Docket No. 50-254
Docket No. 50-265
DEC 0 41986
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. T. Allen and
others of this office on November 17-21, 1986, of activities at the Quad
Cities Nuclear Generating Station, Units 1 and 2, authorized by NRC Operating
Licenses No. DRP-29 and No. DRP-30, and to the discussion of our findings with
Mr. R. L. Bax and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
However, we are concerned that the inspection findings summarized
in Enclosure 2 to this letter indicate that the level of management support
for emergency preparedness may not be consistent with your staff's previous
SALP performance rating.
Also, the Station GSEP Coordinator during this
inspection was the third person to fill the Coordinator position in the last
twelve months.
The changes in Coordinator appear to have resulted in some
loss of emergency preparedness program continuity.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspectio report will be placed in the
NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
8612120329 861204
W. D. Shafer, Chief
ADOCK 05000254
G
~
Radiological Protection Branch
Enclosures:
1.
Inspection Reports
No. 50-254/86017(DRSS);
No. 50-265/86017(DRSS)
2.
Inspection Findings - Open Items
f
See Attached Distribution
i
/3
L
)
$
RIII
RI
RIII
RIII
RIII
E'
A Eb~
ash
MS
nb
\\
Alled/Ims
P
erson
Williamsen
Snell
a Riw
h fer
&
yo
yer
.
_
.
_
-
-
- .-
.
.
.
. . - _ -
-
-
--
.
_- , _ .
.
.
-
Commonwealth Edison Company
2
DEC 0 41986
,
Distribution
,
1:c w/ enclosures:
D. L. Farrar, Director
.
of Nuclear Licensing
i
R. L.'Bax, Plant Manager
- '
DCS/RSB (RIDS)
Licensing Fee Management Branch
- Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
4-
Control Division
D. Matthews, EPB, OIE
W. W'eaver, FEMA V
J. Overstreet, FEMA VII
t
!
l
i
i
!
!
i
l
.
!
f
-
- . _ - , , - - - , - - , . , , . , - - - - - - - , , , , - . . , - - - - , - - - - - - , - - , - - -
- -
- - . . - - -
- - - - - - - - - ~ , - -
- - - - - - - , ~ - - , -
.
-
'
Enclosure 2
-
d
OPEN ITEMS
1.
During walkthroughs, personnel were unable to complete dose calculations
and assessments in a timely manner using the TSC computer terminal.
(254/86017-01 and 265/86017-01) (Section 3)
2.
The GSEP Coordinator was not reviewing GSEP events to determine if
the event response had been correct and proper.
(254/86017-02 and
265/86017-02) (Section 7).
3.
Semi-annual training required by GSEP Section 8.2 for Control Room
'
personnel had not been completed.
(254/86017-03 and 265/86017-03)
(Section 8)
4.
Walkthroughs with Rad / Chem Technicians determined that they did not know
the correct procedure for collecting an onsite emergency air sample.
(254/86017-04 and 265/86017-04) (Section 8)
,