Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212C033 + (12:47:24, 5 December 2024)
- ML20212C032 + (12:47:25, 5 December 2024)
- ML20212C030 + (12:47:26, 5 December 2024)
- ML20212C028 + (12:47:27, 5 December 2024)
- ML20212C027 + (12:47:27, 5 December 2024)
- ML20212C026 + (12:47:28, 5 December 2024)
- LIC-97-0172, Submits Comments on Technical Review of Draft Info Notice Re Extraction Steam Pipe Rupture at Plant + (12:47:29, 5 December 2024)
- ML20212C023 + (12:47:29, 5 December 2024)
- ML20212C021 + (12:47:30, 5 December 2024)
- IR 05000333/1986021 + (12:47:34, 5 December 2024)
- ML20212C016 + (12:47:35, 5 December 2024)
- IR 05000348/1999005 + (12:47:36, 5 December 2024)
- ML20212C013 + (12:47:37, 5 December 2024)
- ML20212C009 + (12:47:37, 5 December 2024)
- ML20212C006 + (12:47:38, 5 December 2024)
- ML20212C007 + (12:47:38, 5 December 2024)
- IR 05000213/1986030 + (12:47:43, 5 December 2024)
- NRC-99-0080, Comment Opposing Proposed Rule 10CFR50 Re Consideration of Potassium Iodide in Emergency Plans.Detroit Edison Strongly Urges NRC to Not Issue Amend to 10CFR50.47 + (12:47:44, 5 December 2024)
- PNO-III-86-150, on 861218,licensee Entered Mode 4 from Mode 3 to Investigate 861215 Failure of MSIV to Close Per Tech Specs.Leak in Pressurizer Level Sensing Line Isolation Valve Will Be Repaired.Investigation Continuing + (12:47:45, 5 December 2024)
- ML20212C003 + (12:47:45, 5 December 2024)
- ML20212C000 + (12:47:46, 5 December 2024)
- ML20212B999 + (12:47:47, 5 December 2024)
- ML20212B996 + (12:47:47, 5 December 2024)
- ML20212B994 + (12:47:48, 5 December 2024)
- ML20212B992 + (12:47:48, 5 December 2024)
- ML20212B991 + (12:47:52, 5 December 2024)
- ML20212B989 + (12:47:53, 5 December 2024)
- ST-HL-AE-1880, Forwards marked-up FSAR Pages 9.3-1 Through 9.3-6,reflecting Revs from Update & Consistency Check of Instrument & Svc Air Sys Writeup in FSAR Vs Latest P&ID + (12:47:56, 5 December 2024)
- ML20212B986 + (12:47:57, 5 December 2024)
- ML20212B985 + (12:47:58, 5 December 2024)
- ML20212B983 + (12:47:58, 5 December 2024)
- ML20212B979 + (12:47:59, 5 December 2024)
- NG-86-2590, Response to IE Bulletin 86-002,Item 1 Re Static O-ring Differential Pressure Switches.Series 102 or 103 Pressure Switches Not Installed at Facility + (12:47:59, 5 December 2024)
- NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H + (12:48:00, 5 December 2024)
- ML20212B975 + (12:48:01, 5 December 2024)
- ML20212B976 + (12:48:01, 5 December 2024)
- ML20212B974 + (12:48:02, 5 December 2024)
- ML20212B971 + (12:48:06, 5 December 2024)
- B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With + (12:48:06, 5 December 2024)
- ML20212B968 + (12:48:07, 5 December 2024)
- ML20212B962 + (12:48:08, 5 December 2024)
- ML20212B964 + (12:48:08, 5 December 2024)
- ML20212B961 + (12:48:09, 5 December 2024)
- TXX-6162, Advises That Text Revs Contained in FSAR Amend 61 Unchanged Except for Listed Changes on Pages 3.9B-4 & 17.1-32 Re Small Steam Line & Large High Energy Line + (12:48:10, 5 December 2024)
- ML20212B958 + (12:48:10, 5 December 2024)
- ML20212B956 + (12:48:11, 5 December 2024)
- ML20212B954 + (12:48:12, 5 December 2024)
- NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With + (12:48:13, 5 December 2024)
- 05000336/LER-1997-033-02, :on 970727,design Deficiencies Were Identified W/Esas Actuation Cabinet Power Supplies & Associated Fuses. Cause Under Investigation.Event Review Team Was Established to Investigate Cause of Design Deficiencies + (12:48:16, 5 December 2024)
- ML20212B951 + (12:48:17, 5 December 2024)
- ML20212B949 + (12:48:18, 5 December 2024)