Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212C468 + (11:45:32, 4 December 2024)
- ML20212C466 + (11:45:33, 4 December 2024)
- ML20212C462 + (11:45:37, 4 December 2024)
- ML20212C460 + (11:45:38, 4 December 2024)
- W3P87-0556, Forwards Response to NRC 870129 Enforcement Action Ltr EA-86-193 Re Violations Noted in Insp Repts 50-382/86-14 & 50-382/86-23.W/o Encl + (11:45:38, 4 December 2024)
- ML20212C458 + (11:45:39, 4 December 2024)
- ML20212C457 + (11:45:40, 4 December 2024)
- ML20212C449 + (11:45:42, 4 December 2024)
- ML20212C450 + (11:45:42, 4 December 2024)
- ML20212C448 + (11:45:43, 4 December 2024)
- ML20212C445 + (11:45:44, 4 December 2024)
- 05000352/LER-1986-035, :on 860707,channel Functional Surveillance Tests for intermediate-range Monitors Overdue.Caused by Procedural Inadequacies.General Procedures GP-3 & GP-4 Revised + (11:45:45, 4 December 2024)
- ML20212C441 + (11:45:46, 4 December 2024)
- ML20212C439 + (11:45:47, 4 December 2024)
- ML20212C437 + (11:45:49, 4 December 2024)
- ML20212C436 + (11:45:50, 4 December 2024)
- ML20212C433 + (11:45:51, 4 December 2024)
- ML20212C435 + (11:45:51, 4 December 2024)
- ML20212C430 + (11:45:52, 4 December 2024)
- ML20212C429 + (11:45:53, 4 December 2024)
- A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station + (11:45:57, 4 December 2024)
- ML20212C424 + (11:45:57, 4 December 2024)
- ML20212C422 + (11:45:58, 4 December 2024)
- ML20212C419 + (11:45:59, 4 December 2024)
- ML20212C420 + (11:45:59, 4 December 2024)
- ML20212C418 + (11:46:00, 4 December 2024)
- ML20212C414 + (11:46:01, 4 December 2024)
- ML20212C415 + (11:46:01, 4 December 2024)
- ML20212C412 + (11:46:04, 4 December 2024)
- ML20212C410 + (11:46:05, 4 December 2024)
- 05000413/LER-1986-058, :on 861111,overtemp Delta T Reactor Trip Occurred on Increasing Reactor Coolant Temp Rate.Caused by Personnel Error in Adjusting Potentiometers Used in Test of Resistance Temp Devices.Main Feedwater Reset + (11:46:06, 4 December 2024)
- ML20212C408 + (11:46:07, 4 December 2024)
- 05000369/LER-1986-020-03, :on 861028,charging Line Outside Containment Isolation Valves Declared Inoperable Due to Incorrect Torque Settings on Rotork Motor Operators.Caused by Mfg Deficiency. Procedures Revised & Operators Evaluated + (11:46:15, 4 December 2024)
- ML20212C399 + (11:46:17, 4 December 2024)
- 05000302/LER-1986-009, :on 860629,reactor Containment Isolation Design Basis Violated.Caused by Failure to Update Procedure OP-417 W/Necessary Administrative controls.Short-term Instruction 86-35 Issued on 860630 + (11:46:18, 4 December 2024)
- 05000331/LER-1986-024, :on 861121,HPCI Sys Isolation Valve Closed Due to Signal from HPCI Steam Line High Flow Pressure Differential Indicating Switch PDIS2245.Caused by Moisture Shorting Out Terminals in Switch + (11:46:20, 4 December 2024)
- ML20212C395 + (11:46:21, 4 December 2024)
- ML20212C394 + (11:46:21, 4 December 2024)
- ML20212C393 + (11:46:22, 4 December 2024)
- ML20212C392 + (11:46:22, 4 December 2024)
- ML20212C390 + (11:46:23, 4 December 2024)
- ML20212C388 + (11:46:24, 4 December 2024)
- TXX-6262, Forwards Revised Response to 860502 Notice of Violation,Due to Inability to Achieve Completion Schedules + (11:46:24, 4 December 2024)
- ML20212C387 + (11:46:25, 4 December 2024)
- ML20212C381 + (11:46:26, 4 December 2024)
- ML20212C384 + (11:46:26, 4 December 2024)
- ML20212C380 + (11:46:27, 4 December 2024)
- ML20212C375 + (11:46:28, 4 December 2024)
- ML20212C377 + (11:46:28, 4 December 2024)
- ML20212C372 + (11:46:29, 4 December 2024)
- ML20212C374 + (11:46:29, 4 December 2024)
- ML20212C371 + (11:46:30, 4 December 2024)