ML20212C372
| ML20212C372 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/21/1997 |
| From: | Thomas K NRC (Affiliation Not Assigned) |
| To: | Maynard O WOLF CREEK NUCLEAR OPERATING CORP. |
| References | |
| NUDOCS 9710290207 | |
| Download: ML20212C372 (3) | |
Text
_ -_-________ _ __ _
47&- yt2 t,
p aso UNITED STATES y
o u
NUCLEAR REGULATORY COMMISSION
- g WA?HINGTON. O.C, 3000H001
%f*.**
October 21, 1997 i
1 i
l Mr. Otto L. Maynard President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, Kansas 66839
SUBJECT:
WOLF CREEK GENERATING STATION DESIGN INSPECTION
Dear Mr. Maynard:
The purpose of this letter is to inform you of the Nuclear Regulatory Commission's plans to conduct a design inspection of the Wolf Creek Generating Station. We have scheduled the on-site inspection for the weeks of November 17 throu through 19, 1997:gh 21, 1997: December 1 through 5, 1997; December 15 and January 5 through 9. 1998.
Your staff has indicated that there are no major conflicts with on-site activities during these Jeriods. The NRC team leader and two team members will visit the site between October 27 and October 29. 1997, to review administrative aspects of the inspection and to collect documentation necessary for in-office review and on-site inspection, Recent NRC inspections at nuclear power reactor facilities have identified numerous findings where the plant configuration or operations were inconsistent with the design basis, licensing basis, or the updated safety analysis report (USAR). Therefore, the NRC has decided to perform design inspections at nuclear power reactor facilities utilizing Inspection Procedure (IP) 93801. " Safety System Functional Inspection." The two mechanical systems 9
selected for inspection are the Residual Heat Removal System and Component Cooling Water S stem.
In addition. support and interface systems will be
{p reviewed as wel as the electrical distribution system.
Mr. Roy Mathew. Team Leader. NRR, will interface with you and your staff regarding all matters related to this inspection. The ins)ection will be
>erfornied by NRC personnel and engineers from Sargent and. undy (S&L) who have
>een contracted by the NRC for this purpose.
Mr. Kurt Neubauer of S&L will be the lead contractor engineer, w% m u.a. ggpy us ll! l!ll:
lllGijl!!
9710290207 971021 PDR ADOCK 05000482 G
t.:
i*
- M_r.) Otto L. Maynard :
October 21. 1997 a
-We will be in c' ntact with your staff regarding additional details. for the -
o inspection.
Should you have any questions, please contact Mr Mathew at (301).415-2965 or myself at (301) 415-1362.
4 Sincerely, l
1
.L Original Signed By Kristine M. Thomas, Project Manager Project Directorate IV-2 l
i Division of Reactor Projects - III/IV.
1 o
Office of Nuclear Reactor Regulation _
l q
- Docket No. 50-482
)lSTR [Blf"0N -
(
4 tDieg-cc: -See next page PUB PDIV-2 Reading EGA1 1
-WJohnson. RIV i
JRoe, DRPM-WBateman KThomas EPeyton LHurley, RIV o
}--
AHowell. RIV RMathew, PECB OGC, 015B18 GHill (2)
CGrimes. 011E22 ACRS JKilcrease, RIV SRichards. PECB DNorkin~ PECB DOCUMENT NAME: 'WCAE.LTR 0FC PDIV-2/PM PDIV-2/LA PECB.
PECB/g&_- /
NAME KTh N EPhan
= t98F DPNehb DATE 10/l'/97 10/t5/97 10/ M 97 10M/97 1
0FFICIAL RECORD COPY t
L*..
Mr. Otto L. Maynard October 21, 1997 CC:
Jay Silberg. Esq.
Chief Operating Officer-Shaw, Pittman, Potts & Trowbridge Wolf Creek Nuclear Operating Corporation 2300 N. Street, NW-P. O. Box 411 Washington. D.C.
20037 Burlington, Kansas 66839
- Regional Administrator, Region IV Supervisor Licensing U.S. Nuclear Regulatory Comission Wolf Creek Nuclear Operating Corporation 611-Ryan Plaza Drive. Suite 1000 P.O. Box 411
-Arlington, Texas 76011 Burlington, Kansas 66839 Senior Resident inspector U.S. Nuclear Regulatory Comission
.U.S. Nuclear Regulatory Commission Resident Inspectors Office 4
P. O, Box 311 8201 NRC Road l
Burlington. Kansas 66839 Steedman, Missouri 65077-10',?
i-l Chief Engineer Utilities Division Kansas Corporation Commission 1S00 SW Arrowhead Road L
Topeka, Kansas 66604-4027 l
l Office of the Governor l
State of Kansas l-Topeka, Kansas 66612 Attorney General Judicial Center 301 S.W. 10th.
2nd Floor Topeka, Kansas 66612
[
, County Clerk Coffey County Courthouse f--
Burlington, Kansas 66839 Vick L. Cooper Chief Radiation Control Pronram -
Kansas Department of flealth and Environment Bureau of Air and Radiation Forbes Field Building 283 Topeka, Kansas 66620-
.