Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/LER-1979-040-01, /01T-0 on 790523:during Repair Outage,Two Feedwater Flow Elements Found Piped to Wrong Low Pressure Taps.Caused by Personnel Error During Const.Flow Elements Were Repiped to Correct Taps + (20:25:50, 3 January 2025)
- ML19259C280 + (20:25:51, 3 January 2025)
- ML19259C279 + (20:25:52, 3 January 2025)
- 05000325/LER-1979-032, Forwards LER 79-032/03L-0 + (20:25:53, 3 January 2025)
- 05000366/LER-1979-040, Forwards LER 79-040/01T-0 + (20:25:55, 3 January 2025)
- ML19259C274 + (20:25:56, 3 January 2025)
- ML19259C273 + (20:25:57, 3 January 2025)
- 05000304/LER-1978-078-03, /03L-0 on 780521:status Lights for High Steam Flow Would Not Remain Energized When Radiographic Test Push Button Was Depressed.Caused by Defective Transistors Q5 & Q7 in Module (Model 4111084-004) + (20:25:59, 3 January 2025)
- ML19259C271 + (20:26:00, 3 January 2025)
- 05000366/LER-1979-039, Forwards LER 79-039/01T-0 + (20:26:01, 3 January 2025)
- 05000304/LER-1978-078, Forwards LER 78-078/03L-0 + (20:26:04, 3 January 2025)
- 05000366/LER-1979-041-01, /01T-0 on 790523:during Maint Outage,Review Indicated Solenoid on Reactor Sample Isolation Valve Did Not Have Complete Qualification Testing.Caused by Design Error. Solenoid Will Be Replaced + (20:26:06, 3 January 2025)
- 05000366/LER-1979-041, Forwards LER 79-041/01T-0 + (20:26:08, 3 January 2025)
- ML19259C258 + (20:26:09, 3 January 2025)
- ML19259C257 + (20:26:10, 3 January 2025)
- ML19259C256 + (20:26:12, 3 January 2025)
- ML19259C255 + (20:26:12, 3 January 2025)
- ML19259C254 + (20:26:13, 3 January 2025)
- ML19259C253 + (20:26:13, 3 January 2025)
- ML19259C250 + (20:26:15, 3 January 2025)
- ML19259C251 + (20:26:15, 3 January 2025)
- ML19259C249 + (20:26:17, 3 January 2025)
- ML19259C248 + (20:26:18, 3 January 2025)
- ML19259C246 + (20:26:20, 3 January 2025)
- ML19259C245 + (20:26:21, 3 January 2025)
- ML19259C243 + (20:26:23, 3 January 2025)
- ML19259C242 + (20:26:25, 3 January 2025)
- ML19259C241 + (20:26:27, 3 January 2025)
- ML19259C240 + (20:26:28, 3 January 2025)
- ML19259C239 + (20:26:29, 3 January 2025)
- ML19259C236 + (20:26:36, 3 January 2025)
- ML19259C234 + (20:26:38, 3 January 2025)
- ML19259C233 + (20:26:40, 3 January 2025)
- ML19259C232 + (20:26:43, 3 January 2025)
- ML19259C231 + (20:26:44, 3 January 2025)
- ML19259C230 + (20:26:46, 3 January 2025)
- 05000344/LER-1979-009-03, /03L-0 on 790504:three Transmitters Found Less Conservative than Tech Spec Limits.Caused by Normal Instrument Drift.Transmitters Recalibr within Tech Spec Limits + (20:26:52, 3 January 2025)
- ML19259C228 + (20:26:53, 3 January 2025)
- ML19259C227 + (20:26:55, 3 January 2025)
- ML19259C226 + (20:26:56, 3 January 2025)
- 05000344/LER-1979-009, Forwards LER 79-009/03L-0 + (20:27:00, 3 January 2025)
- 05000366/LER-1979-037-03, /03L-0 on 790517:during Cold Shutdown,Technicians Inadvertently Set Isolation Trip Setpoint of Alarm Units 2G31-K603A&B for Leakage Flow of 134 Gallons/Minute. Caused by Incorrect Procedure.Procedure Revised + (20:27:40, 3 January 2025)
- ML19259C222 + (20:27:43, 3 January 2025)
- 05000366/LER-1979-037, Forwards LER 79-037/03L-0 + (20:28:16, 3 January 2025)
- 05000295/LER-1979-012-99, /99X-0 on 790327:safety Injection Initiated Due to Hi Steam Flow Signal Coincident W/Low Steam Pressure Bistables Tripped for Surveillance Testing.Caused by Setpoint Dropping to 40% During Inadvertent Reactor Trip + (20:28:25, 3 January 2025)
- 05000295/LER-1979-012, Forwards LER 79-012/99X-0 + (20:28:30, 3 January 2025)
- ML19259C216 + (20:28:33, 3 January 2025)
- ML19259C215 + (20:28:37, 3 January 2025)
- ML19259C214 + (20:28:38, 3 January 2025)
- 05000245/LER-1979-014-03, /03L-0 on 790511:during Audit of Refuel Outage Surveillances,Source Range Monitor Functional Surveillance Was Inadvertently Overlooked.Caused by Failure of Monitor Functional to Be Listed in Refueling Checklist + (20:28:43, 3 January 2025)
- 05000245/LER-1979-014, Forwards LER 79-014/03L-0 + (20:28:47, 3 January 2025)