Q>mmonw calth 141mn Compam IaNiile Generating Marion 2(01 Nonh 21st Road Marseilles, 11.61341-9757 Tel 815-3574761 October 13,1997 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Supplemental Response to NRC Inspection Report No. 50-373/96011; 50-374/96011 (DRP)
LaSalle County Station, Units 1 and 2 Facility Operating License NPF 11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Reference:
W. T. Subalusky Letter to U.S. NRC Document Control Desk dated July 3,1997, Transmitting Supplementa; -
Response to inspection Report 373/374 96011 The referenced letter provided a status of our response to the subject inspection report, and provided a resolution date of October 15,1997, foi violation 373/374-96011-18. This violation identified that the LaSalle Updated Final Safety Analysis Report (UFSAR) had not been updated to i
reflect the change in initial and maximum suppression pool temperatures approved by License Amendments 67 (Unit 1) and 49 (Unit 2), issued t
July 1989.
The October 15,1997, completion date was contingent on General Electric (GE) performing a review of their design configuration methods to ensure that margins of safety are not affected by accumulating affects of multiple parameter changes over a period of tinis. The schedule has been impacted by a Comed imposed Stop Work Order (SWO) on GE, and a dats for lifting g
the SWO has not yet been established. Therefore, the completion date for
\\
violation 373/374-96011-18 has been extended to 60 days following receipt
/
of the review data from GE.
/ / g,
\\
9710210199 971013 11,1 !
i A Unicom Compm)
f h
~
If there are any questions or comments concoming this letter, please refer them to me at (815) 357-6761, extension 3600.
Respectfully, _
pn i
W. T. Subalusky Site Vice President LaSalle County Station cc:
A. B. Beach, NRC Region ill Administrator M. P. Huber, NRC Senior Resident inspector - LaSalle D. M. Skay, Project Manager - NRR - LaSalle F. NIziolek, Office of Nuclear Facility Safety - lDNS I