Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215N754 + (02:16:51, 4 December 2024)
- ML20215N755 + (02:16:51, 4 December 2024)
- ML20215N752 + (02:16:52, 4 December 2024)
- ML20215N748 + (02:16:52, 4 December 2024)
- ML20215N747 + (02:16:53, 4 December 2024)
- ML20215N746 + (02:16:53, 4 December 2024)
- ML20215N742 + (02:16:54, 4 December 2024)
- IR 05000206/1986023 + (02:17:00, 4 December 2024)
- B12217, Suppls Re Proposed Minor Change in Percentage Ownership for 2 of 15 Utils as Licensees for Facility. Transfer Results from City of Burlington,Vt Inability to Pay Capital Costs Since Feb 1982 + (02:17:01, 4 December 2024)
- IR 05000456/1986048 + (02:17:01, 4 December 2024)
- ML20215N737 + (02:17:02, 4 December 2024)
- ML20215N734 + (02:17:03, 4 December 2024)
- ML20215N732 + (02:17:04, 4 December 2024)
- ML20215N731 + (02:17:04, 4 December 2024)
- IR 05000443/1986048 + (02:17:05, 4 December 2024)
- ML20215N728 + (02:17:06, 4 December 2024)
- ML20215N726 + (02:17:07, 4 December 2024)
- ML20215N723 + (02:17:10, 4 December 2024)
- ML20215N720 + (02:17:11, 4 December 2024)
- ML20215N722 + (02:17:11, 4 December 2024)
- IR 05000482/1986022 + (02:17:17, 4 December 2024)
- TXX-6067, Interim Deficiency Rept CP-86-70 Re Elevated Temp Effects on Instrument Supports & Tubing.Initially Reported on 861002. Tubing Currently Designed & Installed Using Max Operating Temp Criteria of 122 F.Next Rept Expected by 870116 + (02:17:18, 4 December 2024)
- ML20215N716 + (02:17:18, 4 December 2024)
- PNO-III-86-125, on 861031,operator Inadvertently Skipped Step in Rod Withdrawal Procedure & Pulled Next Rod in Sequence Out One Notch (6 Inches).Rod Reinserted to Proper Position & Correct Rod Sequence Restored + (02:17:19, 4 December 2024)
- ML20215N713 + (02:17:19, 4 December 2024)
- ML20215N712 + (02:17:20, 4 December 2024)
- ML20215N708 + (02:17:21, 4 December 2024)
- ML20215N711 + (02:17:21, 4 December 2024)
- ML20215N706 + (02:17:22, 4 December 2024)
- 05000304/LER-1986-020-04, :on 861004,1x2 Ft Hole Discovered in Wall Between Charging Pump Rooms 2A & 2B W/O Posting of Fire Watch as Required by Tech Specs.Caused by Failure of Supervisor to Follow Station Procedures + (02:17:24, 4 December 2024)
- B12244, Forwards Reviews for Isap Topics 1.29, Flooding Evaluation, 1.53, Containment Emergency Sump Performance & 1.62, Feed & Bleed Sys Mod + (02:17:25, 4 December 2024)
- ML20215N701 + (02:17:25, 4 December 2024)
- 05000461/LER-1986-018, :on 861026,during Mode 5 Surveillance on RCIC, RWCU Outboard Containment Isolation Occurred Due to Loss of Power.Caused by Personnel Error.Test Personnel Instructed. Surveillance Procedure Revised + (02:17:27, 4 December 2024)
- ML20215N697 + (02:17:28, 4 December 2024)
- ML20215N696 + (02:17:28, 4 December 2024)
- PNO-V-86-074, on 861028,main Steam Valves Found W/Missing & Loosened Nuts That Secure Valve Disc to Hinge Arm. Deficiencies Discovered During Visual Exam as Part of Inservice Testing Exam + (02:17:29, 4 December 2024)
- ML20215N690 + (02:17:30, 4 December 2024)
- ML20215N688 + (02:17:31, 4 December 2024)
- ST-HL-AE-1795, Forwards Annotated Pages of FSAR Section 7.5.6 Re Channel Independence,Per Qualified Display Processing Sys Third Audit on 860715-16.Changes Will Be Incorporated Into Future FSAR Amend.Related Correspondence + (02:17:31, 4 December 2024)
- ML20215N686 + (02:17:32, 4 December 2024)
- PNO-V-86-076, on 861031,55-gallon Waste Drum Washed Ashore at Fort Stephens State Park.Us Naval Shipyard at Bremerton,Wa Claims Responsibility & Personnel Sent to Retrieve Drum. Radiological Survey Performed & No Contamination Present + (02:17:33, 4 December 2024)
- ML20215N680 + (02:17:37, 4 December 2024)
- ML20215N679 + (02:17:37, 4 December 2024)
- ML20215N677 + (02:17:38, 4 December 2024)
- ML20215N678 + (02:17:38, 4 December 2024)
- ML20215N675 + (02:17:39, 4 December 2024)
- PNO-IV-86-033, on 861104,power Reduced from 100% to Go to Cold Shutdown to Repair body-to-bonnet Seal Ring Leak on Check Valve a in Main Feed Header to Steam Generator B.Leak Rate Estimated to Be Approx 2 to 3 Gpm + (02:17:39, 4 December 2024)
- ML20215N670 + (02:17:40, 4 December 2024)
- ML20215N672 + (02:17:40, 4 December 2024)
- B12248, Forwards Reviews for Isap 1.04, Seismic Qualification of Safety-Related Piping, Isap 1.50, Fracture Toughness of Supports & Isap 1.56, Bolting Degradation, in Accordance W/Jf Opeka + (02:17:41, 4 December 2024)
- ML20215N668 + (02:17:42, 4 December 2024)
- ML20215N665 + (02:17:43, 4 December 2024)