Forwards Semi-Annual Long Term Program, Update Which Includes Schedule,Commitment Descriptions,Progress Since Last Update & Summary of Changes
ML20216C057
Person / Time
Site: Pilgrim
Issue date: 08/29/1997
From: Oheim H
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216C061 List:
References
BECO-2.97.086, NUDOCS 9709080215
Download: ML20216C057 (3)


Text

.___-_-_

f f

e b.,+

Boston Edloon Pilgem Nudear Power $tation Rocky Hill Road Plymouth. Massachusetts 02360 Henry V. Oholm August 29, 1997 cenerai u nager. Technic.i cecion BECo 2.97.086 U.S. Nuclear Regulatory Commission l

Document Control Desk Washington, DC 20555 License DPR 35 Docket 50 293 LONG TERM PROGRAM 1_ SEMI ANNUAL REPORT This letter provides the semi annual Long Term Program (LTP) update. The update includes a schedule, commament descriptions, progress since the last update, and a summary of changes.

Changes in status since our last submittal are marked by revision bars in the right margins.

?ince the last update, we have completed the following:

Neutron Flux Monitoring (GL 82-33)

MOV Project (GL 89-10) e Inspection of the Core Shroud for Intergranular Stress Corrosion Cracking (GL 94 03) e Relocation of the northern Emergency Reception Center from the South Weymouth Naval Air e

Station to Braintree

-- Testing of Safety Related Logic Circuits (GL 96-01)

These will be removed from future LTP reports.

Schedule Revisions include; BWR Thermal Hydraulic Instabilities (GL 94-02) e Salt Service Water System (GL 8913)

\\

Equipment Operability (GL96-06)

\\

If you have any questions on the contents of this report, please dimet them to Kristin R. DiCroce of our Regulatory Affairs Department at (508) 830-7667.

/'

9709000215 970829

/

PDR ADOCK 05000293 g/

P PM H. V. Oheim HVO/KRD/LTP97CVR :

Long Term Program (LTP) Schedule l' :

LTP Schedule B ltems :

LTP Schedule C ltems b.lkll lhlhhl

,.3,n, M

i i

O l

l l

U.S. Nuclear Regulatory Commission Page 2 l

cc: Mr. Alan B. Wang, Project Manager Project Directorate 13 Office of Nuclear Reactor Regulation Mail Stop: OWF 1482 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident inspector Pilgrirn Nuclear Power Station m -..

4 g

N i

l 5 i n

-g k

i E$

i I

i s a

a E

q

-l b

i 3

J d

5}

5 1

l !

i I

i i

t l

1 :

t i l a

8 8

8 8

8 8

a 8

8 8

b i

l i l e

l g< l i j t z

i i
i a

J l i l l

! ! } j s e j i a

a 0

i s

3 i 1 1 1 B

s i j !

u

.1