Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102A278 + (05:58:44, 6 January 2025)
- IR 05000272/1996007 + (06:00:57, 6 January 2025)
- ML18102A276 + (06:01:02, 6 January 2025)
- ML18102A275 + (06:01:04, 6 January 2025)
- ML18102A273 + (06:01:06, 6 January 2025)
- 05000272/LER-1994-015, :on 941018,determined That Refueling Water Storage Tank Volume Was Less than Required.Cause Not Determined.Properly Adjusted Transmitters & Returned RWST Level to Specification + (06:01:13, 6 January 2025)
- 05000311/LER-1996-005-02, :on 960627,surveillance of Fuel Handling Bldg Ventilation Sys Charcoal Adsorber Test Was Missed.Caused by Inattention to Detail.Individual Involved Received Appropriate Level of Positive Discipline + (06:01:17, 6 January 2025)
- TAC:M92725 + (06:01:19, 6 January 2025)
- ML18102A270 + (06:01:21, 6 January 2025)
- ML18102A269 + (06:01:23, 6 January 2025)
- ML18102A267 + (06:01:28, 6 January 2025)
- SCH96-104, NPDES Discharge Monitoring Repts for June 1996 for Salem Generating Station Units 1 & 2 + (06:01:29, 6 January 2025)
- ML18102A265 + (06:01:35, 6 January 2025)
- 05000272/LER-1996-010-01, :on 960619,identified Pressurizer Relief Tank Hydrodynamic Loads Had Not Previously Been Considered in Support Design.Caused by Failure to Consider Hydrodynamic Loads Caused by Water Discharge.Supports Revised + (06:01:38, 6 January 2025)
- 05000272/LER-1996-010, Forwards LER 96-010-00 Re Inadequate Pressurizer Relief Tank Supports.Attachment a Represents Commitment Made to NRC + (06:01:40, 6 January 2025)
- ML18102A261 + (06:01:43, 6 January 2025)
- ML18102A259 + (06:01:44, 6 January 2025)
- ML18102A257 + (06:01:45, 6 January 2025)
- ML18102A256 + (06:01:46, 6 January 2025)
- ML18102A254 + (06:01:47, 6 January 2025)
- ML18102A253 + (06:01:48, 6 January 2025)
- ML18102A251 + (06:01:49, 6 January 2025)
- ML18102A250 + (06:01:50, 6 January 2025)
- TAC:M95005 + (06:01:51, 6 January 2025)
- ML18102A249 + (06:01:53, 6 January 2025)
- ML18102A248 + (06:01:54, 6 January 2025)
- 05000272/LER-1996-008-01, :on 960613,failed to Meet Tech Spec Requirement While in Mode 5 for Natural Circulation.Caused by Insufficient Technical Input for Development of Controls. Revised Operating Logs for Mode 5 + (06:01:56, 6 January 2025)
- ML18102A246 + (06:01:58, 6 January 2025)
- ML18102A245 + (06:01:59, 6 January 2025)
- ML18102A244 + (06:02:01, 6 January 2025)
- ML18102A243 + (06:02:03, 6 January 2025)
- ML18102A237 + (06:02:07, 6 January 2025)
- ML18102A238 + (06:02:07, 6 January 2025)
- ML18102A236 + (06:02:10, 6 January 2025)
- IR 05000272/1996005 + (06:02:12, 6 January 2025)
- ML18102A233 + (06:02:13, 6 January 2025)
- ML18102A231 + (06:02:16, 6 January 2025)
- ML18102A232 + (06:02:16, 6 January 2025)
- 05000272/LER-1996-009-01, :on 960530,concluded Potential Common Mode Failure for 4 Kv Magne-Blast Breakers.Caused by Misalignment of Breaker Mechanism & Internals.Assessed Breaker Mechanism Misalignment for Each Breaker + (06:02:19, 6 January 2025)
- ML18102A229 + (06:02:20, 6 January 2025)
- ML18102A227 + (06:02:21, 6 January 2025)
- ML18102A226 + (06:02:24, 6 January 2025)
- ML18102A225 + (06:02:26, 6 January 2025)
- ML18102A223 + (06:02:28, 6 January 2025)
- IR 05000272/1996002 + (06:02:31, 6 January 2025)
- ML18102A221 + (06:02:33, 6 January 2025)
- ML18102A219 + (06:02:34, 6 January 2025)
- ML18102A218 + (06:02:35, 6 January 2025)
- ML18102A217 + (06:02:37, 6 January 2025)
- ML18102A214 + (06:02:38, 6 January 2025)
- SCH96-089, NPDES Monitoring Repts for May 1996 for Salem Generating Station + (06:02:39, 6 January 2025)