Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212F049 + (11:22:28, 4 December 2024)
- ML20212F047 + (11:22:32, 4 December 2024)
- ML20212F046 + (11:22:33, 4 December 2024)
- ML20212F044 + (11:22:33, 4 December 2024)
- ML20212F042 + (11:22:34, 4 December 2024)
- ML20212F041 + (11:22:35, 4 December 2024)
- ML20212F040 + (11:22:35, 4 December 2024)
- ML20212F038 + (11:22:36, 4 December 2024)
- ML20212F036 + (11:22:37, 4 December 2024)
- ML20212F037 + (11:22:37, 4 December 2024)
- ML20212F035 + (11:22:38, 4 December 2024)
- ML20212F033 + (11:22:39, 4 December 2024)
- ML20212F030 + (11:22:39, 4 December 2024)
- ML20212F029 + (11:22:40, 4 December 2024)
- ML20212F024 + (11:22:42, 4 December 2024)
- 05000317/LER-1987-005, :on 870217,isolation of Recirculation Actuation Sys Level Swiches Which Sense Refueling Water Tank Level Occurred.Caused by Miscommunication Between Control Room Operator & Plant Roundsman.Operators Counseled + (11:22:43, 4 December 2024)
- ST-HL-AE-5776, Submits Response Confirming Completion of Actions Requested by GL 96-01, Testing of Safety-Related Logic Circuits + (11:22:44, 4 December 2024)
- ML20212F018 + (11:22:45, 4 December 2024)
- L-96-011, RCS & SG Isotopic Concentrations,Pre-Incident Spike Concentrations & Iodine Spike Appearance Rates Corresponding to 0.35 & 0.5 Uci/Gm RCS Specific Activity + (11:22:46, 4 December 2024)
- ML20212F016 + (11:22:46, 4 December 2024)
- ST-HL-AE-1886, Forwards Annotated Rev to FSAR Section 9.3.3.4,deleting Commitment for Periodic Testing of Equipment & Floor Drain Sys.Rev Will Be Incorporated Into FSAR Amend 58 + (11:22:47, 4 December 2024)
- ML20212F012 + (11:22:48, 4 December 2024)
- NLS8600388, Revised Application for Amend to License DPR-46,consisting of Proposed Change 36 Re Format of Proposed Surveillance Tables for Gaseous & Liquid Effluent Monitoring Instrumentation + (11:22:48, 4 December 2024)
- IR 05000458/1986026 + (11:22:49, 4 December 2024)
- IR 05000298/1986032 + (11:22:50, 4 December 2024)
- ML20212E996 + (11:22:53, 4 December 2024)
- ML20212E995 + (11:22:54, 4 December 2024)
- ML20212E993 + (11:22:54, 4 December 2024)
- ML20212E992 + (11:22:56, 4 December 2024)
- B16824, Revises Scheduled Completion Date of Commitment to Review & Update Internal Procedures to Ensure Sufficient Guidance Exists for NRC Reporting Obligations,Including Bankruptcy & License Transfer by 970812, to 971201 + (11:22:57, 4 December 2024)
- ML20212E990 + (11:22:57, 4 December 2024)
- ML20212E985 + (11:22:58, 4 December 2024)
- ML20212E987 + (11:22:58, 4 December 2024)
- IR 05000382/1986025 + (11:23:00, 4 December 2024)
- ML20212E981 + (11:23:01, 4 December 2024)
- ML20212E982 + (11:23:01, 4 December 2024)
- ML20212E979 + (11:23:02, 4 December 2024)
- ML20212E980 + (11:23:02, 4 December 2024)
- ML20212E976 + (11:23:04, 4 December 2024)
- ML20212E975 + (11:23:04, 4 December 2024)
- IR 05000382/1986027 + (11:23:05, 4 December 2024)
- TXX-9720, Forwards Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval + (11:23:06, 4 December 2024)
- ML20212E970 + (11:23:07, 4 December 2024)
- ML20212E969 + (11:23:08, 4 December 2024)
- PNO-V-86-047, on 860722,licensee Declared Unusual Event Due to Both Trains of Decay Heat Sys Being Declared Inoperable. RCS Temp Was Approx 84 F W/Atmospheric Pressure + (11:23:09, 4 December 2024)
- ML20212E967 + (11:23:09, 4 December 2024)
- ML20212E966 + (11:23:10, 4 December 2024)
- PNO-V-86-020, on 850418,Unit 2 Reactor Was Brought to Criticality Following Dilution of Rcs.Estimated Critical B Was 1015 Ppm W/Group 5 Control Rod Bank 75 Inches Withdrawn. Resident Inspector Witness Approach to Initial Criticality + (11:23:10, 4 December 2024)
- ML20212E963 + (11:23:11, 4 December 2024)
- ML20212E960 + (11:23:12, 4 December 2024)
- ML20212E961 + (11:23:12, 4 December 2024)
- BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval + (11:23:13, 4 December 2024)