Informs That Figure a, Acceleration Input,Conduit Damping, Figure B, Comparison of Multi-Tiered Cable Tray Sys & Figure C, Relationship of Connection Stiffness to Damping, Withheld (Ref 10CFR2.790(b)(5)),per 860519 Request
ML20215N712
Person / Time
Site: Washington Public Power Supply System
Issue date: 11/04/1986
From: Khadijah West
Office of Nuclear Reactor Regulation
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8611070186
Download: ML20215N712 (4)


Text

g i

O)Q November 4, 1986 Docket No.

50-460 Mr. D. W. Mazur Managing Director Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, WA 99352

Dear Mr. Mazur:

SUBJECT:

REQUEST TO WITHHOLD PROPRIETARY INF0PMATION FROM PUBLIC DISCLOSURE -

SUPPLY SYSTEM NUCLEAR PROJECT N0. 1 (WNP-1)

By letter dated May 19, 1986, you submitted an evaluation of electrical cable tray and conduit system seismic damping for WNP-1 and requested that Figure A,

" Acceleration Input - Conduit Damping," Figure B, " Comparison of Multi-Tiered Cable Tray Systems," and Figure C, " Relationship of Connection Stiffness to Damping," of Enclosure 1 to your letter, be withheld from public disclosure under the provisions of 10 CFR 2.790. Additionally, you provided non-proprietary copies of Enclosure I which have Figures A, B, and C removed. Affidavits executed by officials of the Supply System and Bechtel Power Corporation (Bechtel) accompanied your submittal.

In his affidavit, Mr. Charles W. Lacey, Vice President, Bechtel, stated that Figures A, B, and C are Bechtel documents and are Bechtel's procedure describing Bechtel's means and methods for performing calculations relating to the design and construction of nuclear power plants and should be exempt from mandatory public disclosure because:

(1) the figures contain Bechtel trade secrets, proprietary and confidential discoveries, information, data, and records of a type customarily held in confidence by Bechtel, (2) the information was transmitted to the Commission in. confidence, (3) the information is not available in public sources, and (4) public disclosure of the information is likely to cause substantial harm to Bechtel's competitive position in that the information represents unique approaches and capabilities for resolving complex safety, technical, commercial, and industry issues; substantial and significant effort and money have been expended to maintain these capabilities; and others would have difficulty in properly acquiring or duplicating this information.

We have reviewed your application and on the basis of Bechtel's statements, we have determined that Figures A, B, and C of Enclosure 1 to your May 19, 1986 letter contain trade secrets or proprietary commercial information. We will, 8611070186 861104 PDR ADOCK 05000460 A

PDR

l'

,.k.therefore, withhold the version of your letter marked " proprietary" from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the-Atomic Energy,ict of 1954, as amended.

Withholding from public. inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents..If the need arises, we will send copies of this information to.our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change such that the information could then be made available for public inspection, you should promptly notify us. You should also understand that we may have cause'to review this determination in the future, such as, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if we make a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, original signed by:

K. Steven West, Project Manager PWR Project Directorate #6 Division of PWR Licensing-B cc: See next page DISTRIBUTION EJordan Docket File BGrimes NRC PDR JPartlow L PDR SWest PBD-6 Rdg-CMcCracken FMiraglia TMarsh RIngram RLipinski CPoslusny

'E. Shoemaker, 0GC-MNBB 9604

  • See previous white for concurrences-name change only PBD-6*

PBD-6* -

PBD-6*

PBRS*

0GC*

RIngram SWest;jak CMcCracken TMarsh EShomaker 10/14/86 10/14/86 10/15/86 10/20/86 10/23/86

(

- (

4 u.

~

s s

Withholding from public inspection shall not affect the right, if any, of-persons properly and directly concerned to. inspect the documents.

If the ;1eed arises, we will send copies of this infomation to our consultants working in this area. We will, of course, ensure that.the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change such that the information could then be made available for public inspection, you should promptly notify us. You should also understand that we may have cause to review this determination in the future, such as, if the scope of a Freedom of Information Act request includes your information

.in, all review situations, if we make a determination adverse to the above, you will be notified in advance of any public disclosure.

f s

s Sincerely, i

1 5 J

K.StevenkWest,ProjectManager PWR Project Directorate #6 Division of PWR Licensing-B DISTRIBUTION EJordan Docket File BGrimes NRC PDR JPartlow

^

L PDR SWest A

PBD-6 Rdg CMcCracken FMiraglia TMarsh RIngram RLipinski CPoslusny E. Shoemaker, OGC-MNBB 9604 I

w 4

b.

PBD-PBD-PBD-6 PBRS OGC Ring SWest;jak CMcCracken TMarsh M

10/!k/86 10/%/86 10//[/86 10/$4/86 10/N/86

'...4 N

+

'd Mr. D. W. Mazur WPPSS Nuclear Project No. 1 A Washington Public Power Supply System (WNP-1) dlc -

  • CC:

..t Mr. V. Mani Mr. Curtis Eschels, Chairman J

. United Engineers & Constructors, Inc.

' State of Washington p

30 South 17th Street Energy Facility Site Evaluation

,, i' Philadelphia, Pennsylvania 19101 Council Mail Stop PY-11 Nicholas S. Reynolds, Esq.

Olympia, Washington 98504 Bishop,' Liberman, Cook, Purcell

.and.Reynolds s1200 Seventeenth Street, N.W.,

Mr. Eugene Rosolie Suite 700 Coalition for Safe Power

> Washington, D. C.

20036 Suite 5?7 408 South West Second Street Mr. E. G. Ward Portland.. Oregon 97204 f %'

Senior Project Manager p,

Babcock & Wilcox Company Nina Bell P.O. Box 1260 Nuclear Information and Resource' Lynchburg, Virginia 23505 Service i,l 1346 Connecticut Avenue, N.W.

3 8esident Inspector /WPPSS NPS Washington, D. C.

20036

^

e/o U.S. Nuclear Regrilatory m

Comission Attorney General P.O. Box 69 Temple of Justice Richland, Washington 99352 Olympia, Washington 98504 Mr. R. B. Borsum State Planning Division Nuclear Power Generation Division Office of Financial Management Babcock & Wilcox Room 105, House Office Building 7910 Woodmont Avenue, Suite 220 Olympia, Washington 98504 Bethesda, Maryland 20814 Chairman G. E. Craig Doupe, Esq.

Benton County Comissioners Washington Public Power Supply System County Court House 3000 George Washington Way Prosser, Washington 99350 N; i P. O. Box 968-Richland, Washington 99352

+

Regionti Administrator, Region V U.S. Nuclear Regulatory Commission, 1450 Maria Lane, Suite 210 l

Walnut Creek, California 94596 I

i

-