October 15,1997 SNC 97-102 hir. Dennis Reid, Project hianager Spent Fuel Licensing Section Spent Fuel Project Office l
Oliice of Nuclear hiaterial Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
- 1) Proprietary drawings and calculations for the TranStor Shipping Cask System Safety Analysis Report - Revision 3
- 2) Impact Limiter Drop Test Plan
References:
- 1) Docket No. 71-9268
- 2) TAC No. L22232, hiarch 24,1997
Dear hir. Reid:
Enclosed please find fifteen (15) copies of the proprietary impact Limiter Drop Test Plan. This plan outlines a series of scale-model tests intended to show that the limiters will perform as predicted by the analysis. SNC would like to obtain the stafTs approval before proceeding with the test program.
Also enclosed are fifteen (15) copies of the TranStorm Shipping Cask System proprietary drawings and four (4) copies of the proprietary supporting calculations for the TranStorm Shipping Cask System design. These drawings and calculations reflect the impact limiter modification SNC decided to make after consulting with the aluminum honeycomb vendor
)
l (llexcel). Revis. ion 3 of the TranStorm Shipping Cask System SAR was submitted under r
separate cover.
/g)
It is requested that the NRC withhold the enclosed proprietary information from public l
disclosure in accordance with the provisions of 10 CFR 2.790. The attached afildavit provides l
Sierra Nuclear's reasons for requesting that the information be withheld.
(p.6/l hib}((' Of Y0 Please let us know if you need any additioni
.mation to complete your review of the O
pg) f p TranStorm Shipping Cask System SAR.
gf g) 9710290218 971015 dM PDR ADOCK 07109268 O'
C PDR
'1 Vi&Ir Sq'uare Scotts Valley, California 95066 (408)438-6444 Fax (408) 438-5206
l'Y The following are enclosed:
15 copics of the drawings IL-001, TranStor" System Impact Limiter Assembly,-
Rev.3 15 copies of the drawings SPA-001, TranStor System Package Assembly, j
e Rev.3 l.
4 copies of the design calculation BNFL01.10.06.01, Weight and C.O.
Calculation, Rev. 3 4 copies of the design calculation BNFL01.10.06.02, impact Limiter Analysis, e-Rev.3
- 4 copics of design calculation BNFL01.10.06.60, Dynamic Load Factor for the TranStor Cask Drop, Rev. 2
{
15 copies ofIL-TP-001, TranStorm Quarter Scale Model Impact Limiter Test Plan, Rev. 0 1
Very truly yours, SM ms Thomas J. @ inner Vice President, Operations cc: Mr. Dan Olldow-PGE Mr. Ray Pate - POE m
a, AFFIDAVIT IN SUPPORT OF PROPRIETARY INFORMATION CDNTAINED IN TIIE DRAWINGS AND CALCULATIONS FOR Tile TranSter SillPPING CASK SYSTEM State of Califomia, County of. Santa Cruz Thomas J. Wenner, (Affiant), Vice President, Operations, of Sicira Nuclear Corporation, hereafter referred to as SNC, at i Victor Square, Scotts Valley, CA,95066, being duly sworn, deposes and says. hat:
1.
Affiant is personally familiar with the trade nerets and privileged information contained in the following documents:
Drawings IL-001, TranStor System Impact Limiter Assembly, Sheets 1 and 2 Drawings SPA-001, TranStorm System Package Assembly, Sheets 1 and 2 Design calculation BNFLO 10.06.01, Weight and C.G. Calculation Design calculation BNFLO 10.06.02, Impact Limiter Analysis Design calculation BNFLO.10.06.60, Dynamic Load Factor for the TranStorm Cask Drop Document IL-TP-001, TranStor Quarter Scale Model Irrpact Limiter Test Plan Affiant is also personally familiar with the calculations and drawings of the TranStor*
Shipping Cask System, provided as a supplement to Revision 3 of the Safety Analysis Report (SAR) for the TranStor* Shipping Cask System. (Attachment A provides a current listing of the subject calculations and Attachment B provides a current listing of the subject drawings).
AfTiant requests that the Nuclen Regulatory Commission, pursuant to Chapter 10 of the Code of Federal Regulations, part 2.790 (10CFR2.790)
"Public Inspections, Exemptions, Request for Withholding", withhold the information contained within the drawings, hereafter referred to as the Proprietary Material, from public disclosure.
2.
This information has been and is held in confidence by SNC'.
3.
The infonnation contained witlan the proprietary material is calculated data, results of design calculations and. components design dctails and critical dimensions which were developed by SNC. This type ofinformation is normally held in confidence by those who im est time and money in its development.
l l
i
a.
T AFFIDAVIT IN SUPPORT OF PROPRIETARY INFORMATION CONTAINED IN TIIE DRAWINGS AND CALCULATIONS FOR TIIE TranStorm SillPPING CASK SYSTEM 4.
The Proprietary Material is transmitted to the Nuclear Regtilatory Commission in confidence.
5.
'lhe information which is being claimed as trade secrets and privileged infonnation is not available in public sourecs.
6.
SNC has invested a considerable amount of time, engineering labor, and money in the development of the information. Public disclosure of this information would cause substantial harm to SNC's competitive position. Others, seeking to design similar shipping cask systems, would have to make similar investments to develop the information on their own as long as the information is r.ot disclosed to the public.
1
/ las Thomas J. Wemwr Vice President, Operations Sierra Nuclear Corporation Subscribed and sworn to before me this day of /6T4 de^ /197
),$$gfffU MS$b.
b JA E.
mm rueuc.cautomiA @
Notary Public in and for
}
u cYtN'E.l.m the County of Santa Cruz, v
State of Califernia day of7/N. h/
My commission expires the 2
1%
LIST OF SUPPORTING CALCULATIONS Attachmnt A FOR SAFETY ANALYSIS REPORT FOR TIIE TranStor* SHIPPING CASK SYSTEM (Revision 3) l (Margin Bars Indicate Revisions l'ecluded with this Submittal SNC-97-102) i Calculation Calculation Title Revision Number BNFLI.10.06.01 Weight and C. G. Calculation 3
l BNFLI.10.06.02 Impact Limiter Analysis 3
l BNFLI.10.06.03 TranStor Closure Od Analysis 1
BNF LI.10.06.04 TranStor* Shipping Cask Closure Lid Bolts 2
BNFLI.10.06.0) -
TranStor* Shipping Cask Containment Analysis (PWR) 3 BNFLI.10.co.06 TranStor Shipping Cask Containment Analysis (BWR) 3 BNFLI.0.06.07 TranStor* PWR Basket Accident and Normal Pressure Analysis 3
BNFLI.10.06.08 TranStor* BWR Basket Accident and Normal Pressure Analysis 4
BNFL1.10.06.09 Lead Slump Analysis 1
BNFLI.10.06.10 TranStor Basket Litling Devices 1
BNFLI.10.06.l l TranStor Lid LlRing Devices 0
BNFLI.10.06.12 Transtor Side Puncture 0
BNFLI.10.06.13 TranStor* Bottom Plate Analysis 1
BNFLI.10.06.14 TranStor* PWR Criticality Analysis 3
BNFLI.10.06.15 TranStor* BWR Criticality Analysis 2
~~
BNFLI.10.06.16 Benchmark Calculations and Validation of the SCALE 4.1 Code Package 0
(PC Version) for Analysis of Cask Systems With liighly Enriched Fresh (Non-Proprietary)
Fuel, Fixed Poisons, and Unborated Water BNFLI.10.06.17 O-Ring Specs. for Lid, Drain, Vent & :st Port 2
BNFLI.10.06.21 TranStor PWR Basket Thermal Analysis i
BNFLI.10.06.22 TranStor Shipping Cask Thermal Analysis 1
DNFLI.10.06.24 Neutron Shield Shell Analysis 3
BNFLI.10.06.25 Lead Pour Analysis O
BNFLI.10.06.26 Lifting Trunnion Analysis 0
BNFLI.10.06.27 TranStor" Top Forging 0
BNFLI.10.06.28 Rotation Trunnion Analysis 1
BNFLI.10.06.29 Tiedown Devices 1
BNFLI.10.06.30 Impact Limiter Attachments 2
BNFLI.10.06.32 TranStor Shipping Cask Lifting Yoke 0
BNFLI.10.06.34 PWR Basket 30-Ft. Drop Analysis 1
BNFLI.10.06.35 TranStor* PWR Basket Most Reactive Canister Analysis 1
BNFLI.10.06.36 TranStor Shipping Cask Cavity Spacer 0
BNFLI.10.06.37 Port Covers
')
~
BNFLI.10.06.39 TranStor* PWR Basket One Foot Drop 1 l
\\\\SNC.NT SERVER \\SNCFILES\\ LICENSE \\SARS\\BNFL\\BNFL-P71\\CALCLIFT.lL-10-97. DOC l
LIST OF SUPPORTING CALCULATIONS Att:chmeat A FOR SAFETY ANALYSIS REPORT FOR TIIE TranStor" SIIIPPING CASK SYSTEM (Revision 3) l Calculation Calculation Title Revision Number BNFLI.10.06.40 TranStor Shipping Cask ANSYS Structural Analysis 1
BNFLI.10.06.41 TranStor Shipping Casx immersion i
BNFL1.10.06.43 MPB BWR Structural Analysis 30-fl Side Drop Accider t Conditions 0
BNFLI.10 06.44 MPB-BWR Structural Analysis-I fl. Drop Accident Conditiors O
BNFL!.10.06 45
'4PB-BWR Structural Analysis Pressure Conditions 0
BNFLI.10.06.46
~MPB-BWR Structural Analysis fl. End Drop i
BNFLI.10.06.47 MPB-BWR Structural Analysis Thermalconditions 0
BNFLI.10.06.48 TranStor BWR Basket Thermal Analysis l
BNFLI.10 '6.50 Shiciding Analyses for the TranStor Shipping Cask 2
BNFLI.10.06.51 Transtor Cradle 1
BNFLI.10.06.52 inner Shell Buckling Analysis 2
~
BNFLI.10.06 53 PWR Transtor Basket Thermal Stress Analysis 1
BNFLI.10.06.54 Natron Shield Expansion 1
BNFLI.10.06 55 Effective Thermal Conductivity of BWR Fuel Region 0
BNFLI.10.06.57 Transtor Yoke Brittle Fracture 0
BNFLI.10.06.60 Dynamic Load Factor for the Transtor Cask Drop 2
l BNFLI.10.06.61 COMBINED WITH BNFLI.10.06.04 BNFL t.10.06.62 T$p Forging 0-ring In:erface During Lih 0
BNFL t.10.06.63 Evaluation of the Slapdown Effect During the Cask Drop i
BNFLI.10.06.64 Stainless Steel Clad Fuel Thermal Analysis 0
BNFLI.10.06.65 Tiedown Reactions 0
BNFLI.10.06.66 TranStor MOX FuelCriticality Analysis 0
BNFLI.10.06.67 SCALE 4.3 CSAS25 Code Sequence Validation for MOX Fuel O
Criticality Analysis BNFLI.10.06.68 TranStor Shielding Analysis Using A Detailed Basket Interior Model 0
BNFLI.10.06.69 Sub-Critical Neutron Multiplication for Dry TranStor Baskets O
Containing Burned PWR and BWR Fuel BNFLI.10.06.70 ORIGEN S Gamma and Neutron Source Term 0
Calculations for Zircaloy and Stainless Steel Clad Fuel BNFLI.10.06.71 Effects of Basket Interior Density and Elemental Composition on Cask 0
Exterior Gamma Dose Rates CCV-1.1.4.1 SCALE-4.3 CSAS25 Code Sequence Verification 0
TSLl.10.06.69 Structural Evaluation of the PWR and BWR Failed Fuel and 0
Fuel Debris Cans PGE l.10.02.05.07 Fuel Debris and Filter Process Can Capsule Evaluation 0 l
\\\\SNCRSERVER\\SNCFILES\\ LICENSE \\SARS\\BNFL\\BNFL-P71\\CALCLIST 10-10-97. DOC l
LIST OF SUPPORTING DRAWINGS Attachment H FOR SAFETY ANALYSIS REPORT FOR THE TranStor SHIPPING CASK SYSTEM (Revision 3) l (Margin Bars Indicate Revisions included with this Submittal SNC-97-102)
DESIGN DRAWINGS Drawing #
Submitted to NRC Rev TranStor TSP-001 9/13/96 (SNC-96-090) 1 PWR Basket Assembly SH.1/3 7G97 (SNC 97-064) 3 i
TranStor TSP-001 9/13/96 (SNC-96-090) 1 PWR Basket Assembly SH. 2/3 7/2/97 (SNC-97-064) 2 TranStor*
TSP-001 9/13/96 (SNC-96-090) 1 PWR Basket Assembly SH. 3/3 7/2/97 (SNC 97-064) 3 TranStor TSP-002 9/13/96 (SNC-96-090) 1 PWR Shell Assembly SH.1/2 7/2/97 (SNC-97-064) 3 TranStor TSP-002 9/13/96 (SNC-96-090) 1 PWR Shell Assembly SH. 2/2 7/2/97 (SNC-97-064) 2 TranStor TSP-003 9/13/96 (SNC 96-090) 1 PWR Shield Lid Assembly SH.1/1 7/2/97 (SNC 97-064) 3 TranStor" TSP-004 9/13/96 (SNC-96-090) 1 PWR Structural Lid Assembly SH.1/1 7/2.'s7 (SNC-97 064) 2 TranStor TSP-005 9/13/96 (SNC-96-090) 1 PWR Main Cross Assembly SH.1/1 7/2/97 (SNC 97-064) 3 Transtor TSP-006A,B,C 9/13/96 (SNC-96-090) 1 PWR Double Cell Assembly SH.1/2 7/2/97 (SNC-97-064) 3 Transtor TSP-906A,B,C 9/13/96 (SNC-96-090) 1 PWR Double Cell Assembly SH. 2/2 7/2/97 (SNC-97-064) 2 TranStor TSP-007A,B,C 9/13/96 (SNC-96-090) 1 PWR Inner Cell Assembly SH.1/1 7/2/97 (SNC-97 064) 3 TranStor TSP-008 9/13/96 (SNC-96-090) 1 PWR Poison Sheet Clip Attachments SH.1/1 7/2/97 (SNC-97-064) 2 Transtor TSP-009 9/13/96 (SNC-96-090) i PWR Poison Sheets SH.1/3 7/2/97 (SNC-97-064) 2 i
TranStor TSP-009 9/13/96 (SNC-96-090)
I PWR Poison Sheets SH. 2/3 7/2/97 (SNC-97 064) 2 l TanStor TSP-009 9/13/96 (SNC-96-090) 1 PWR Poison Sheets SH. 3/3 7/2/97 (SNC 97-064) 2 TranStor TSP-010A,B 9/13/96 (SNC-96-090) 1 PWR Corner Cell Assembly SH.1/2 7/2/97 (SNC-97-064) 3 TranStor TSP-010A,B 9/13/96 (SNC-96-090) 1 PWR Corner Cell Assembly SH. 2/2 7/2/97 (SNC-97 064) 2 TranStor TSP-011 9/13/96 (SNC-96-090) 1 PWR Basket Nameplate SH.1/1 (Non-proprietary) 4/24/97 (SNC-97-039) 1 7/2/97 (SNC-97-062) 3 TranStor* Inner Cell Go/No-Go Gage TSP-012 7/2/97 (SNC-97-064) 0 for Storage Sleeve SH.1/1 TranStor* Corner Cell GaWGo Gage for Storage TSP-013 7/2/97 (St 'C-97-064)
O Sleeve SH.1/1 l
\\\\SNC_NT.SE RVE R\\SNC FILES \\ LICE NSE\\SARS\\BN F L\\71 DWG LST.RV4-10-97. DOC l
c i.
. LIST OF SUPPORTING DRAWINGS Attachment B FOR SAFETY ANALYSIS REPORT FOR TIIE TranStor SillPPING CASK SYSTEM (Revision 3) l (Margin Bars indicate Revisions Included with this Submittal SNC-97-102)
DESIGN DRAWINGS Drawing #
Submitted to NRC Rev Transtor TSB-001 9/13/96(SNC 96-090) i BWR Basket Assembly Sil.1/6 7/2/97 (SNC-97-064) 2 TranStor TSB-001 9/13/96 (SNC-96-090) 1 BWR Basket Assembly SH. 2/6 7/2/97 (SNC-97-064) 2 TranStor TSB-001 9/13/96 (SNC 96-090) 1 BWR Basket Assembly SH. 3/6 7/2/97 (SNC-97-064) 2 Transtor TSB-001 9/13/96 (SNC-96-090) 1 BWR Basket Assembly Sil.4/6 7/2/97 (SNC-97-064) 2 1 u Stor TSB-001 7/2/97 (SNC-97-064) 2 BM 3 Basket Assembly SH. 5/6 Transtor TSB-001 7/2/97 (SNC-97-064) 2 BWR Basket Assembly SH. 5/6 TranStor TSB-002 9/13/96(SNC 96-090) 1 BWR Basket Shell Assembly SH.1/2 7/2/97 (SNC-97-064) 2 TranStor TSB-002 9/13/96 (SNC-96-090) i BWR Basket Shell Assembly SH. 2/2 7/2/97 (SNC-97 064) 2 Transtor TSB-003 9/13/96 (SNC-96-090) i BWR Shield Lid Assembly SH. l/l 7/2/97 (SNC-97-064) 2 TranStor*
TSB-004 9/13/96 (SNC-96-090) 1 BWR Strunarc!! id Assembly SH.1/1 7/2/97 (SNC-97-064) 2 Transtor*
TSB-005 9/13/96(SNC 96-090) 1 BWR Cell Assembly #1 SH.1/1 7/2/97 (SNC-97-064) 2 TranStor*
TSB-006 9/13/96 (SNC 96-090) i BWR Cell Assembly #4 SH.1/1 7/2/97 (SNC-97-064) 2 TranStor TSB-007 9/13/96 (SNC-96-090) l BWR Spacer 2 Assembly SH. I/1 7/2/97 (SNC-97-064) 2 TranStor*
TSB-008 9/13/96 (SNC-96-090) 1 BWR Spacer i Assembly SH.1/1 7/2/97 (SNC-97-064) 2 TranStor*
TSB-009 9/13/96 (SNC-96-090) 1 BWR Cell Assembly #2 SH.1/1 7/2/97 (SNC-97 064) 2 Transtor TSB-010 9/13/96 (SNC-96-090) i BWR Cell Assembly #3 SH.1/I 7/2/97 (SNC-97 064) 2 TranStor TSB-011 9/13/96 (SNC-96-390) 1 BWR Basket Nameplate Sil.1/1 (Non-proprietary) 4/24/97 (SNC-97-039) 1 7/2/97 (SNC-97-062) 2 TrenStor TSB-012 9/13/96 (SNC-96-090) i Borated Aluminum Details SH.1/2 7/2/97 (SNC-97-064) 2 TranStor*
TSB-012 9/I 3/96 (SNC-96-090) 1 l Borated Aluminum Details SH. 2/2 7/2/97 (SNC-97-064) 2 TranStor* BWR Go/No-Go Gage TSB-013 7/2/97 (SNC 97-064) 0 for Storage Sleeve SH.1/1
_ l
\\\\SNC_NT_ SERVER \\SNCFILES\\ LICENSE \\SARS\\BNFL\\71DWGLST.RV4-10 97. DOC l
LIST OF SUPPORTING DRAWINGS Attachment B FOR SAFETY ANALYSIS REPORT FOR Tile TranStor SillPPING CASK SYSTEM (Revision 3) l (Margin Bars Indicate Revisions Included with this Submittal SNC-97-102)
DESIGN DRAWINGS Drawing #
l Submitted to NRC Rev TranStor Shipping Cask Assembly CA-001 9/13/96 (SNC 96-090) 1 SI1. 1/3 7/2/97 (SNC 97-064) 2 Transtor ShippingCask Assembly CA-001 9/13/96 (SNC 96-090) i SH. 2/3 7/2/97 (SNC-97-064) 2 TranStor Shipping Cask Assembly CA-001 9/13/96 (SNC-96-090) 1 Si1. 3/3 7/2/97 (SNC-97-064) 2 Transtor" Shipping Cask CA 002 9/13/96 (SNC-96-090) 1 Outer Shell Assembly SH. 1/1 7/2/97 (SNC-97-064) 2 Transtor Shipping Cask CA-003 9/13/96 (SNC 96-090) 1 Inner Shell SH. lil 1/2/97 (SNC-97-064) 2 Transtor Shipping Cask CA 004 9/13/96 (SNC-96-090) 1 Top Forging Assembly SH.1/t
' 7/2/97 (SNC-97 064) 2 TranStor 3 hipping Cask CA 005 9/13/96 (SNC 96-090) 1 Closure Lid Assembly SH.1/1 7/2/97 (SNC-97-064) 2 Transtor Shipping Cask CA-006 9/13/96(SNC 96-090) 1 Bottom Forging Plate SH.1/1 7/2/97 (SNC 97-064) 2 TranS:or Shipping Cask CA 007 9/13'96 (SNC 96-090) 1 Outer Bottom Forging SH.1/1 7/2/97 (SNC-97-064) 2 j
TranStor Shipping Cask CA 008 9/13/96 (SNC-96-090; I
Lifting Trunnion SH.1/1 7/2/97 (SNC-97-064) 2 TranStor" Shipping thsk CA 009 9/13/96 (SNC-96-090) 1 Rotation Trunnion SH.1/1 7/2/97 (SNC-97 064) 1 TranStor Shipping Cask CA 010 9/13/96(SNC 96-090) 1 Shear Key Plug Assembly SH.1/1 7/2/97 (SNC 97-064) 2 TranStor* Shipping Cask CA-011 9/13/96 (SNC-96-090) 1 Port Cover Assembly-SH.1/1 7/2/97 (SNC 97-064) 2 i
Transtor Shipping Cask CA-012 9/13/96 (SNC-96-090) l Closun ' :d SH. I/2 7/2/97 (SNC-97-064) 2 TranStor Shipping Cask CA-012 9/13/96 (SNC 96-090) 1 Closure Lid SH. 2/2 7/2/97 (SNC 97-064) 2 Transtor* Shipping Cask CA 013 9/I3/96 (SNC-96-090) 1 Nameplates SH.1/1 (Non-Proprietary) 7/2/97 (SNC-97 062) 2 TranStor System IL-001 9/13/96 (SNC-96-090)
I impact Linnter Assembly SH.1/2 7/2/97 (SNC-97-064) 2 10/10/97(SNC-97 ???)
3 TranStor" System IL-001 9/13/96 (SNC-96-090)
I impact Limiter Assembly SH. 2/2 7/2/97 (SNC-97-064) 2 10/10/97 (SNC 97-?77) 3 TranStor System SP-001 9/13/96 (SNC-96-090) 0 Cavity Spacer SH.1/1 l
%SNCJIT_S ERVE R\\SN CFILE S\\ LICE N S E\\S ARS\\BN F L\\71 DWGL ST.RV4-10-97. DOC l
I LIST OF SUPPORTING DRAWINGS Attachment B FOR 4
SAFETY ANALYSIS REPORT FOR TIIE TranStor SHIPPING CASK SYSTEM (Revision 3) l (Margin Bars Indicate Revisions included with this Submittai SNC-97-102)
DESIGN DRAWINGS Drawing #
Submitted to NRC Rev Personnelifarrier Assembly PB-001 9/13/96 (SNC-96-090) 0 Sil.1/3 7/2/97 (SNC 97 064) 1 Personnel Barrier Assembly PB-001 9/13/96 (SNC 96-090) 0 SH. 2/3 7/2/97 (SNC-97 064)
I i
Personnel Barrier Assembly PB-001 9/13/96 (SNC-96-090) 0 SH. 3/3 7/2/97 (SNC-97-064)
I Cradle Assembly SCA 001 9/13/96 (SNC-96-090)
O SH.1/3 Cradle Assembly SCA 001 9/13/96 (SNC-96-090) 0 SH. 2/3 Cradle Assembly SCA 001 9/13'/96 (SNC-96-090) 0 SH. 2/3 Part Details of Cradla Assemb!y SCA 002 9/13/96 (SNC 96-090) 0 SH.1/1 Transtor" System Package Assembly SPA-001 9/13/96 (SNC-96-090) 1 SH,1/2 7/2/97 (SNC-97-064) 2 10/I0/97 (SNC 97 ???)
3 TranStor System Package Assembly SPA-001 9/13/96 (SNC-96-090) 1 SH. 2/2 7/2/97 (SNC-97-064) 2 10!10/97 (SNC 97 777) 3 BWR Fuel Debris Can TBD-001 6/11/96 (Pt. 72)(SNC 96-066)
O SH.1/2 11/20/96 (Pt. 7I)(SNC-96-103)
BWR Fuel Debris Can TBD-001 6/11/96 (Pt. 72)(SNC 96-066)
O SH. 2/2 1I/20/96 (Pt. 71)(SNC 96-103)
BWR Failed Fuel Can Assembly TBF-001 6/lI/96 (Pt. 72)(SNC 96-066)
O SH.1/1 II/20/96 (Pt. 71)(SNC-96-103)
BWR Failed Fuel Can Shell Assembly TBF-002 6/1 I/96 (Pt. 72)(SNC-96-066) 0 SH. I/I i1/20/96 (Pt. 7I)(SNC-96-103)
BWR Failed Fuel Can Lid Assembly TBF-003 6/11/96 (Pt. 72)(SNC-96-066) 0 SH.1/1 II/20/96 (Pt. 71)(SNC-96-103)
PWR Fuel Debris Can TPD-001 6/lI/96 (Pt. 72)(SMC 96-066)
O SH.1/2 11/20/96 (Pt. 71)(SNC 96-103)
PWR Fuel Debris Can TPD-001 6/11/96 (Pt. 72)(SNC-96-066) 0 SH. 2/2 11/20/96 (Pt. 7I)(SNC-96-103)
PWR Failed Fuel Can Assembly TPF 001 6/I 1/96 (Pt. 72) (SNC-96-066) 0 SH.1/1 II/20/96 (Pt. 71)(SNC 96-103)
PWR Failed Fuel Can Shell Assembly TPF-002 6/11/96 (Pt. 72)(SNC-96-066)
O SH. I/1 1 I/20/96 (Pt. 71) (SNC-96-103)
PWR Failed Fuel Can Lid Assembly TPF-003 6/11/96 (Pt. 72)(SNC-96-066) 0 SH.1/1 I I/20/96 (Pt. 71)(SNC-96-103) l
\\\\SNC_NT_S E RVE R\\SNCFILE S\\LIC E N SE\\SARS\\BNFL\\71 DWGLST.RV4-10-97. DOC l
- o a<-
LIST OF SUPPORTING DRAWINGS Attachment B FOR 4
SAFETY ANALYSIS REPORT FOR THE TranStor SHIPPING CASK SYSTEM (Revision 3) l (Margin Bars Indicate Revisions Included with this Submittal SNC-97-102)
DESIGN DRAWINGS Drawing #
Submitted to NRC Rev i
Process Can, Filter Media Processing System TPJ M 5-04 11/20/96 (Pt. 7I)(SNC-96-110) 0 (Scientific Ecology Group Drawing)
Sil.1/3 (non-proprietary)
Process Can, Filter Media Processing System TRJ M 5-04 1I/20/96 (Pt. 71)(SNC 96110) 0 (Scientific Ecology Group Drawing)
Sil. 2/3 (non-proprietary)
Process Can, Filter Media itocessing System TRJ M-5-04 11/20/96 (Pt. 71)(SNC 96110) 0 (Scientific Ecology Group Drawing)
SH. 3/3 (non-proprietary)
Process Can Capsule, Filter Media Processing TRJ M 5-013 I I/20/96 (Pt. 71)(SNC-96-110) 0 System (Scientific Ecology Group Drawing)
SH.1/2 (non-proprietary)
Process Can Capsule, Filter Media Processing TRJ M-5-013 11/20/96 (Pt. 71)(SNC-96-110) 0 System (Scientific Ecciogy Group Drawing)
SH. 2/2 (non-proprietary)
GTCC Basket Assembly PG B-001 3/26/96 (72 17)(VPN-03196) 0 SH.1/2 11/20/96 (Pt. 7I)(SNC 96-103)
GTCC Basket Assembly PGB-001 3/26/96 (72-17)(VPN-03196) 0 S11.2/2 11/20/96 (Pt. 71)(SNC-96-103)
GTCC Basket Shell and Structural Plates PGB-002 3/26/96 (7217)(VPN-03196) 0 SH.1/2 11/20/96 (Pt. 71)(SNC-96-103)
GTCC Basket Shell and Structural Plates PGB-002 3/26/96 (7217)(VPN-03196)-
0 SH. 2/2 11/20/96 (Pt. 71)(SNC 96-103)
GTCC Basket Lid Assembly PGB-003 3/26/96 (7217)(VPN-03196) 0 Sil.I/I II/20/96 (Pt. 71)(SNC-96-103)
GTCC Inner Basket Asambly PGB-004 3/26/96 (7217)(VPN-03196) 0 SH.1/1 11/20/96 (Pt. 71)(SNC-96-103)
GTCC Basket Name Plate PGB-005 3/26/96 (7217)(VPN-03196) 0 SH.1/1 11/20/96 (Pt. 71)(SNC-96-103)
(Non proprietary) 4/24/97(SNC-97 039)
< I
\\\\SNC_,NT.SE8tVER\\SNCFILES\\ LICENSE \\SARS\\BNFL\\71DWGLST.RV4-10-97 DOC l