ML20215N747
ML20215N747 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 11/04/1986 |
From: | Thadani A Office of Nuclear Reactor Regulation |
To: | |
Shared Package | |
ML20215N743 | List: |
References | |
NUDOCS 8611070223 | |
Download: ML20215N747 (5) | |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _______
)
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION BALTIMORE GAS AND ELECTRIC COMPANY DOCKET NOS. 50-317 AND 50-318 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TO
. FACILITY OPERATING LICENSES AND OPPORTUNITY FOR PRIOR HEARING The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of amendments to Facility Operating Licenses Nos. DPR-53 and DPR-69 issued to the Baltimore Gas and Electric Company (the licensee), for operation of the Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2, located in Calvert County, Maryland.
The proposed amendments would modify Technical Specification Limiting Condition For Operation 3.1.1.4 by raising the upper limit for moderator temperature coefficient (MTC) above 70% Rated Thermal Power (RTP) from the current limit of less positive than + 0.2 E-4 delta k/k/ F to a proposed limit of less positive than + (1.16 .66 P) E-4 delta k/k/*F where P-is the Fraction
~
of Rated Power.
The increase in MTC to less than +0.50 E-4 at 100% RTP necessitates the changing of the reactor. coolant system (RCS) pressure limit for the safety analysis of the feed line break event concurrent with a loss of A.C. power. The previous safety analysis for this event had an RCS pressure limit of 2750 psig (110%ofdesignpressure). The proposed safety analysis RCS pressure limit is 3000 psig (120% of design pressure). This increase is based upon the low probability of occurrence of the event.
8611070223 PDR 861104 P
ADOOK 05000317 PDR
1 This proposed TS revision is in partial response to the licensee's application for amendments dated July 31, 1986. The remaining issues associated-with the July 31, 1986 application will be addressed in separate actions.
Prior to issuance of the proposed license amendments, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commi,ssion's regulations.
By December 10, 1986 ,, the licensee may file a ' request for a hearing with respect to issuance of the amendments to the subject facility operating licenses and any person whose interest may be affected by this proceeding and' +
who wishes to participate as a party in the proceeding must file a written petition for leave to intervene. Request for a hearing and petitions for leave to intervene shall be filed in accordance'with the Commission's " Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2. If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board, designated by the Comission or by the Chairman of the Atomic Safety and Licensing Board Panel, wil1
, , rule on the request and/or petition and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 62.714, a petition- for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and j how that interest may be affected by the results of the proceeding. The j petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors: (1)thenature i
of the petitiom r's right under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which i
may be entered in the proceeding on the petitioner's interest. The petition should also identify the specific aspect (s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any person who has filed a. petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to 15 days
, prior to the first prehearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter, and the bases for each contention set forth with reasonable specificity. Contentions shall be limited to matters within the scope of the amendments under consideration. A petitioner who fails to file such a supplement which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses.
A request for a hearing or a petition for leave to intervene must be filed with the Secretary of the Commission, U. S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Docketing and Service Branch, or may be delivered to the Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C., by the above date. Where petitions are filed during the last 10 days of the notice period, it is requested that the petitioner promptly so inform the Commission by a toll-free telephone call to Western
- l l
l Unionat(800)325-6000(inMissouri(800)342-6700). The Western Union operator should be given Datagram Identification Number 3737 and the following
- message addressed to Ashok C. Thadani: (petitioner's name and telephone number), (date petition was mailed), (plant name), and (publication date and page number of this FEDERAL REGISTER notice). A copy of the petition should
, also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, and to D. A. Brune, Jr., General Counsel, Baltimore Gas & Electric Company, P. O. Box 1475, Baltimore, Maryland 21203, attorney for the licensee.
Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a determination by the Commission, the presiding officer or the
~
presiding Atomic' Safety and Licensing Board, that the petition and/or request should be granted based upon a balancing of factors specified in 10 CFR 2.714'a)(1)(1)-(v)and2.714(d).
(
For further details with respect to this action, see the application for amendments dated July 31, 1986 which is available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C.'and at the Calvert County Library, Prince Frederick, Maryland.
Dated at Bethesda, Maryland this 4th day of November 1986.
FOR THE NUCLEAR REGULATORY COMMISSION kGhfW Ashok .'Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B
. STRIRUBION:
Docket Rdg
?!avember 4,1986 PKreutzer SMcNeil DOCKET NO. 50-317/318 Rules and Procedures Branch MEMORANDUM FOR: Division of Rules and Records Office of Administration FROM: Office of Nuclear Reactor Regulation susaEcT: CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT N05.1 AND 2 One signed original of the FederaI Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 6 )'of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit (s) and Operating License (s).
Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Time for Submission of Views on Antitrust Matters.
Notice of Consideration of issuance of Amendment to Facility Operating License.
Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hearing.
Notice of Availability of NRC Draft / Final Environmental Statement.
Notice of Limited Work Authorization.
Notico of Availability of Safety Evaluation Report.
Notice of issuance of Construction Permit (s).
Notice of issuance of Facility Operating License (s) or Amendment (s).
Order.
Exemption.
Notice of Granting Exemption.
Environmental Assessment.
Notice of Preparation of Environmental Assessment.
Other: Please call Caryn Faircloth Y27258, and inform her of the date in be inserted on page 2.
Office of Nuclear Reactor Regulation
Enclosure:
As stated
Contact:
Caryn Faircloth Phone: 27258
- = - !80#8...,. .
cu:Nau:> PKreilt/d.r..;.cf
.g NE * . /. . . . . . .
e:c rnu m ooison wacu o24o OFFICIAL RECORD COPY