Forwards Insp Rept 99901080/87-01 on 870112-14 & Notice of Violation.Procedure for Evaluating Part 21 Deviations Not Developed & Documents Required by Part 21 Not Posted in Designated Areas
ML20212E995
Person / Time
Issue date: 03/02/1987
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Pop S
PEERLESS-WINSMITH
Shared Package
ML20212E999 List:
References
REF-QA-99901080 NUDOCS 8703040595
Download: ML20212E995 (1)


Text

y-

[I f/

'o,,

UNITE] STATES 8

NUCLEAR REGULATORY COMMISSION o

wasHWGTON. D. C. 20066 j

o

'%,*****/

March-2, 1987 D:cket No. 99901080/87-01 Peerless-Winsnith, Inc.

ATTN:

Mr. Steven Pop General Manager 1401 West Market Street Warren, Ohio a4485 Gentlemen:

This refers to the inspection conducted by Mr. Jeffray B. Jacobson of this office on January 12-14, 1987, of your facility at Warren, Ohio and to the discussions of our findings with you and rembers of your staff at the conclusion of the inspection.

This inspection was made as a result of various reported failures of Peerless motors installed in Limitorque rotor operated valve actuators and as a result of a recent NRC inspection performed at Limitorque where it was learned that a number of manufacturing changes had been made to previously qualified Peerless notors. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an exami-nation of procedures and representative records, interviews with personnel, end observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Peerless has not developed a procedure recuired for evaluating Part 21 deviations nor have the documents required by Part 21 been posted in designated areas. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

i The encicsed Notice of Violation is sent to you pursuant to the provisions of Section 206 of the Energy Peorganization Act of 1974.

You are required to submit l

to this office within 30 days from the date of this letter a written stetenant containing:

(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and praventive i

measures were or will be completed. Consideration may be oiven to axtending your response tire for good cause shown.

l.

The responses recuested by this letter are not subject to the clearance proco-l dures of the Office of Managerent and Budoet as required by the Paperwork l

Reduction Act of 1980, PL 96-511.

l E83o3We !"#i"y pA 99901080 f

o

Peerless-Winsmith, Inc.' liarch 2, 1937

.In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

'to discuss them with you.

Sincerely, original signed by Uldis Potapovs hEllis W. Merschoff, Acting Chief Vendor Program Branch Division of Quality Assurance, Vendor j

and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1.

Appendix A-Notice of Violation 2.

Appendix B-Inspection Report 99901080/87-01 DISTRIBUTION:

('uns:IE:09

~

s.

VPB RE^a'diiiF~

DQAVT Reading JTaylor BGrimes HMiller EMerschoff ETBaker JJacobson d

VPB:DQAVT SC/VPB:DQAVT C/VPB:DQAVT JBJacobson/ sam TBaker EWMerschoff 2/'>r/87 2/)-]/87 2/Q87 j

<