Summarizes 870522 Meeting W/Util at Region IV Ofc Re Expanded Upgrade of Physical Security Sys at Facility.Util Will Provide NRC W/Change to 10CFR50.54(p) Plan & Revised Const Schedule for Upgraded Sys.List of Attendees Encl
ML20215B163
Person / Time
Site: Cooper 
Issue date: 06/11/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8706170242
Download: ML20215B163 (3)


Text

p l

ha y

yy a

In Reply. Refer To:

Docket:

50-298 1

Nebraska Public Power District ATTN: George A. Trevors Division Manager -Nuclear Support

'P. O. Box 499 Columbus, NE 68601l 1

I Gentlemen:

This documents 'a meeting held on May:22.1987,-in the Region IV office between.

inbers. of your staf f-and Region ~'IV ' representatives,' as ' identified in the

' attached attendance list. The purpose of the meeting which was held at Nebraska.Public Power District's (NPPD) request was to brief the Region IV physical security staff on the expanded upgrade of ' security. systems at Cooper Nuclear Station ;and to inform Region IV staff of the projected completion date.

The NPPD briefing included details of the planned security :ystems to include detailed drawings of;the plant systems.

During the briefing, NPPD agreed to-l provide the following:

t 1.

Af ter installation and testing, the licensee will submit a 10.CFR 50.54(p) plan change that specifically describes those areas of the outer. isolation-

~

zone that will have degraded coverage by the assessment aids system.

2.

Provide a revised construction schedule for the upgraded security l

system.

l Both the NRC staff'and NPPD representatives considered the meeting to be'.

1 beneficial, and we are anticipating submittal of the information contained in one ar.d two above.

Sincerely,

/LiedPpwaog' J. E. Gagliardo, Chief Reactor Projects Branch

Enclosure:

Attendance List cc:

(see next page)

RIV C:RPSB C:RPB/ M/7 C:RPB.

AB st/jt LAYande JPJaudon Gagiafdo

/p/s5/87 h/f/87 6/f/87-

//o/ 9

>\\

m 8706170242 B70611 k.3

.PDR ADDCK 05000298

- I F-

, PDR,

\\_/j' 1

l,.

1 i

Nebraska Public Power !

cc:

Guy Horn, Division Manager

)

of Nuclear Operations j

Cooper Nuclear Station 1

P. O. Box 98 Brownville, Nebraska 68321 Kansas Radie. tion Control Program Director Nebraska Radiation Control Program Director Nebraska Public Power District l

bec to DMB (IE 45) bcc distrib by RIV:

RPB DRSP Resident Inspec+or R. D. Martin,.sA Section Chief (RPB/A)

D. Weiss, RM/ALF RPSB RSB MIS System RIV File RSTS Operator Inspector Section Chief L. A. Yandell R. L. Bangart R. E. Hall Project Inspector, RPB NRR Project Inspector 1

)

i

l ATTENDANCE LIST i

Attendance at the Nebraska Public Power District -NRC meeting on May 22, 1987, at the NRC Region IV office.

NAME Title NPPD i

G. A. Trevors Division Manager - Nuclear Support L. P. Kohles Manager of Nuclear Project and Construction W. L. Swantz Senior Engineer J. C. Murphy Project Manager D. R. Kuntze Project Manager, NUS NBC L. A. Yandell Chief, Radiological Protection and Safeguards Branch J. P. Jaudon Chief, Reactor Project Section A J. A. F. Kelly Security Inspector l