Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211P603 + (02:24:50, 6 December 2024)
- ML20211P600 + (02:24:53, 6 December 2024)
- ML20211P598 + (02:24:54, 6 December 2024)
- ML20211P597 + (02:24:54, 6 December 2024)
- ML20211P595 + (02:24:55, 6 December 2024)
- ML20211P593 + (02:24:56, 6 December 2024)
- RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee + (02:24:56, 6 December 2024)
- ML20211P592 + (02:24:57, 6 December 2024)
- ML20211P590 + (02:24:58, 6 December 2024)
- ML20211P588 + (02:24:59, 6 December 2024)
- ML20211P586 + (02:24:59, 6 December 2024)
- ML20211P585 + (02:25:00, 6 December 2024)
- ML20211P583 + (02:25:01, 6 December 2024)
- ML20211P582 + (02:25:01, 6 December 2024)
- ML20211P581 + (02:25:02, 6 December 2024)
- IR 05000219/1987002 + (02:25:03, 6 December 2024)
- ML20211P577 + (02:25:05, 6 December 2024)
- ML20211P578 + (02:25:05, 6 December 2024)
- ML20211P576 + (02:25:06, 6 December 2024)
- SVP-97-226, Responds to NRC 970425 & s Re Violations Noted in Insp Repts 50/254/97-02 & 50/265/97-02.Corrective Actions: on 970307,B Channel of RPS Was Returned to Tripped Condition & 108D Relay Was Declared Inoperable + (02:25:06, 6 December 2024)
- ML20211P572 + (02:25:07, 6 December 2024)
- ML20211P571 + (02:25:08, 6 December 2024)
- ML20211P570 + (02:25:09, 6 December 2024)
- ML20211P569 + (02:25:09, 6 December 2024)
- ML20211P568 + (02:25:10, 6 December 2024)
- ML20211P565 + (02:25:12, 6 December 2024)
- ML20211P561 + (02:25:13, 6 December 2024)
- ML20211P559 + (02:25:13, 6 December 2024)
- 05000219/LER-1997-012, :on 970916,setpoint Was Found to Be non-conservative.Caused by Failure to Include Possible Uncertainties.Appropriate Procedures Were Revised to Reflect New Setpoint Based on SE + (02:25:15, 6 December 2024)
- ML20211P554 + (02:25:16, 6 December 2024)
- ML20211P553 + (02:25:17, 6 December 2024)
- NRC-97-0113, Submits Commitments Re Fermi 2 S/Rv as Agreed During 971015 + (02:25:18, 6 December 2024)
- ML20211P549 + (02:25:19, 6 December 2024)
- NSD-NRC-97-5374, Submits AP600 Response to Loss of Offsite Power That Was Requested by Tad Arsh at 970904,meeting W/Nrc on Fire Protection.Analysis Uses More Realistic Assumptions than Used in SSAR Analysis + (02:25:22, 6 December 2024)
- ML20211P546 + (02:25:25, 6 December 2024)
- BSEP-87-0181, Semiannual Radioactive Effluent Release Rept Jul-Dec 1986 + (02:25:26, 6 December 2024)
- ML20211P545 + (02:25:26, 6 December 2024)
- ML20211P542 + (02:25:27, 6 December 2024)
- ML20211P543 + (02:25:27, 6 December 2024)
- 3F0287-17, Ro:On 870121,during Performance of Surveillance Procedure SP-110,CRD a Ac Breaker Failed to Trip.Caused by Malfunction of Undervoltage Trip Coil Device.Breaker Replaced & Successfully Tested + (02:25:29, 6 December 2024)
- ML20211P539 + (02:25:30, 6 December 2024)
- ML20211P537 + (02:25:30, 6 December 2024)
- ML20211P533 + (02:25:31, 6 December 2024)
- ML20211P531 + (02:25:32, 6 December 2024)
- ML20211P532 + (02:25:32, 6 December 2024)
- ML20211P529 + (02:25:33, 6 December 2024)
- ML20211P527 + (02:25:35, 6 December 2024)
- 05000220/LER-1986-020, :on 860618,during Startup from Refueling Outage,Pinhole Leak Discovered in newly-installed 3/4-inch Sample Line Outside Primary Containment.Caused by Flaw in Pipe.Line Disconnected,Capped & Tested + (02:25:35, 6 December 2024)
- ML20211P526 + (02:25:36, 6 December 2024)
- ML20211P523 + (02:25:38, 6 December 2024)
- ML20211P522 + (02:25:39, 6 December 2024)