Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000528/LER-1986-055, :on 861106,Surveillance Test 36ST-9SA02 Identified as Incomplete,Per Tech Spec 4.0.2.Caused by Inability to Position Control Room Intake Damper Due to Actuator Malfunction.Actuator Adjusted + (04:11:54, 4 December 2024)
- ML20215B842 + (04:11:55, 4 December 2024)
- ML20215B835 + (04:11:57, 4 December 2024)
- 05000322/LER-1987-015, :on 870515,unplanned Initiation of Control Room Air Conditioning B Train Occurred Due to Low Reactor Bldg Differential Pressure.Caused by Failed Interlock Switch. Switch Indicating Door Position Repaired + (04:11:59, 4 December 2024)
- ML20215B831 + (04:12:01, 4 December 2024)
- ML20215B830 + (04:12:02, 4 December 2024)
- ML20215B828 + (04:12:02, 4 December 2024)
- ML20215B827 + (04:12:03, 4 December 2024)
- ST-HL-AE-2206, Forwards Annotated Revs to FSAR App 3.6.A, Isolation Valve Cubicle Subcompartment Analysis. Rev Due to Calculation Results Showing That Some High Energy Line Break Effects Worse than Main Steam Line Break.Rev Will Be in FSAR Amend + (04:12:05, 4 December 2024)
- ML20215B821 + (04:12:06, 4 December 2024)
- ML20215B820 + (04:12:06, 4 December 2024)
- ML20215B819 + (04:12:07, 4 December 2024)
- 05000278/LER-1986-024-01, :on 861108,partial Group V Primary Containment Isolation Occurred During Testing of RCIC Sys Steam Tunnel Temp Switch.Caused by Loose Wire Connection.Wire Tightened + (04:12:09, 4 December 2024)
- ML20215B816 + (04:12:09, 4 December 2024)
- ML20215B814 + (04:12:10, 4 December 2024)
- NRC-87-3229, Informs of Completion of Preliminary Design & Engineering of Advanced Pwr.Westinghouse Currently Working on Final Design & Engineering Efforts & Encouraged That Issuance of Preliminary Design Approval Will Be Achieved in Early 1988 + (04:12:10, 4 December 2024)
- A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps + (04:12:11, 4 December 2024)
- 05000344/LER-1987-011, :on 870501,excessive Leakage Detected from Penetration E-107 During Check of Penetrations E-112 & E-115.Caused by Leakage Past Electrical Penetration Conductor Seals & Seal Displacement Due to Age + (04:12:13, 4 December 2024)
- ML20215B807 + (04:12:14, 4 December 2024)
- ML20215B808 + (04:12:14, 4 December 2024)
- ML20215B806 + (04:12:15, 4 December 2024)
- ML20215B805 + (04:12:15, 4 December 2024)
- ML20215B804 + (04:12:16, 4 December 2024)
- ML20215B802 + (04:12:17, 4 December 2024)
- ML20215B801 + (04:12:18, 4 December 2024)
- ML20215B800 + (04:12:19, 4 December 2024)
- ML20215B799 + (04:12:20, 4 December 2024)
- ML20215B798 + (04:12:20, 4 December 2024)
- ML20215B796 + (04:12:22, 4 December 2024)
- IR 05000327/1987014 + (04:13:23, 4 December 2024)
- ML20215B790 + (04:13:24, 4 December 2024)
- ML20215B789 + (04:13:24, 4 December 2024)
- 05000366/LER-1986-034-01, :on 861105,emergency Diesel Generator 2C Started & Tied to Bus.Caused by Personnel Not Adequately Reviewing Logic Prints Before Removing Transformer Compartments from Bus 2G.Sys Restored + (04:13:26, 4 December 2024)
- ML20215B786 + (04:13:27, 4 December 2024)
- ML20215B784 + (04:13:27, 4 December 2024)
- ML20215B780 + (04:13:28, 4 December 2024)
- ML20215B778 + (04:13:29, 4 December 2024)
- ML20215B773 + (04:13:30, 4 December 2024)
- ML20215B772 + (04:13:31, 4 December 2024)
- ML20215B770 + (04:13:31, 4 December 2024)
- ML20215B768 + (04:13:32, 4 December 2024)
- ML20215B769 + (04:13:32, 4 December 2024)
- U-600950, Informs That Util Has Agreed to Revise Procedure CPS 3319.01, Standby Gas Treatment, Per Sser 8,Section 6.2.5 Re Discussion of Reg Guide 1.7 Compliance + (04:13:33, 4 December 2024)
- ML20215B763 + (04:13:34, 4 December 2024)
- ML20215B762 + (04:13:35, 4 December 2024)
- ML20215B759 + (04:13:36, 4 December 2024)
- ML20215B758 + (04:13:37, 4 December 2024)
- ML20215B755 + (04:13:38, 4 December 2024)
- ML20215B757 + (04:13:38, 4 December 2024)
- ML20215B753 + (04:13:39, 4 December 2024)
- 3F0687-07, Responds to Violations Noted in Insp Rept 50-302/87-10. Corrective Actions:Operating Daily Surveillance Log SP-300 Revised to Include Channel Check for Listed Fluxes,Reactor Coolant Outlet Temp & Bwst Level & RB Pressure + (04:13:41, 4 December 2024)