of player performance 1
g l
f; -
1 5
1 l
4
'J' OC0387-0003-NLO4-i l
s i: