Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211P790 + (02:21:13, 6 December 2024)
- ML20211P789 + (02:21:14, 6 December 2024)
- ML20211P787 + (02:21:14, 6 December 2024)
- ML20211P785 + (02:21:15, 6 December 2024)
- ML20211P783 + (02:21:15, 6 December 2024)
- ML20211P782 + (02:21:16, 6 December 2024)
- ML20211P781 + (02:21:17, 6 December 2024)
- 05000409/LER-1986-035, :on 861118,failure of Low turbine-condenser Vacuum Relay SK25/1 Caused Reactor Scram W/Excessively Fast Cooldown.Caused by Failure of Allied Control,Model MHYO-12A 115-volt Ac Relay + (02:21:19, 6 December 2024)
- ML20211P777 + (02:21:23, 6 December 2024)
- ML20211P775 + (02:21:24, 6 December 2024)
- ML20211P773 + (02:21:25, 6 December 2024)
- ML20211P772 + (02:21:25, 6 December 2024)
- ML20211P770 + (02:21:26, 6 December 2024)
- ML20211P771 + (02:21:26, 6 December 2024)
- ML20211P768 + (02:21:27, 6 December 2024)
- ML20211P767 + (02:21:27, 6 December 2024)
- ML20211P765 + (02:21:28, 6 December 2024)
- ML20211P763 + (02:21:29, 6 December 2024)
- ML20211P764 + (02:21:29, 6 December 2024)
- ML20211P760 + (02:21:30, 6 December 2024)
- ML20211P759 + (02:21:31, 6 December 2024)
- ML20211P757 + (02:21:31, 6 December 2024)
- ML20211P755 + (02:21:36, 6 December 2024)
- ML20211P754 + (02:21:37, 6 December 2024)
- ML20211P753 + (02:21:37, 6 December 2024)
- ML20211P752 + (02:21:39, 6 December 2024)
- ML20211P751 + (02:21:40, 6 December 2024)
- ML20211P747 + (02:21:41, 6 December 2024)
- 05000334/LER-1997-031, :on 970919,identified That Routine Testing of Surveillance Procedures for ESF Were Inadequate.Caused by Inadequate Development of Procedures.Will Develop Addl Routine Surveillance Testing + (02:21:43, 6 December 2024)
- ML20211P743 + (02:21:44, 6 December 2024)
- NPL-97-0644, Submits Addl Response to Violations Noted in Insp Repts 50-266/96-18 & 50-301/96-18.Corrective Actions:Agrees W/Interpretation That Nf Boundary Extends to Bldg Surface + (02:21:45, 6 December 2024)
- ML20211P738 + (02:21:46, 6 December 2024)
- ML20211P737 + (02:21:47, 6 December 2024)
- ML20211P735 + (02:21:47, 6 December 2024)
- ML20211P734 + (02:21:48, 6 December 2024)
- 05000423/LER-1997-049, :on 970910,water Was Inadvertently Added to RCS While Entered Into LCO Action Statement.Caused by Inadequate Verification & Validation of Sys Configuration Prior to Conducting Pump Test.Counseled Operations Shift Personnel + (02:21:50, 6 December 2024)
- ML20211P731 + (02:21:51, 6 December 2024)
- ML20211P726 + (02:21:52, 6 December 2024)
- ML20211P725 + (02:21:53, 6 December 2024)
- ML20211P722 + (02:21:56, 6 December 2024)
- ML20211P721 + (02:21:57, 6 December 2024)
- ML20211P720 + (02:21:57, 6 December 2024)
- ML20211P719 + (02:21:58, 6 December 2024)
- 05000416/LER-1997-004-03, :on 970911,failure to Declare Valve Inoperable During Work Having ISI Required Stroke Time Retest Occurred. Caused by Failure to Follow Work Control Process.Appropriate Personnel in Depts Involved Being Trained + (02:22:01, 6 December 2024)
- ML20211P713 + (02:22:04, 6 December 2024)
- 05000374/LER-1986-012-06, :on 860620,electrical Termination at Inboard & Outboard MSIV Limit Switches Not Installed in Environ Qualification Tested Configuration.Caused by Deficient Installation Procedures.Procedures Revised + (02:22:04, 6 December 2024)
- ML20211P712 + (02:22:05, 6 December 2024)
- ML20211P711 + (02:22:06, 6 December 2024)
- ML20211P709 + (02:22:07, 6 December 2024)
- ML20211P708 + (02:22:08, 6 December 2024)
- ML20211P707 + (02:22:11, 6 December 2024)