ML20215B753
| ML20215B753 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/09/1987 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| SL-2582, NUDOCS 8706170438 | |
| Download: ML20215B753 (2) | |
Text
>
Georgia Power Coriipany C [. 333 Piedrnont Avenue -
3-Atlanta, Georgia 30308
~ j' Telephone 404 526-6526 -
Malling Address;
' Post Office Box 4545
' Atlanta, Georgia 30302 -
Georgia Power G T. Gucwa the southern elecinc syF!em Manager Nuclear Safety '
and Licensing.
SAFEGUARDS INFORMATION ENCLOSURE CONTAINS SAFEGUARDS INFORMATION, UPON SEPARATION,-THIS PAGE IS DECONTROLLED E
SL-2582 k
1400C X7GJ17-H770 June 9, 1987 1
U.;S. Nuclear Regulatory Commission-
' Document Control Desk Hashington, D.C.
20555 1
1 PLANT HATCH - UNITS.1, 2 i
NRC DOCKETS 50-321, 50-366 l
4 OPERATING LICENSES DPR-57, NPF-5 L
AMENDMENT TO THE GUARD TRAINING AND OUALIFICATION PLAN Gentlemen:
l
' Georgia; Power Company (GPC) submitted, by letter of April. -13,.1987,
. revised versions of the Plant. Hatch Physical Securi ty, Safeguards Contingency; and Guard Training and Qualification Plans.
That submittal was made in accordance with the. provisions of 10 CFR 50.54 (p).
Pursnnt g
to a subsequent _ telephone conversation'between Mr. J. 'Lukehart of GPC and l
Mr.
D.
McGuire of NRC Region'II, it was determined _that a ' change was necessary to the implementation schedule for the-- Guard Training and' Qualification Plan 'as submitted-above.
This. change was necessary because the implementation schedule provided conflicted with the requirements-of 10 CFR 50.54 (p).
j
.i The enclosed changed page 1-1 of the Guard Training and Qualification Plan, reflecting the necessary revision to the plan's. implementation schedule, is hereby submitted in accordance with the provisions of 10 CFR 50.54 (p).
This change has been determined not to decrease the
. safeguards effectiveness of the plan.
Since public disclosure. of security information may jeopardize the safety of the facility, we request that the material submitted herewith be -maintained as proprietary and withheld from public disclosure in accordance with the provisions of 10 CFR 2.70 (d) and 10 CFR 73.21.
SAFEGUARDS INFORMATION ENCLOSURE CONTAINS I
E SAFEGUARDS INFORMATION, 4
' 870617043s e70609 E
UPON. SEPARATION THIS fR.
ADOCK 0 g1 PAGE IS DECONTROLLED q
W GeorgiaPowerk i
U. S Nuclear Regulatory Commission.
June.9,- 1987 Page Two-
~
In accordance with the provisions of 10 CFR 50.4 (b)(4), the signed
-original and. three ' copies of this submittal. are provided - to the NRC Document Control Desk, i
Please contact this office at any time if you have any questions in
- )
.this regard.
y Sin ere g L. T. Gucwa a
REB /lc-
Enclosure:
I Instructions for incorporation c: Ettorcia Power Comoany Mr. J. P. O'Reilly w/o Mr. J.'T. Beckham,.Jr. w/o Mr..'J. H. Lukehart w/o G0-NORMS w/o U. S. Nuclear Reculatory Commission. Washinaton. D. C.
Mr. L. P. Crocker, Licensing Project Manager.- Hatch U. S.-Nuclear Reaulatory Commission. Reaion 11 Dr. J. N. Grace, Regional Administrator (two copies)
- ). -
Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch
. SAFEGUARDS INFORMATION ENCLOSURE CONTAINS SAFEGUARDS INFORMATION, UPON' SEPARATION THIS PAGE IS DECONTROLLED L
y
.1400C?
g mns