Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216C096 + (01:57:33, 4 December 2024)
- NRC-98-0053, 1997 Annual Financial Rept for Detroit Edison Company + (01:57:35, 4 December 2024)
- ML20216C091 + (01:57:36, 4 December 2024)
- PNO-II-98-014, on 980309,licensee Reported Theft of Troxler Moisture Density Gauge.Stolen Gauge Contains 8 Mci Cs-137 & 40 Mci Am-241/Beryllium.Notified Local Law Enforcement Officials & Intitiated Investigation + (01:57:37, 4 December 2024)
- ML20216C087 + (01:57:37, 4 December 2024)
- 05000412/LER-1997-004-01, :on 970911,discovered That Four Containment Isolation Valves Were Not Tested IAW Ts.Caused by Inadequate Mgt Change.Will Revise Licensing Requirements Manual Table 5.1-1 & UFSAR Table 6.2-60 + (01:57:40, 4 December 2024)
- ML20216C081 + (01:57:40, 4 December 2024)
- 05000245/LER-1997-032, Forwards LER 97-032-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970731,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed + (01:57:41, 4 December 2024)
- PNO-II-98-013, on 980308,util Declared NOUE Due to High River Level & Subsequent Flooding.Licensee Established Constant Communications W/Early,Ga & Houston County,Al.Resident Inspectors Are Monitoring Licensee Activities + (01:57:42, 4 December 2024)
- ML20216C078 + (01:57:42, 4 December 2024)
- B17102, Proposed Tech Specs Changing TSs 3.4.4, RCS - Pressurizer, 3.6.1.5, Containment Sys - Air Temp & 3.7.1.5, Plant Sys - Msli Valves + (01:57:43, 4 December 2024)
- ML20216C077 + (01:57:43, 4 December 2024)
- ML20216C074 + (01:57:44, 4 December 2024)
- ML20216C073 + (01:57:45, 4 December 2024)
- ML20216C069 + (01:57:47, 4 December 2024)
- ML20216C067 + (01:57:48, 4 December 2024)
- ML20216C065 + (01:57:49, 4 December 2024)
- ML20216C063 + (01:57:50, 4 December 2024)
- ML20216C057 + (01:57:51, 4 December 2024)
- ML20216C056 + (01:57:51, 4 December 2024)
- ML20216C054 + (01:57:52, 4 December 2024)
- ML20216C055 + (01:57:52, 4 December 2024)
- ML20216C053 + (01:57:53, 4 December 2024)
- ML20216C052 + (01:57:54, 4 December 2024)
- ML20216C049 + (01:57:57, 4 December 2024)
- ML20216C046 + (01:57:58, 4 December 2024)
- 05000325/LER-1987-018-01, :on 870502,discovered That Loop Isolation Valve Would Not Fully Close Against Sys Operating Pressure.Caused by Undersized Belleville Washer Spring Pack Valve Operator. Washer Spring Pack Replaced + (01:58:03, 4 December 2024)
- ML20216C039 + (01:58:06, 4 December 2024)
- ML20216C040 + (01:58:06, 4 December 2024)
- 05000334/LER-1998-013, :on 980217,discovered That RCS Loop Stop Valves Limit Switch Interlocks Were Not Tested IAW Ts.Caused by Inadequate Application of TS Srs.Initiated Procedure Mods to Include Required Status Light Testing + (01:58:09, 4 December 2024)
- 3F0398-21, Special Rept:On 980302,insp Vendor Notified FPC That Grease Sample for Tendon 51H25 Had Water Content of 14.9% Volume by Weight.Caused Undeterminate.Subject Tendon Was Partially re-greased During Performance of Surveillance + (01:58:09, 4 December 2024)
- ML20216C033 + (01:58:10, 4 December 2024)
- ML20216C032 + (01:58:11, 4 December 2024)
- SVP-98-135, Forwards Rept Crn 98-02, Safe Shutdown Rept for Quad Cities Station,Units 1 & 2. Safe Shutdown Rept Provided Quad Cities Revised Safe Shutdown Analysis in Event of Fire. Overview of Contents,Encl + (01:58:11, 4 December 2024)
- ML20216C029 + (01:58:12, 4 December 2024)
- ML20216C027 + (01:58:13, 4 December 2024)
- ML20216C028 + (01:58:13, 4 December 2024)
- 05000334/LER-1998-012, :on 980204,discovered That Capacitors Could Not Be Gauranteed to Withstand Consequences.Caused by Inadequate Implementation of Vendor Instructions.Filled Voids Between Capacitors & Circuit Boards W/Silicon Rubber + (01:58:15, 4 December 2024)
- U-602927, Updates on Status of Plans for Refurbishment & Maintenance of ABB 480-volt K-Line Circuit Breakers,Ge 4160-volt Magne- Blast Circuit Breakers & W 4160-volt & 6900-volt Dhp Circuit Breakers + (01:58:16, 4 December 2024)
- ML20216C022 + (01:58:19, 4 December 2024)
- ML20216C020 + (01:58:20, 4 December 2024)
- ML20216C019 + (01:58:20, 4 December 2024)
- B16672, Provides Response to Second Request for Addl Info Re Third 10-year Interval ISI Program Plan as Requested by 970611 NRC Ltr.Listed Commitments Contained in Ltr + (01:58:21, 4 December 2024)
- ML20216C013 + (01:58:22, 4 December 2024)
- RC-98-0075, Forwards Summary of Present Levels of Property Insurance & Cash Flow Statement for Virgil C Summer Nuclear Station,Per 10CFR50.54(w) & 10CFR140.21(e) Rept + (01:58:22, 4 December 2024)
- ML20216C011 + (01:58:23, 4 December 2024)
- ML20216C012 + (01:58:23, 4 December 2024)
- ML20216C010 + (01:58:24, 4 December 2024)
- PNO-II-97-051, on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened + (01:58:25, 4 December 2024)
- ML20216C007 + (01:58:25, 4 December 2024)
- ML20216C005 + (01:58:26, 4 December 2024)