OEC 3 1 1986
-
.
'$)
J'-
In Reply Refer To:
Docket: 50-382/86-27
'
Louisiana Power & Light Company
ATTN:
J. G. Dewease, Senior Vice President
Nuclear Operations
N-80
..'
.317 Baronne Street
' '
New Orleans, Louisiana
70160
Gentlemen:
This refers to the inspection conducted by Mr. C. A. Hackney of this office
t
'during the period November 17-21, 1986, of activities authorized by NRC
'
Operating License NPF-38, for Waterford 3 Steam Electric Station and to the
discussion of our findings with you and other members of your staff at the
<
4
conclusion of the inspection.
,
Areas examined during the inspection included notifications and communications,
' changes to the' emergency preparedness program, and shift staffing and
1 augmentation. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with personnel,
andl observations by the NRC inspector. The inspection findings are documented
~
'in the enclosed inspection report.
' During this inspection, it was found that certain of your activities were in
>
. violation of NRC requirements.
Normally, you are required to respond to
violations, in writing, in accordance with the provisions of Section 2.201 of
s'
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
,
- Your> response during the inspection, which included an admission of the alleged
-violation, an explanation of the causes, corrective steps which have been taken
swithithe immediate results, and the outlined corrective steps which will be
taken to avoid further violations, was based on the specifics contained in the
Notice of V 'lation enclosed with this letter.
Therefore, no written response
to'this'v~.sation is required.
.
Should you have any questions concerning this inspection, we will be pleased to
idiscuss them with you.
Sincerely,
" Original Signed by:
R. E. Hall" gg
,
'
J. E. Gagliardo, Chief
p
Reactor Projects Branch
,
Enclosures:
(see next page)
RIV:EP&SPb C:EP&
S
C:R&SPB
C: PB
- R
/
'
3
[/y/86
CAHackney/1w-
LAYan
WLFis
^GL
able
ia o
g/ &/86
/
la /49/86
gS/ A/85
11/Ja/86
9
n
7
l -
8701050538 86123)
O
PDR iADOCK 05000382
/
-
i
.,O
.
/.Y
- \\
t
'
j
'
-
-
.
.
.
--
'
.
Louisiana Power & Light Company
-2-
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/86-27
cc w/ enclosures:
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
Licensing Coordinator
P. O. Box B
Killona, Louisiana
70066
Louisiana Power & Light Company
ATTN:
R. P. Barkhurst, Plant Manager
P. O. Box B
Killona, Louisiana
70066
Middle South Services
ATTN: Mr. R..T. Lally
P. O. Box 61000
New Orleans, Louisiana
70161
Louisiana Power & Light Company
ATTN:
K. W. Cook, Nuclear Support
and Licensing Manager
317 Baronne Street
P. O. Box 60340
New Orleans, Louisiana
70160
Louisiana Radiation Control Program Director
bec to DMB (IE35)
bec distrib. by RIV:
- RPB
- 0. Weiss, LFMB (AR-2015)
- RRI
R. D. Martin, RA
- Section Chief (RPB/C)
DRSP
- R&SPB
- RSB
- MIS System
- Project Inspector
- RSTS Operator
- C. A. Hackney
- RIV File
- L. A. Yandell
- W. L. Fisher
R. L. Bangart
D. B. Matthews, IE