ML20211P711
| ML20211P711 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/14/1986 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Puntenney J SAFE ENERGY COALITION OF MICHIGAN |
| Shared Package | |
| ML20211P714 | List: |
| References | |
| FOIA-86-245 NUDOCS 8607230340 | |
| Download: ML20211P711 (12) | |
Text
r poR-ou.
c uam
,#[ '
Ig UNITED STATES y'3 p,
NUCLEAR REGULATORY COMMISSION tj
'VASHINGTON. D. C. 20555 JUL 14 1986 Docket No. 50-341 Ms. Jennifer E. Puntenney Safe Energy Coalition of Michigan P.O. Box 331 IN RESPONSE REFER Monroe, MI 48161 TO FOIA-86-245
Dear Ms. Puntenney:
This is in partial response to your letter dated March 24, 1986, in which you requested, pursuant to the Freedom of Information Act (F0IA), copies of three categories of records regarding the Fermi 2 nuclear power plant.
The documents identified on the enclosed Appendix A are being placed in the NRC Public Document Room (PDR) located at 1717 H Street, NW, Washington, DC 20555, in file folder F01A-86-245 in your name. The documents are also being placed in the Local Public Document Room (LPDR) for Fermi located at the Monroe County Library System, 3700 S. Custer Road, Monroe, MI 48161.
The documents identified on enclosed Appendix B were located in the Office of Investigations' Program Review of the Fermi Safeteam file. The release determination is indicated beside each document description. The four documents identified by asterisks on Appendix B are undergoing further review to determine their releasability. We will notify you upon completion of the review.
Information being withheld pursuant to Exemption (6) consists of
~
personal information the release of which would constitute a clearly unwarranted invasion of personal privacy. The information is being withheld pursuant to Exemption (6) of the F0IA, 5 U.S.C. 552(b)(6), and 10 CFR 9.5 (a)(6) of the Commission's regulations.
Information being withheld pursuant to Exemption (5) consists of the predecisional analyses, opinions, and recommendations of the staff.
Because the information reflects the predecisional process of the staff, the information is exempt from mandatory disclosure pursuant to Exemption (5) of the F0IA, 5 U.S.C. 552(b)(5), and the Commission's regulations at 10 CFR 9.5(a)(5). Release of the information would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. The releasable portions of the documents on Appendix B are being placed in PDR folder F01A-86-245 and in the LPDR. The information being withheld in its entirety contains no reasonably segregable factual portions.
Pursuant to 10 CFR 9.15 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The person responsible for this denial is Mr. Ben B. Hayes, Director, Office of Investigations.
8607230340 860714 PDR FOIA PUNTENN86-245 PDR
.J
Ms. Puntenney This denial may be appealed to the Secretary of the Commission within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."
The search for and review of documents that are subject to your request are continuing. We will notify you upon completion of the search and review.
Sincerely, y,p Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosures:
As stated es M.
~
4 3
,e 4
.M-e-
-,,,.--w
.-y
,,--e e
,e
--e,yy,
+---..ry-.-
g.--
- +. ----y7-
f Appendix A F0IA 86-245 1.
Undated Allegation data input form and Allegation Computec Update Sheet (2 pages) 2.
06/13/85 Memo to B. Hayes from J. G. Keppler re: Request for Program Review of the Fermi SAFETEAM (1 page) 3.
07/09/85 Memo to P. M. Byron from C. H. Weil re:
Fermi SAFETEAM Concern No. 676 (50-341) (1 page) 4.
07/15/85 Preliminary Notification of Event or Unusual Occurrence--PNO-III-85-58 (1 page) 5.
07/17/85 Preliminary Notification of Event or Unusual Occurrence--PNO-III-85-58A (1 page) 6.
07/17/85 Memo.to P. Byron from W. J. Kaczor re: SAFETEAM Concerns (1 page) s 7.
07/25/85 Memo to E. T. Pawlik from C. H. Weil re:
Fermi SAFETEAM Concern No. 676 (50-341) (1 page) 8.
08/05/85 Memo to E. Pawlik from C. H. Weil re:
Fermi SAFETEAM Concern Nos. 665 and 673 (1 page) 9.
08/08/85 Preliminary Notification of Event or Unusual Occurrence--PNO-III-85 __ (1 page),
- 10. 09/10/85 Presentation Outline (draft) (25 pages) 11.
10/85 Handwritten notes for presentation to the Monroe County Commissioners on 10/10/85 (2 pages) 12.
12/11/85 Note to J. G. Keppler from A. B. Davis re:
Fermi Diesel Generators (4 pages)
I
- 13. Undated Handwritten notes " Fermi Items" (1 page)
- 14. Undated S&W Evaluation Completion of Engineering Work (2 pages)
- 15. Undated Handwritten notes re:
Bearing Failure on the Emergency Diesel Generators at Fermi 2 (6 pages)
- 16. 01/24/86 Agenda - Equipment liistory Problems Other Causes Corrective Action Schedule (36 pages) 1 ll
FOIA 86-245 APPENDIX A CONTINUED
- 17. 02/14/86 Presentation NRC - Detroit Edison Management Meeting to Discuss Emergency Diesel Generator Issues, Glen Ellyn, Illinois (8 pages)
- 18. 02/14/86 NRC - Detroit Edison Management Meeting to Discuss Emergency Diesel Generator Issues (8 pages)
- 19. 02/28/86 Memo from E. G. Greenman to N. J. Chrissotimos re:
Fermi 2 South Reactor Feedwater Pump Turbine Failure (DN50-341) (15 pages)
- 20. 03/11/86 Memo from E. G. Greenman to J. G. Keppler re:
Fermi Status w/ enclosures (250 pages)
- 21. 03/12/86 Slides re: Commission Briefing on Fermi 2
~
Status (5 pages) l 1
1 2
---,c.
,7
,,.,m_-_.,y
_yy.y.,_%._
m.
-. _.--_,y-
,_,m_.=
,f
._y y-
__,y
Re:
FOIA-86-245 APPENDIX B Documents Located In Office of Investigations' Program Review of Fermi Safeteam File DOCUMENT DATE DOCUMENT DESCRIPTION RELEASE DETERMINATION
- 1. 10/04/85 Memo for Keppler from Hayes Release Request for Program Review of Fermi Safeteam Program
- 2. 10/29/85 Memo for Norelius from CWeil Release Office of Investigations' Review of The Fermi Safeteam (50-341)(AMS No. RIII-85-A-017)
- 3. 8/16/85 Memo for Youngblood and Haass Release from Taylor:
Your joint memorandum concerning audit of Safeteam activities at Fermi 2
- 4. 7/31/85 01 Program Review of Fermi Portions being released, Portion being denied - Exemption 6, portions undergoing review ATTACHMENTS TO 01 PROGRAM REVIEW 0F FERMI SAFETEAM
- 5. 1/3/85 : Memo from Kaczor Release to Jens
- 6. Undated :
Form Portions undergoing Review, Portions being denied, Exemption 6
Re:
F01A-86-245 APPENDIX B (cont'd)
DOCUMENT DATE DOCUMENT DESCRIPTION RELEASE DETERMINATION
- 7. Undated Attachnent 3: Manual Undergoing review
- 8. Undated : Emergency Release Safeteam Operation Criteria for Handling Nuclear Safety Related (QAL-1 only) Concerns During Emergency Situations
- 9. Undated :
Paper Flow Chart Release
- 10. Undated : Concern Report Release Form
- 11. Undated : Safeteam Release
- 12. 12/1/83 : Safeteam Release Investigation Duties
- 13. Undated :
Personnel Job Release Descriptions and Critical Functions
- 14. 5/17/85 0: Safeteam -
Release Future - Now until Commerical Operation
- 15. 6/18/85 1: Memo from Kactor Release to Leach
- 16. Undated 2: Weekly Status Release Report
- 17. Undated 3: Safeteam Exit Portions Interview Process Undergoing Review, Portions Being Denied Under Exemption 6
- 18. 6/19/85 4:
Resume Portions being Released, portions Being Denied -
Exemption 6
- 19. 6/19/85 5: Resume Portions Being Denied Exemption 6 2
Re:
F01A-86-245 APPENDIX B (cont'd)
DOCUMENT DATE DOCUMENT DESCRIPTION RELEASE DETERMINATION
- 20. Undated 6:
Resume Denied, Exemption 6 in its entirety
- 21. Undated 7:
Resume Denied, Exemption 6 in its entirety
- 22. Undated 8: Resume Denied, Exemption 6 in its entirety
- 23. Undated 0: Resume Denied, Exemption 6 in its entirety
- 24. 2/8/84 1:
Resume Denied, Exemption 6 i
in its entirety
- 25. Undated 2:
Resume Denied, Exemption 6 in its entirety
- 26. Undated 3: Resume Denied, Exemption 6 in its entirety
- 27. Undated 4: Resume Denied, Exemption 6 in its entirety
- 28. Undated 5: Resume Portions being W/ attached job description denied, Exemption 6
- 29. Undated 6:
Resume Denied, Exemption 6 in its entirety
- 30. Undated 7:
Resume Denied, Exemption 6 in its entirety
[
- 31. Undated 8:
Resume Denied, Exemption 6 in its entirety
- 32. 6/18/85 9: Handwritten Memo Release from Harold Walker
- 33. 4/8/83 0: Memo to DECO Portions Being Denied - Exemption 6
- 34. 6/20/85 1:
Resume Denied, Exemption 6 in its entirety
- 35. 6/20/85 2:
Resume Denied, Exemption 6 in its entirety 3
3 Re:
F0IA-86-245 APPENDIX B (cont'd)
DOCUMENT DATE C0CUMENT DESCRIPTION RELEASE DETERMINATION
- 36. 6/20/85 3:
Resume Denied, Exemption 6 in its entirety
- 37. 6/20/85 4: Resume Denied, Exemption 6 in its entirety
- 38. 6/20/85 5:
Resume Denied, Exemption 6 in its entirety
- 39. 6/20/85 6:
Resume Denied, Exemption 6 in its entirety
- 40. 6/20/85 7:
Resume Denied, Exemption 6 in its entirety
- 41. 6/20/85 8:
Resume Denied, Exemption 6 in its entirety
- 42. 6/20/85 9:
Resume Denied, Exemption 6 in its entirety
- 43. 6/20/85 0:
Resume Denied, Exemption 6 in its entirety
- 44. 6/20/85 1:
Resume Denied, Exemption 6 in its entirety
- 45. 6/20/85 2:
Resume Denied, Exemption 6 in its entirety 46.
6/20/85 3: Resume Denied, Exemption 6 in its entirety 47.
6/20/85 4: Resur..e Denied, Exemption 6 in its entirety
- 48. 6/20/85 5: Resume Denied, Exemption 6 in its entirety
- 49. 6/20/85 6: Resume Denied, Exemption 6 in its entirety
- 50. 6/20/85 7:
Resume Denied, Exemption 6 in its entirety t
l 51.
12/2/83 8: Memo from Denied Exemption 6 Kunkle to Heffner in its entirety l
Re:
F01A-86-245 APPENDIX B (cont'd)
DOCUMENT DATE DOCUMENT DESCRIPTION RELEASE DETERMINATION
- 52. Undated 9: Memo from Denied, Exemption 6 Byron: Safeteam Interview in its entirety 120, Memo to File Dated January 10, 1984
- 53. 5/15/84 0: Memo to Kunkle:
Denied, Exemption 6 Response to Safeteam Interview in its entirety No. 203
- 54. 8/17/83 1: Memo to Heffner:
Denied, Exemption 6 Response to Safeteam Review in its entirety No. 370 55.
12/15/64 2: Memo from Release Kunkle to Heffner
- 56. 2/10/84 3: Memo to Kunkle Portions Being Denied Response to Safeteam Interview Exemption 6 No. 460
- 57. 3/21/84 4: Memo to Kunkle Portions Being Denied Response to Safeteam Intereview Exemption 6 No. 470
- 58. 10/25/84 5: Memo to Kunkle Portions Being Denied Final Response to Safeteam Exemption 6 Interview No. 487
- 59. 3/8/84 6: Memo to Kunkle Portions Being Denied Response to Safeteam Interview Exemption 6 No. 495
- 60. 10/1/84 7: Memo to Kunkle Portions Being Denied Final Response to Safeteam Exemption 6 Interview. No. 543
- 61. 1/24/85 8: Memo to Kunkle Portions Being Denied Response to Safeteam Interview Exemption 6 No. 565
- 62. 5/16/85 9: Memo to CWeil Portions Being Denied from Byron Exemption 6
- 63. Undated 0: Non Manual Portions Being Denied Exemption 6
- 64. 6/11/85 1: Memo from Kaczor Portions Being Denied to Bryon Exemption 6 5
I.-
f Re:
F01A-86-245 APPENDIX B (cont'd)
DOCUMENT DATE DOCUMENT DESCRIPTION RELEASE DETERMINATION
- 65. 11/29/84 2: Memo to Kunkle Portion Being Denied Final Response to Safeteam Exemption 6 Interview No. 1368
- 66. 4/12/83 3: Project Safeteam Portions Being Denied Report Exemption 6
- 67. 4/12/83 4:
Project Safeteam Portions Being Denied Report Exemption 6
- 68. 11/16/83 5: Memo to Heffner Portions Being Denied Response to Safeteam Review Exemption 6 No. 28-B
- 69. 4/13/83 6:
Project Safeteam Portions Being Denied Report Exemption 6 4
a i
- 70. 1/13/84 7:
Letter from DECO Portions Being Denied re Concern Heffner No. 39 Exemption 6
- 71. 11/28/83 8: Memo from Kunkle Portions Being Denied to Heffner Exemption 6
- 72. 1/13/84 9: Letter from Deco Portions Being Denied Exemption 6
- 73. 1/24/Lt, httachnent 70: Verc to Lauer Fortions Beii.g Deined Exemption 6
- 74. 12/27/83 1: Letter from Portions Being Denied Deco to Concern (Heffner) No. 56 Exemption 6
- 75. 11/16/83 2: Memo to Kunkle Portions Being Denied to Heffner Exemption 6
- 76. 2/6/85 Attachroeiit 73: Memo to Kaczor Portions Being Denied Laei..ptier, 6 i..
.f., P3
/d i c r l i u.t ; <.
Le i te r frr ri it niu.s Ec ti:9 Lenied la. 'i+i
't fri t t rn No.158 Exemption 6
- 78. 11/29/84 5: Memo from Portions Being Denied Kaczor to Kunkle Exemption 6 6
i
-.,, ~
,w
-,,,,,.., -, - -,,,, -. - +. -., - - - - - - - - -,, -,. _, -.
-,_..-n
-_n--. -.,,.. - -, - - - - - - - - - - - -, - - - - -,, -,
~
Re:
F01A-86-245 APPENDIX B (cont'd)
DOCUMENT DATE DOCUMENT DESCRIPTION RELEASE DETERMINATION
- 79. 5/11/83 6: Form Portions Being Denied Exemption 6
- 80. 11/11/83 7:
Letter to Portions Being Denied Heffner Co Concern No. 0243 Exemption 6
- 81. 7/28/83 8:
Form Portions Being Denied Exemption 6
- 82. 10/6/84 9: Memo from Kaczor Release Co. Kunkle
- 83. 8/24/84 0:
Form Portions Being Denied Exemption 6
- 84. 6/4/84 1:
Letter from Portions Being Denied Heffner to Concern No. 407 Exemption 6
- 85. Undated 2:
Form Portions Being Denied Exemption 6
?
- 86. 2/4/84 3:
Letter from Portions Being Denied Heffner to Concern No. 439 Exemption 6
- 87. Undated 4:
Form Portions Being Denied Exemption 6
- 88. Undated 5:
Form Porticri L.e ng Daliad Exemption 6
- 89. Undated 6:
Form Portions Being Denied Exemption 6
- 90. 10/5/84 7: Memo *om Kaczor Release to Kunkle
- 91. 1/27/85 8: Memo to Kaczor Portions Being Denied Exenpt on 6
- 92. Undated 9:
Form Portions Being Denied Exemption 6 7
~
Re:
F01A-86-245 APPENDIX B (cont'd)
DOCUMENT DATE DOCUMENT DESCRIPTION RELEASE DETERMINATION
- 93. 5/29/85 0:
Form Portions Being Denied Exemption 6
- 94. 5/3/84 1: Memo from Kunkle Portions Being Denied to Sigedick Exemption 6
- 95. 2/3/84 2:
Form Portions Being Denied Exemption 6
- 96. 10/5/84 3:
Form Portions Being Denied Exemption 6
- 97. Undated Various drafts and handwritten Exemption 5 in its comments on the 01 Program Entirety Review of the Fermi Safeteam (approximately 600 pages)
- 98. Undated Attachnent 19: Resume Denied, Exemption 6 in its entirety b
+
k 8
7 T
l SAFE ENERGY COALITION OF MICHIGAN P.O. BOX 331 MONR0E,. MICHIGAN 48161 March 24, 1986 Freedom ~of Information Officer FREEDOM OF INFORMATION
~
U.S. Nuclear Regulatory Commission ACT REQUEST Washington, D.C. 20555 For A-h ats
Dear Sir /Ms. :
b Pursuant the Freedom of Information Act. 5 USC 552 et Seq. as amended, the Safe Energy Coalition of Michigan hereby request material as described belows (1)
Copy of the Office of Investigations report and conclusions on the Detroit Edison Company's Fermi 2 nuclear power plant re-garding the July 2nd, 1985 criticality /out-of-sequence control rod
- incident, (2)
Copy of the Office of Investigator and Auditor report and con-clusions on the NRC and its involvement in the Fermi 2 nuclear power plant July 2nd, 1985 criticality incident,
( 3)
All internal memos, correspondence, documents, and a copy of the Office of Investigations report and conclusions on the Fermi 2 SAFETEAM (Detroit Edison Co., Monroe County, inichigan).
l l
Pursuant. 5 USC 552 (a) (4)(A), we hereby request waiver of all fees in connection with this request "because furnishing the informa-tion can be considered primarily benefitting the general public."
If any fees are to be charged in connection with this request, please notify us in advance for approval at the above address or at this telephone number 313-477-3M1 or 313-477-1670.
This advance notice shall not be necessary if the fees are to be less than $ 15 00 in total.
We look forward to your response within ten (10) business days after you receive this requent, as specified in the Act. (FOIA).
Thank you for your hblp in this matter.
Sincerely, rbnfL b.
or nru<