Forwards Integrated Insp Repts 50-272/96-07 & 50-311/96-07 on 960519-0629 & Notice of Violation.Technicians Have Not Been Trained & Performed Activities W/O Developed & Approved Procedure
ML18102A273
Person / Time
Site: Salem  
Issue date: 07/19/1996
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18102A274 List:
References
NUDOCS 9608020005
Download: ML18102A273 (3)


See also: IR 05000272/1996007

Text

'* .

July 19, 1996

Mr. Leon R. Eliason

President and Chief Nuclear Officer

Public Service Electric and Gas Company

P.O. Box 236

Hancocks Bridge, NJ

08038

SUBJECT:

NRC INTEGRATED IN')PECTION REPORT 50-272/96-07, 50-311/96-07

NOTICE OF VIOLATION

Dear Mr. Eliason:

On June 29, 1996, the NRC completed an inspection at your Salem 1 & 2 reactor

facilities. The enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection period, your conduct of

activities at the Salem facilities was generally *characterized by safety-

conscious operations, sound engineering and maintenance practices, and careful

radiological work controls. However, operators did not demonstrate a thorough

questioning attitude when evaluating three plant activities.

We are also

concerned about two violations of NRC requirements pertaining to failure to

comply with procedure requirements and failure to make a required report for a

defective plant component.

We also noted a number of examples of poor quality maintenance during the

inspection period. This -has bee*n a recurring problem in recent Salem history.

We are especially concerned, since equipment performance problems precipitated

and complicated many of the transients that have occurred at Salem.

The

problems in maintenance resulted, in part, from the procedure non-compliances

noted in the attached Notice of Violation.

We noted that you have initiated

comprehensive measures to correct the quality of maintenaDce.

During a followup inspection of a Magne-Blast circuit breaker performance

problem, the NRC determined that your staff did not make a required report per

10 CFR 21.

This problem indicated less than effective communication between

the engineering and licensing organizations, as well as *less than adequate

procedures regarding the reporting requirements of 10 CFR 21. This

constituted.a violation of 10 CFR 21 reporting requirements.

You are required

to respond to this matter in accordance with the enclosed Notice of Violation.

010001

9608020005 960719

PDR

ADOCK 05000272

G

PDR

Mr. Leon R. Eliason

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room

{PDR).

Docket Nos.:

50-272, 50-311

License Nos:

DPR-70, DPR-75

Sincerely,

ORIGINAL SIGNED BY:

Larry E. Nicholson, Chief

Projects Branch 3

Division of Reactor Projects

Enclosures: 1.

Notice of Violation

2.

Inspection Report 50-272/96-07, 50-311/96-07

cc w/encls:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice Pre$ident - Nuclear Engi~eering

E. Salowitz, Director - Nuclear Business Support

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire *

P. Macfarland Goelz, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

Mr. Leon R. Eliason

3

Distribution w/encls:

Region I Docket Room (with concurrences)

Kay Gallagher, DRP

Nuclear Safety Information Center (NSIC)

D. Screnci, PAO

NRC Resident Inspector

PUBLIC

Distribution w/encls: (Via E-Mail)

D. Vito, SAC

L. 01 sh an, NRR

W. Dean, OEDO

J. Stolz, PDI-2, NRR

J. Zimmerman, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (!PAS}

DOCUMENT NAM~:

a:9607_~zl

To receive :i. copy of \\his ~ment, indicale in the boXJ "Cf~'= Copy without attach_f'lent/enclosure "E' = Copy with-at!cchment;anclosuriil

copy

/1 /-,

/ -n'--

/

OFFICE **W7!L ______ _:

~!'-!ORP- =*

.LJl RI-:D!ir*=...:.:**=_::::;.::l =::;.1=-=== __ =. -=~:;;=:::;i

NA~E _.

1

~f1!~["-~-~-ha1...} ________ ... ~Bal"ber

--~~c_h_.G_d_s_o_..nf-______________

-11

DATE

  • 71' -/9

7///96

li'//'5 /96

  • --=~

---*-

-

J;-

--

/) ,., '

/V~*

o,::. .. c

f

-?

J__

I 7--; -/_

"N' =No