Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214J658 + (06:51:54, 4 December 2024)
- ML20214J655 + (06:51:55, 4 December 2024)
- ML20214J653 + (06:51:56, 4 December 2024)
- ML20214J654 + (06:51:56, 4 December 2024)
- ML20214J652 + (06:51:57, 4 December 2024)
- ML20214J651 + (06:51:57, 4 December 2024)
- ML20214J650 + (06:51:58, 4 December 2024)
- ML20214J649 + (06:51:59, 4 December 2024)
- ST-HL-AE-2188, Interim Deficiency Rept Re Leaking Main Steam Power Operated Relief Valve Switches.Initially Reported on 870323.Affected Unit 1 Switches Replaced W/Corresponding Unit 2 PORV Components.Next Rept Will Be Submitted by 870603 + (06:51:59, 4 December 2024)
- 05000316/LER-1986-021, :on 860707,during Troubleshooting of source- Range Nuclear Instrument N-32,spike on ESF Signal Occurred. Procedures Revised to Permit Bypassing Reactor Trip Function During Troubleshooting + (06:52:01, 4 December 2024)
- B12293, Forwards Reviews for Isap Topics 1.06, Wind & Tornado Loadings/Tornado Missiles & 1.31, Pipe Break Outside Containment, Per 850517 Commitment + (06:52:02, 4 December 2024)
- ML20214J637 + (06:52:04, 4 December 2024)
- ML20214J638 + (06:52:04, 4 December 2024)
- ML20214J632 + (06:52:05, 4 December 2024)
- ML20214J628 + (06:52:08, 4 December 2024)
- ML20214J626 + (06:52:10, 4 December 2024)
- ML20214J622 + (06:52:11, 4 December 2024)
- ML20214J624 + (06:52:11, 4 December 2024)
- ML20214J620 + (06:52:12, 4 December 2024)
- ML20214J614 + (06:52:13, 4 December 2024)
- ML20214J611 + (06:52:14, 4 December 2024)
- ML20214J609 + (06:52:16, 4 December 2024)
- ML20214J607 + (06:52:16, 4 December 2024)
- ML20214J605 + (06:52:17, 4 December 2024)
- ML20214J606 + (06:52:17, 4 December 2024)
- ML20214J603 + (06:52:21, 4 December 2024)
- ML20214J600 + (06:52:22, 4 December 2024)
- ST-HL-AE-1819, Forwards Revs to Emergency Planning Procedures.W/O Encl. Related Correspondence + (06:52:22, 4 December 2024)
- ML20214J598 + (06:52:23, 4 December 2024)
- ML20214J597 + (06:52:23, 4 December 2024)
- ML20214J596 + (06:52:24, 4 December 2024)
- ML20214J595 + (06:52:25, 4 December 2024)
- ML20214J593 + (06:52:25, 4 December 2024)
- ST-HL-AE-1812, Informs of Util Actions in Response to Complaint by Former QC Inspector for Ebasco Re Employee Termination Following Positive Test for Illegal Drugs.Util Investigation Will Be Conducted Shortly.Related Correspondence + (06:52:26, 4 December 2024)
- ML20214J588 + (06:52:26, 4 December 2024)
- ML20214J587 + (06:52:27, 4 December 2024)
- TXX-6465, Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626 + (06:52:29, 4 December 2024)
- ML20214J580 + (06:52:30, 4 December 2024)
- ML20214J577 + (06:52:31, 4 December 2024)
- AECM-87-0079, Forwards Current Certificate of Coverage by Nuclear Mutual Ltd & Corrected Ani/Maelu & Nuclear Electric Insurance Ltd Certificate + (06:52:32, 4 December 2024)
- ML20214J576 + (06:52:32, 4 December 2024)
- 05000454/LER-1986-029-03, :on 861022,480-volt Breaker,Providing Overcurrent Protection for Electrical Penetration Feed to Containment Crane 1HC22G,discovered Not Tested Prior to Entry Into Mode 4.Caused by Personnel Error + (06:52:34, 4 December 2024)
- ML20214J572 + (06:52:34, 4 December 2024)
- ML20214J571 + (06:52:35, 4 December 2024)
- 05000293/LER-1986-018, :on 860629,GE Akf Model 25 Field Breaker Failed to Trip Automatically.Similar Events Occurred on 830213, 850209 & 0315.Util Investigating for Cause.Corrective Actions Will Be Completed Prior to Startup + (06:52:36, 4 December 2024)
- ML20214J569 + (06:52:37, 4 December 2024)
- ML20214J568 + (06:52:38, 4 December 2024)
- 05000528/LER-1986-047, :on 860712,reactor Tripped at 100% Power on Low Reactor Coolant Flow Signal in Steam Generator 2.Caused by 860522 Reduction in Trip Setpoints for Low Reactor Flow. New Trip Setpoints Being Evaluated + (06:52:40, 4 December 2024)
- RBG-25974, Special Rept Re Measured Settlement Value Outside Tech Spec 3.7.10-1 Limits.Probably Caused by Effects of Const Schedule on Structural Settlement.Calculation Revised to Account for Differences in Const Schedule + (06:52:40, 4 December 2024)
- ML20214J565 + (06:52:41, 4 December 2024)
- ML20214J564 + (06:52:41, 4 December 2024)
- ML20214J562 + (06:52:42, 4 December 2024)