Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B270 + (04:16:53, 4 December 2024)
- ST-HL-AE-1765, Forwards Probabilistic Boron Dilution Analysis Final Rept, Per SER Open Item 15.Analysis Demonstrates That at Least 15 Minutes Available for Operator Response in Event of Boron Dilution Transient.Related Correspondence + (04:16:55, 4 December 2024)
- TXX-6507, Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Project Pipe Support Reverification Program. Initially Reported 860609.List of Support Mods Issued to Date Encl.Next Rept Will Be Submitted by 870820 + (04:16:55, 4 December 2024)
- ML20215B258 + (04:16:57, 4 December 2024)
- TXX-5025, Final Deficiency Rept CP-86-56 Re Fastening of Standby Diesel Generator Engine Connecting Rod Assembly Identified by Tdi.Initially Reported on 860814.Issue Not Reportable Per 10CFR50.55(e) + (04:16:58, 4 December 2024)
- ML20215B253 + (04:16:58, 4 December 2024)
- ML20215B248 + (04:17:00, 4 December 2024)
- ML20215B242 + (04:17:01, 4 December 2024)
- ML20215B243 + (04:17:01, 4 December 2024)
- ML20215B234 + (04:17:02, 4 December 2024)
- ML20215B233 + (04:17:03, 4 December 2024)
- ML20215B231 + (04:17:04, 4 December 2024)
- ML20215B227 + (04:17:05, 4 December 2024)
- ML20215B224 + (04:17:06, 4 December 2024)
- ML20215B222 + (04:17:07, 4 December 2024)
- ST-HL-AE-2249, Forwards Annotated Rev to FSAR Section 6.4.5.1, Control Room Envelope HVAC Integrity & Leaktightness Test. Revised Section 6.4.5.1 Will Be Included in Future FSAR Amend + (04:17:07, 4 December 2024)
- ML20215B217 + (04:17:09, 4 December 2024)
- ML20215B213 + (04:17:09, 4 December 2024)
- ML20215B207 + (04:17:10, 4 December 2024)
- ML20215B206 + (04:17:11, 4 December 2024)
- ML20215B202 + (04:17:12, 4 December 2024)
- ML20215B201 + (04:17:12, 4 December 2024)
- ML20215B197 + (04:17:14, 4 December 2024)
- ML20215B198 + (04:17:14, 4 December 2024)
- ML20215B194 + (04:17:15, 4 December 2024)
- ML20215B190 + (04:17:16, 4 December 2024)
- TXX-5032, Interim Deficiency Rept CP-86-51 Re Anchor Bolts Supplied by Hilti That Do Not Meet Average Ultimate Tensile Loads in Certain Sizes as Published by Supplier.Initially Reported on 860717.Next Rept Expected by 861114 + (04:17:17, 4 December 2024)
- ML20215B188 + (04:17:17, 4 December 2024)
- ML20215B185 + (04:17:18, 4 December 2024)
- ML20215B184 + (04:17:18, 4 December 2024)
- ML20215B181 + (04:17:19, 4 December 2024)
- ML20215B179 + (04:17:20, 4 December 2024)
- ML20215B176 + (04:17:21, 4 December 2024)
- IR 05000498/1987007 + (04:17:39, 4 December 2024)
- ML20215B172 + (04:17:40, 4 December 2024)
- ML20215B169 + (04:17:41, 4 December 2024)
- ML20215B171 + (04:17:41, 4 December 2024)
- ML20215B168 + (04:17:42, 4 December 2024)
- ML20215B165 + (04:17:43, 4 December 2024)
- ML20215B166 + (04:17:43, 4 December 2024)
- ST-HL-AE-1736, Forwards Updated List of Ref Matls Applicable for 861113 Written Reactor Operator & Senior Operator Licensing Exams, Per 860811 Request.Related Correspondence + (04:17:44, 4 December 2024)
- ML20215B163 + (04:17:45, 4 December 2024)
- ML20215B162 + (04:17:45, 4 December 2024)
- ML20215B161 + (04:17:46, 4 December 2024)
- ML20215B156 + (04:17:47, 4 December 2024)
- ML20215B153 + (04:17:48, 4 December 2024)
- ML20215B149 + (04:17:49, 4 December 2024)
- ML20215B151 + (04:17:49, 4 December 2024)
- ML20215B145 + (04:17:50, 4 December 2024)
- ML20215B143 + (04:17:51, 4 December 2024)
- B12198, Forwards Reviews of Isap Topic 2.06, Evaluation of RCS Loop Isolation Valves to Mitigate Steam Generator Tube Rupture & Isap Topic 2.07, Auxiliary Pressurizer Spray Nozzle + (04:17:52, 4 December 2024)