Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000328/LER-1987-006-02, :on 870518,discovered Error in Core Cycle Exposure & Height Dependent Power Factor.Caused by Personnel Error in Utilization of Vendor Supplied Data.Qa Qualification of Incore Will Validate Program + (03:27:46, 4 December 2024)
- ML20215F867 + (03:27:47, 4 December 2024)
- ML20215F866 + (03:27:47, 4 December 2024)
- ML20215F860 + (03:27:48, 4 December 2024)
- ML20215F862 + (03:27:48, 4 December 2024)
- DD-86-17, Advises That Time for Commission to Review Directors Decision DD-86-17 Expired.Commission Declined Review. Decision Became Final Agency Action on 861215.Served on 861222 + (03:27:49, 4 December 2024)
- ML20215F858 + (03:27:49, 4 December 2024)
- ML20215F855 + (03:27:53, 4 December 2024)
- ML20215F856 + (03:27:53, 4 December 2024)
- ML20215F853 + (03:27:54, 4 December 2024)
- ML20215F845 + (03:27:57, 4 December 2024)
- ML20215F843 + (03:27:58, 4 December 2024)
- 05000354/LER-1986-086, :on 861114,reactor Bldg Ventilation Sys Isolated & Filtration,Recirculation & Ventilation Sys Automatically Actuated from Valid High Radiation Signal. Caused by Steam Leak in RWCU Sys.Leak Repaired + (03:27:59, 4 December 2024)
- ML20215F841 + (03:28:00, 4 December 2024)
- ML20215F838 + (03:28:00, 4 December 2024)
- ML20215F836 + (03:28:01, 4 December 2024)
- ML20215F831 + (03:28:04, 4 December 2024)
- ML20215F833 + (03:28:04, 4 December 2024)
- ML20215F828 + (03:28:05, 4 December 2024)
- ML20215F830 + (03:28:05, 4 December 2024)
- ML20215F825 + (03:28:06, 4 December 2024)
- ML20215F826 + (03:28:06, 4 December 2024)
- ML20215F823 + (03:28:07, 4 December 2024)
- ML20215F818 + (03:28:08, 4 December 2024)
- ML20215F821 + (03:28:08, 4 December 2024)
- IR 05000456/1986046 + (03:28:14, 4 December 2024)
- ML20215F816 + (03:28:15, 4 December 2024)
- ML20215F815 + (03:28:15, 4 December 2024)
- ML20215F809 + (03:28:16, 4 December 2024)
- ML20215F812 + (03:28:16, 4 December 2024)
- ML20215F808 + (03:28:17, 4 December 2024)
- 05000316/LER-1950-316, Advises That Event Described in LER 50-316/86-25 Determined Not Reportable,Per Vendor Info & Engineering Evaluation. Raychron Replacement Timers Seismically Qualified for Use in Exide Battery Chargers.Ler Number Will Not Be Rei + (03:28:18, 4 December 2024)
- ML20215F806 + (03:28:18, 4 December 2024)
- ST-HL-AE-1847, Provides Results of Small Break LOCA Reanalysis to Resolve NUREG-0737,Item II.K.3.31,per SER (NUREG-0781) Confirmatory Item 34.Marked-up Pages to FSAR Section 15.6.5,providing Present Analysis Results & Associated Tables & Figures,Encl + (03:28:19, 4 December 2024)
- ML20215F803 + (03:28:19, 4 December 2024)
- ML20215F801 + (03:28:20, 4 December 2024)
- ML20215F800 + (03:28:21, 4 December 2024)
- ML20215F799 + (03:28:21, 4 December 2024)
- ML20215F798 + (03:28:22, 4 December 2024)
- IR 05000424/1986072 + (03:28:23, 4 December 2024)
- ML20215F793 + (03:28:24, 4 December 2024)
- ML20215F788 + (03:28:25, 4 December 2024)
- ML20215F789 + (03:28:25, 4 December 2024)
- AECM-87-0118, Monthly Operating Rept for May 1987 + (03:28:26, 4 December 2024)
- ML20215F783 + (03:28:26, 4 December 2024)
- 05000286/LER-1986-012-01, :on 861114,reactor Trip Occurred Due to fail- Safe Design.Caused by Unintentional Opening of Dc Power Supply Breaker.Mod Designed to Provide Easier Access to Dc Power Panels & Prevent Recurrence + (03:28:28, 4 December 2024)
- ML20215F773 + (03:28:29, 4 December 2024)
- ML20215F775 + (03:28:29, 4 December 2024)
- ML20215F771 + (03:28:30, 4 December 2024)
- ML20215F770 + (03:28:31, 4 December 2024)
- ML20215F769 + (03:28:31, 4 December 2024)
- ML20215F763 + (03:28:32, 4 December 2024)