- ML18153B952 + (00:03:05, 6 January 2025)
- ML18153B951 + (00:03:05, 6 January 2025)
- ML18153B950 + (00:03:06, 6 January 2025)
- ML18153B948 + (00:03:07, 6 January 2025)
- ML18153B947 + (00:03:08, 6 January 2025)
- ML18153B945 + (00:03:08, 6 January 2025)
- 05000281/LER-1989-011-02, :on 890919,found That Pipe Support Rigidly Attached to Auxiliary Bldg Structure & Facility Containment Which Violates Design Requirements.Caused by Design Error. Pipe Support Modified + (00:03:10, 6 January 2025)
- 05000281/LER-1989-012-02, :on 890919,discovered That Two Individual Rod Position Indicators in Control Bank A,Group 2 Had Differed in Indicated Position.Caused by Inadequate Method Used to Log Accumulated Times.Procedures Modified + (00:03:12, 6 January 2025)
- IR 05000280/1989027 + (00:03:14, 6 January 2025)
- ML18153B940 + (00:03:15, 6 January 2025)
- PNO-II-89-072, on 891012,plant Shut Down Due to Leakage Past Pressurizer Safety Valve B.Operators Classified Leakage as Unidentified & Entered Tech Spec 3.1.C.2.Three Safety Valves Removed & Shipped to Westinghouse for Repair + (00:03:17, 6 January 2025)
- IR 05000280/1989021 + (00:03:21, 6 January 2025)
- 05000281/LER-1989-005-01, :on 890908,during Performance of Periodic Test on Turbine Bldg Flood Control Circuitry,Two of Four Condenser Waterbox Circulating Water Inlet Isolation Valves Closed Unexpectedly + (00:03:24, 6 January 2025)
- ML18153B936 + (00:03:25, 6 January 2025)
- ML18153B935 + (00:03:26, 6 January 2025)
- ML18153B934 + (00:03:27, 6 January 2025)
- ML18153B933 + (00:03:28, 6 January 2025)
- ML18153B932 + (00:03:29, 6 January 2025)
- ML18153B931 + (00:03:31, 6 January 2025)
- ML18153B930 + (00:03:33, 6 January 2025)
- 05000281/LER-1989-006-01, :on 890911,containment Particulate Radiation Monitor Indication Increased Above Alarm Setpoint.Caused by High Detector Reading Due to Containment Pressure Reduction. Alarm Reset & Suction Valves Realigned + (00:03:34, 6 January 2025)
- ML18153B928 + (00:03:36, 6 January 2025)
- 05000281/LER-1989-009-02, :on 890918,generator Backup Differential Lockout Relay 86 Tripped Turbine,Initiating Reactor Trip. Caused by Spurious Actuation of Impedance Relay KD-41.Unit Stabilized Following Trip + (00:03:37, 6 January 2025)
- 05000281/LER-1989-007-03, :on 890916,manual Reactor Trip Initiated When Determined That Improper Bank Overlap Existed Between Control Rod Banks a & B.Cause Not Found.Reactor Restarted After Review by Safety & Operating Committee + (00:03:43, 6 January 2025)
- ML18153B925 + (00:03:44, 6 January 2025)
- ML18153B923 + (00:03:45, 6 January 2025)
- 05000281/LER-1989-010-02, :on 890919,automatic Reactor Trip Generated as Result of lo-lo Steam Generator Level.Caused by Operator Raising Governor Valve Position Limiter More Rapidly than Desired.Lesson Learned Given to Personnel + (00:03:47, 6 January 2025)
- 05000281/LER-1989-008-03, :on 890916,noted That Position Indicating Lights for Containment Instrument Air Outside Trip Valve Not Lit & Trip Valve Failed to Closed Position.Caused by Loose Fuse in Control Power Circuit + (00:03:49, 6 January 2025)
- 05000281/LER-1989-005-03, :on 890908,two of Four Condenser Waterbox Circulating Water Inlet Isolation Valves Closed Unexpectedly During Performance of Periodic Test.Caused by Relay in Flood Control Circuit That Did Not Drop Out + (00:03:51, 6 January 2025)
- 05000280/LER-1989-038, :on 890903,emergency Diesel Generator 3 Started When Control Switch Was Placed from Exercise to Auto Position During Shutdown Attempt.Caused by hi-hi Consequence Limiting Safeguards Signal.Procedures Revised + (00:03:53, 6 January 2025)
- ML18153B918 + (00:03:54, 6 January 2025)
- ML18153B917 + (00:03:55, 6 January 2025)
- ML18153B916 + (00:03:56, 6 January 2025)
- ML18153B915 + (00:03:57, 6 January 2025)
- ML18153B914 + (00:03:58, 6 January 2025)
- ML18153B913 + (00:03:59, 6 January 2025)
- TAC:74537 + (00:04:00, 6 January 2025)
- ML18153B912 + (00:04:00, 6 January 2025)
- ML18153B910 + (00:04:01, 6 January 2025)
- ML18153B909 + (00:04:02, 6 January 2025)
- TAC:42967 + (00:04:03, 6 January 2025)
- ML18153B907 + (00:04:04, 6 January 2025)
- ML18153B905 + (00:04:05, 6 January 2025)
- ML18153B904 + (00:04:06, 6 January 2025)
- 05000280/LER-1989-035, :on 890813,one of Auxiliary Ventilation Sys Filtered Exhaust Fans Automatically Restarted After Being Stopped.Caused by Improper Landing of Previously Lifted Lead on Pressure Switch.Personnel Reinstructed + (00:04:08, 6 January 2025)
- 05000280/LER-1989-027, :on 890815,containment Gaseous Radiation Monitor Momentarily Increased Above Alarm Setpoint,Resulting in Closure of Containment Instrument Air Compressor Valves. Caused by Increase in Airborne Concentration + (00:04:10, 6 January 2025)
- ML18153B901 + (00:04:11, 6 January 2025)
- 05000281/LER-1989-003-02, :on 890813,charging Pump B Automatically Started After Control Switch Disengaged from pull-to-lock Position.Caused by Operator Not Adequately Engaging Pumps Switch in Position Prior to Event + (00:04:12, 6 January 2025)
- ML18153B899 + (00:04:13, 6 January 2025)
- PNO-II-89-065, on 890916,unit Manually Tripped During Startup Process Due to Problem W/Rod Bank Overlap.Two Addl Automatic Reactor Trips Experienced During Restart Process.Nrc 890309 Confirmatory Action Ltr Re Restart Had Been Lifted + (00:04:15, 6 January 2025)
- ML18153B897 + (00:04:20, 6 January 2025)