Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E280 + (11:29:46, 4 December 2024)
- ML20212E279 + (11:29:47, 4 December 2024)
- PNO-III-87-114, on 871120,licensee Elected to Shutdown from Full Power to Cold Shutdown Conditions to Perform Top Assembly Replacement of Reactor Depressurization Sys Valves Exhibiting Excessive Polot Valve Leakage Since 871114 + (11:29:47, 4 December 2024)
- ML20212E274 + (11:29:48, 4 December 2024)
- PNO-II-87-016, on 870309,Vogtle Unit 1 Achieved Initial Criticality.Nrc Senior Resident Inspector & Region II Specialist Were Present.All Parameters Were Reported to Be Near Anticipated Values + (11:29:48, 4 December 2024)
- IR 05000458/1986035 + (11:29:49, 4 December 2024)
- PNO-I-87-108, on 871118,FBI Arrested 6 Individuals,Accused of Drug Distribution at Peach Bottom Power Station & Surrounding York County Area + (11:29:50, 4 December 2024)
- 05000298/LER-1987-008, :on 870127,reactor Bldg Ventilation Exhaust Radiation Monitor Tripped Causing Group VI Isolation.Caused by Personnel Error Due to Poor Communications & Procedural Deficiencies.Technician Counseled + (11:29:52, 4 December 2024)
- ML20212E268 + (11:29:53, 4 December 2024)
- PNO-III-87-150, on 871209,licensee Reported to Region III That 3 Mci of I-125 Labelled Morphine Used for Research Purposes,Could Not Be Located.Licensee Will Submit 30 Day Rept W/Results of Investigation + (11:29:53, 4 December 2024)
- PNO-II-87-067, on 871001,contaminated Dry Storage Mockup Canister Was Sent to Offsite Vendor for Machining.Licensee Believes Canister Became Contaminated After Being Attached to Contaminated Drainage Sys.State of Sc Informed + (11:29:54, 4 December 2024)
- ML20212E264 + (11:29:55, 4 December 2024)
- ML20212E261 + (11:29:56, 4 December 2024)
- ML20212E260 + (11:29:56, 4 December 2024)
- PNO-III-87-085, on 870620,while Reducing Power for Governor Valve Test on Main Turbine,Turbine Was Taken Off Line After Discovery of electro-hydraulic Control Fluid Leak on 4 Governor Valve + (11:29:57, 4 December 2024)
- ML20212E256 + (11:29:58, 4 December 2024)
- ML20212E255 + (11:29:59, 4 December 2024)
- PNO-II-87-078, on 871126,licensee Removed Unit 1 from Svc to Repair Leaking Manway Cover on Secondary Side of C Steam Generator.Unit Cooled Down & Manway Gasket Replaced. Commonwealth of Virginia Informed + (11:29:59, 4 December 2024)
- ML20212E253 + (11:30:00, 4 December 2024)
- AECM-87-0047, Annual Operating Rept for 1986 + (11:30:01, 4 December 2024)
- PNO-III-87-083A, on 870617,while Operating at 29% Power During Reactor Recirculation Test,Recirculation Pumps Tripped & Natural Circulation Established.Ait Being Sent to Site.Corrected Version of PNO-III-87-083 + (11:30:01, 4 December 2024)
- PNO-V-87-085, on 871231,Region V Ofc Notified by NRC Resident Ofc at Washington Public Power Supply Reactor Site That Tractor Trailer Vehicle Had Overturned on Steven Highway Outside Richland,Wa.State of Wa Notified + (11:30:29, 4 December 2024)
- ML20212E244 + (11:30:30, 4 December 2024)
- ML20212E243 + (11:30:31, 4 December 2024)
- PNO-III-87-086, on 870623,licensee Declared Alert When Smoke Was Discovered in Outside Containment Cable Penetration Area.Although Outside Assistance Was Not Required,Fire Dept Was Placed on Standby During Event + (11:30:31, 4 December 2024)
- ML20212E238 + (11:30:34, 4 December 2024)
- ML20212E237 + (11:30:35, 4 December 2024)
- PNO-II-87-079, on 871128,North Anna Unit 1 Was Taken Off Line Due to Excessive Seal Leakage on B Reactor Coolant Pump. Outage Planned for 10 Days to Replace Seal Package & Inspect Lower Radial Bearing on Pump.Commonwealth of VA Informed + (11:30:35, 4 December 2024)
- ML20212E232 + (11:30:36, 4 December 2024)
- ML20212E231 + (11:30:36, 4 December 2024)
- PNO-III-87-097A, on 870714,preliminary Review of Incident Determined That Startup Transformer 1-2 Faulted.Cause of Initial Fault Still Under Investigation + (11:30:37, 4 December 2024)
- ML20212E229 + (11:30:38, 4 December 2024)
- ML20212E227 + (11:30:39, 4 December 2024)
- ML20212E224 + (11:30:40, 4 December 2024)
- PNO-III-87-103, on 870727,licensee Reduced Power to Approx 2% to Repair Feedwater Check Valve Which Was Leaking. Unusual Event Under Licensee Emergency Plan Was Declared,Due to Required Shutdown + (11:30:40, 4 December 2024)
- PNO-III-87-118B, AIT on-site Activities Concluded.Team Gathered Necessary Info to Evaluate Significance of Event by Interviewing Operators & Other Plant Personnel,Reviewing Records & by Observing Plant Conditions + (11:30:41, 4 December 2024)
- ML20212E221 + (11:30:42, 4 December 2024)
- 05000414/LER-1986-053-01, :on 861122,during Startup from 861120 Reactor Trip,Steam Generator Level Transient & Reactor Trip Occurred Due to Failure of Main Feedwater Pump Automatic Controller. Caused by Printed Circuit Card Failure + (11:30:45, 4 December 2024)
- ML20212E216 + (11:30:45, 4 December 2024)
- 05000456/LER-1987-008, :on 870129,reactor Tripped Due to Deenergization of Nuclear Instrumentation Sys as Protective Measure Against Water Intrusion Into Control Room.Caused by Plugged Drain.Drain Cleared & Flushed + (11:30:47, 4 December 2024)
- ML20212E211 + (11:30:48, 4 December 2024)
- ML20212E210 + (11:30:48, 4 December 2024)
- ML20212E208 + (11:30:49, 4 December 2024)
- ML20212E203 + (11:30:51, 4 December 2024)
- ML20212E201 + (11:30:51, 4 December 2024)
- ML20212E200 + (11:30:52, 4 December 2024)
- ML20212E197 + (11:30:53, 4 December 2024)
- ML20212E195 + (11:30:53, 4 December 2024)
- ML20212E194 + (11:30:54, 4 December 2024)
- ML20212E191 + (11:30:55, 4 December 2024)
- ML20212E189 + (11:30:56, 4 December 2024)