S Georgia lYwer Ccmpany
. 333 AwJtet Annue Attnta, Georgia 30308 Telephone 404 526 6526 Maing Address:
Post Office Bom 4545 Atlanta, Georg:a 30302 Georgia Power L T. Gucwe IIUI'*T" C'k#C SY"I"*
, Manager Nuclear Safety
' and Ucensing SL-2596 1195C X7GJ17-H200 1
-June 5, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPEPATING LICENSES DPR-57, NPF-5 OUTSTANDLELSUBMITTALS LIST y
Gentlemen:
Enclosed please find an updated listing of those items of correspondence with the NRC to which a written response' is expected.
The enclosure is tabulated chronologically by Georgia Power Company's submittal date.
Georgia Power is prepared to discuss modifications to this status report and will promptly address any questions you may have regarding these licensing issues.
During the past month the NRC has completed licensing action on:
1) our January 6, 1986, proposed Technical Specifications change which would increase the allowable time for scram discharge volume vent and dr_ain valve closure; 2) our February 6, 1987, proposed Technical Specifications change related to boron concentration in the standby liquid control system; 3) our February 13, 1987, proposed Technical Specifit.ations change related to-scram speed testing and fuel operating limits; and 4) our_ March 4,
1987, proposed Technical Specifications change related to hydrostatic and leak testing with a non-critical core.
Georgia Power Company acknowledges and appreciates these efforts.
8706 5 " 16 328 870605asaw Ad
^
f
[
c :, _
GeorgiaPower A U. S. Nuclear Regulatory Commission June 5, 1987
-Page Two-If you have any questions in this regard, please contact this office at any time..
Sincerely, L. T. Gucwa MJB/lc
Enclosure:
Outstanding Licensing Issues With Submittal At NRC c: Georaia Power Company Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS U. S. Nuclear Regulatory Commission. Washinaton. D. C.
Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Region II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch 1195C 700775
GeorgiaPower1
~ ENCLOSURE' PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366
-OPERATING LICENSES DPR-57, NPF OUTSTANDING SUBMITTALS LIST LETTER HATCH DAIE 18 1I SUBJECT Key 0 - -APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C-NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N-ITEM ADDED SINCE LAST REPORT 09/12/84 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING 06/03/85-321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER o 28 - SALEM EVENT - SCRAM BREAKER FAILURE 06/25/85 321,366 PROPOSED CHANGES TO IST PROGRAM 01/06/86
-366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS 01/06/86 321,366 C
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL ' SPECIFICATIONS -
SHIFT OVERTIME REQUIREMENTS
-01/07/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
AUTOMATIC ISOLATION OF PURGE AND VENT ON HIGH RADIATION SIGNAL (TMI ITEM) 02/17/86 331,366 PROPOSED-CHANGE TO TECHNICAL SPECIFICATIONS -
REORGANIZATION - RESPONSIBILITY FOR' RADIOLOGICAL ENVIRONMENTAL MONITORING, MET TOWER LOCATION, QA RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL, PRB/ SRB COMPOSITION AND QUORUM, AUDIT REQUIREMENTS
.1195C E-1 6/5/87 SL-2596
- 700575.-
o
.... v
y s
~GeorgiaPowerd ENCLOSURE (Continued)'
OUTSTANDING SUBMITTALS LIST
-LETTER HATCH Dale 11HI SUBJECT
~
02/28/86:
321,366 PROPOSED. LICENSE EXTENSION.T0 40 YEARS FROM' OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/27/86 321,366 PROPOSED CHANGE..T0 TECHNICAL' SPECIFICATIONS EQUALIZING REACTOR.
PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL -SPECIFICATIONS -
EMERGENCY P0HER - DIESEL. GENERATOR TESTING -
GENERIC LETTER 84-15 04/04/86-366 PROPOSED.
DELETION - 0F BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCORPORATION OF
' SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO
. PLANT PROCEDURES 06/20/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE 08/25/86
-321,366 CHANGE TO RHCU LEAKAGE DETECTION TECHNICAL' SPECIFICATIONS - HIGH TEMPERATURE ISOLATION i
09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTD0HN PANELS FROM SAID PANELS
~
10/27/86_
321,366 PROPOSED REVISION TO TECHNICAL SPECIFICATIONS -
DELETION OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE 11/06/86 321 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION -
i COMMENTS -REGARDING IGSCC INSPECTION AND REPAIR -
UT SUBCONTRACTORS (I
11/14/86 321 INSERVICE INSPECTION RELIEF REQUEST TO CLOSE OUT FIRST 10 YEAR ISI INTERVAL 11/14/86 321,366
RESPONSE
TO VERBAL REQUEST FOR ADDITIONAL INFORMATION - CABLE TRAY SUPPORTS 1195C E-2 6/5/87 SL-2596 L
ram :
GeorgiaPower d ENCLOSURE (Continued)
OUTSTANDING SUBMITTALS LIST LETTER HATCH MIf
[LNII SUBJECT 12/23/86 321,366 DETAILED CONTROL ROOM DESIGN REVIEW 02/06/87 321 C
PROPOSED ATHS TECHNICAL SPECIFICATIONS - BORON CONCENTRATION IN STANDBY LIQUID CONTROL 02/13/87 321,366 C
PROPOSED AMENDMENT.TO TECHNICAL SPECIFICATIONS -
LEAD TEST ASSEMBLIES - SCRAM TIME, MCPR, MAPLHGR 02/13/87 321,366 REQUEST TO REVISE REPORTING REQUIREMENT TECHNICAL SPECIFICATIONS TO FIT LICENSEE EVENT REPORT REQUIREMENTS 02/20/87 321 0
INSERVICE INSPECTION PLAN FOR NEXT HNP-1 OUTAGE -
AUSTENITIC STAINLESS STEEL 03/04/87 321,366 0
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
APPENDIX J VALVES 03/04/87 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC S0IL ANALYSIS 03/04/87 321,366 C
CHANGES TO TECHNICAL SPECIFICATIONS - NUCLEAR HYDRO 03/20/87 366 CHANGES TO TECHNICAL SPECIFICATIONS - HYDROGEN HATER CHEMISTRY 03/27/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
CORE SPRAY DELTA P
(BREAK
-DETECTION)
INSTRUMENTATION 05/01/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
GASE0US EFFLUENT RELEASE POINTS 05/08/87 366 N
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
TURBINE VALVE TESTING 05/08/87 -
321 N
PROPOSED ATHS TECHNICAL SPECIFICATIONS - BORON CONCENTRATION IN STANDBY LIQUID CONTROL 1195C E-3 6/5/87 SL-2596 mm
-