- ML20214X196 + (04:28:55, 4 December 2024)
- ML20214X197 + (04:28:55, 4 December 2024)
- ML20214X195 + (04:28:56, 4 December 2024)
- 05000440/LER-1987-030, :on 870501,manual Reactor Scram Initiated Due to Loss of Reactor Feedwater.Caused by Failure of Air Lines for Condensate Flow Control Valve from Vibration.Metal Air Lines,Addl Valve & Pipe Supports Will Be Installed + (04:28:58, 4 December 2024)
- IR 05000336/1985098 + (04:29:27, 4 December 2024)
- ML20214X190 + (04:29:28, 4 December 2024)
- ML20214X187 + (04:29:31, 4 December 2024)
- ML20214X180 + (04:30:05, 4 December 2024)
- ML20214X184 + (04:30:05, 4 December 2024)
- ML20214X177 + (04:30:06, 4 December 2024)
- ML20214X176 + (04:30:07, 4 December 2024)
- ML20214X175 + (04:30:07, 4 December 2024)
- ML20214X173 + (04:30:08, 4 December 2024)
- 05000440/LER-1987-029, :on 870501,during Containment Venting,Operators Overrode Interlock to Maintain RCIC Suction Transfer W/O Reducing Suppression Pool,Violating Interlock Time Per Tech Spec.Operators Counseled.Design Change Planned + (04:30:10, 4 December 2024)
- IR 05000461/1986065 + (04:30:14, 4 December 2024)
- PNO-II-87-035, on 870601,Georgia Power Co Declared Facility in Commercial Operation Following Completion of 100 H Warranty Run at 100% Power on 870531 + (04:30:15, 4 December 2024)
- ML20214X167 + (04:30:15, 4 December 2024)
- ML20214X162 + (04:30:16, 4 December 2024)
- ML20214X159 + (04:30:17, 4 December 2024)
- ML20214X161 + (04:30:17, 4 December 2024)
- ML20214X158 + (04:30:18, 4 December 2024)
- ML20214X154 + (04:30:19, 4 December 2024)
- PNO-III-86-142, on 861205,licensees Notified NRC That Electrical Splices Did Not Meet Environ Qualification Requirements & Plants Shut Down.Each Unit Has 150 Splices Which Must Be Repaired.Repairs Expected to Take 5 Days + (04:30:19, 4 December 2024)
- ML20214X150 + (04:30:20, 4 December 2024)
- PY-CEI-NRR-0659, Forwards LERs 87-029-00 & 87-030-00 + (04:30:20, 4 December 2024)
- ML20214X145 + (04:30:21, 4 December 2024)
- ML20214X141 + (04:30:22, 4 December 2024)
- ML20214X142 + (04:30:22, 4 December 2024)
- ML20214X138 + (04:30:23, 4 December 2024)
- ML20214X139 + (04:30:23, 4 December 2024)
- ML20214X136 + (04:30:27, 4 December 2024)
- 05000423/LER-1986-055, :on 861106,emergency Diesel Generator B Did Not Start within Required 10 During Surveillance Testing. Caused by Low Lube Oil & Jacket Water Temp.Another Start Performed After Lube Oil & Temps Increased + (04:30:28, 4 December 2024)
- ML20214X132 + (04:30:30, 4 December 2024)
- ST-HL-AE-2173, Responds to Violation 8703-01 Dtd 870515.Corrective Actions: Data Sheets for Fuel Receipt Reviewed & Corrected,Health & Safety Technicians Involved W/Fuel Receipt Trained Re Procedural Requirements & Procedures Revised + (04:30:30, 4 December 2024)
- ML20214X129 + (04:30:31, 4 December 2024)
- NRC-86-3181, Forwards Listed Nonproprietary Documents Re Rod Cluster Control Assembly Performance,Per Request.Topical Rept WCAP-8183, Operational Experience W/Westinghouse Cores Issued for Input to NRC Annual Fuel Performance Rept + (04:30:32, 4 December 2024)
- ML20214X127 + (04:30:32, 4 December 2024)
- ML20214X122 + (04:30:36, 4 December 2024)
- ML20214X121 + (04:30:37, 4 December 2024)
- ML20214X119 + (04:30:38, 4 December 2024)
- ST-HL-AE-1830, Responds to NRC Request for Addl Info Re Util Position on Increasing Cumulative Usage Factor for Pipe Break Postulation.Pipe Schedule & Matl Type for Valves,Piping & Fittings at Each Cumulative Usage Factor Point Encl + (04:30:38, 4 December 2024)
- ML20214X117 + (04:30:39, 4 December 2024)
- ML20214X116 + (04:30:39, 4 December 2024)
- ML20214X113 + (04:30:41, 4 December 2024)
- ML20214X111 + (04:30:42, 4 December 2024)
- ML20214X110 + (04:30:42, 4 December 2024)
- ML20214X107 + (04:30:43, 4 December 2024)
- ML20214X104 + (04:30:44, 4 December 2024)
- JAFP-86-0726, Forwards Semiannual Radioactive Effluent Release Rept, Jan- June 1986. Summary of Liquid,Gaseous & Solid Effluents Released,Description of Recent Changes to Offsite Dose Calcualtion Manual & Process Control Program Encl + (04:30:44, 4 December 2024)
- ML20214X099 + (04:30:45, 4 December 2024)
- ML20214X098 + (04:30:46, 4 December 2024)
- ML20214X096 + (04:30:48, 4 December 2024)