Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211H501 + (04:09:32, 6 December 2024)
- B16552, Submits Response to RAI Re Proposed TS Rev,Removing Reference to Specific Monitoring Location & Use of Average Value for Determining Ultimate Heat Sink Water Temp + (04:09:33, 6 December 2024)
- ML20211H498 + (04:09:33, 6 December 2024)
- ML20211H496 + (04:09:34, 6 December 2024)
- 05000483/LER-1986-035, :on 860928,containment Purge & Control Room Ventilation Isolation Occurred After Monitor GT-RE-32 Taken Out of Bypass.Caused by Random Fluctuations of Radioactivity Level.Plant Procedures Revised + (04:09:36, 6 December 2024)
- ML20211H493 + (04:09:37, 6 December 2024)
- ML20211H490 + (04:09:38, 6 December 2024)
- ML20211H491 + (04:09:38, 6 December 2024)
- B16712, Submits Update to GL 92-01 Response,Rev 1,Suppl 1 Reactor Vessel Structural Integrity for Unit 3,dtd 951113 + (04:09:50, 6 December 2024)
- ML20211H483 + (04:09:51, 6 December 2024)
- ML20211H481 + (04:09:51, 6 December 2024)
- ML20211H479 + (04:09:52, 6 December 2024)
- ML20211H475 + (04:09:59, 6 December 2024)
- ML20211H473 + (04:10:00, 6 December 2024)
- B16757, Provides 12 Month Special Rept Per TS 4.4.5.5.b & 6.9.2 Re Steam Generator Tube ISI Rept + (04:10:01, 6 December 2024)
- ML20211H471 + (04:10:01, 6 December 2024)
- ML20211H466 + (04:10:02, 6 December 2024)
- BSEP-97-0432, Forwards Response to RAI Re Reactor Vessel Matl Surveillance Program.Encl Also Contains Brunswick - Tensil Testing & Charpy Impact Testing of Reactor Archive Matl + (04:10:03, 6 December 2024)
- TXX-6297, Interim Deficiency Rept CP-86-72 Re Reverification of Small Bore Piping & Supports.Initially Reported on 860609. Continuing Engineering Evaluation Found No Addl Reportable Instances.Next Rept Will Be Submitted by 870410 + (04:10:03, 6 December 2024)
- ML20211H459 + (04:10:04, 6 December 2024)
- ML20211H453 + (04:10:05, 6 December 2024)
- ML20211H446 + (04:10:10, 6 December 2024)
- ML20211H445 + (04:10:11, 6 December 2024)
- ML20211H444 + (04:10:11, 6 December 2024)
- ML20211H442 + (04:10:12, 6 December 2024)
- 05000461/LER-1986-013, :on 861019,control Room Operator Placed source- Range Monitor Channel C Out of Operate,Causing Reactor Protection Sys Trip.Caused by Operator Failure to Follow Procedures.Operator Counseled.Scram Reset + (04:10:14, 6 December 2024)
- ML20211H438 + (04:10:15, 6 December 2024)
- ML20211H436 + (04:10:16, 6 December 2024)
- ML20211H434 + (04:10:17, 6 December 2024)
- ML20211H435 + (04:10:17, 6 December 2024)
- 05000304/LER-1986-014-04, :on 860519,reactor Tripped from 99.5% Power on lo-lo Steam Generator 2A Level.Caused by Technician Inadvertently Turning Off Feedwater Pump Controls.Large Caution Labels Installed on Feed Pump Controls + (04:10:19, 6 December 2024)
- 05000382/LER-1987-003, :on 870122,radiation Monitor Alarmed Due to Contaminated Instrument & Controls (I&C) Technician.Caused by Health Physics Technician Improperly Downgrading Work Permit Requirements.I&C Technician Retrained + (04:10:21, 6 December 2024)
- ML20211H431 + (04:10:22, 6 December 2024)
- ML20211H430 + (04:10:22, 6 December 2024)
- ML20211H429 + (04:10:23, 6 December 2024)
- 05000306/LER-1986-001-02, :on 860519,reactor Trip & Safety Injection Occurred.Caused by Inadvertent Release of Test Button During Safeguards Logic Testing.Event Discussed W/Involved Technician & Procedure Under Review + (04:10:24, 6 December 2024)
- ML20211H427 + (04:10:25, 6 December 2024)
- ML20211H423 + (04:10:26, 6 December 2024)
- ML20211H421 + (04:10:27, 6 December 2024)
- ML20211H420 + (04:10:29, 6 December 2024)
- 05000271/LER-1986-006, :on 860521,unanticipated Full Scram Signal Received While Testing/Troubleshooting Local power-range Monitor (LPRM) Cables.Caused by Connection of LPRM Test Instrument Detector to APRM Electronics + (04:10:31, 6 December 2024)
- ML20211H415 + (04:10:32, 6 December 2024)
- TXX-6063, Interim Deficiency Rept CP-85-26 Re Steam Generator Upper Lateral Restaint Embedment Design.Initially Reported on 850719.Analysis of Issue Based on Revised Loadings on Beams & Beam Connections.Next Rept Expected by 861203 + (04:10:32, 6 December 2024)
- ML20211H413 + (04:10:33, 6 December 2024)
- ML20211H412 + (04:10:34, 6 December 2024)
- IR 05000508/1986012 + (04:10:44, 6 December 2024)
- ML20211H407 + (04:10:45, 6 December 2024)
- ML20211H406 + (04:10:46, 6 December 2024)
- ML20211H405 + (04:10:47, 6 December 2024)
- ML20211H404 + (04:10:47, 6 December 2024)
- ML20211H402 + (04:10:48, 6 December 2024)