ML19259C250
| ML19259C250 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 05/10/1979 |
| From: | Wuller G ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 7906140464 | |
| Download: ML19259C250 (1) | |
Text
..
b J+44 k-U-0093 ILL/NOIS POWER 00MPANY I.
LO8-79(05-10)-0 L_,
500 SOUTH 271H STREET, DECATUR, ILLINOIS 62525 May 10, 1979 Mr. James G. Keppler Director, Region III Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Reference:
IE Bulletin No. 79-03, " Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Manufactured by Youngstown Welding and Engineering Company"; March 12, 1979 Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Construction Permits No. CPPR-137 & CPPR-138 Illinois Power Company will inform you in accordance with the referenced IE Bulletin 79-03 of any ASME SA-312 Type 304 stainless steel piping manufactured by Youngstown Welding and Engineering Company in safety related systems by December 31, 1979.
At that time we will also describe our intended action.
Sincerely, G. E. Wuller Licensing Administrator Generation Engineering Department PEW /jh cc:
NRC Office of Inspection & Enforcement Division of Reactor Construction Inspection Washington, DC 20555 2279 168 f 141979 7906140/fff